PREPARING ROW
|
STA
|
93.810
|
$600.000
|
$3,500.000
|
$1,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
213.000
|
$18.000
|
$12.000
|
$12.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,534.000
|
$20.000
|
$12.000
|
$12.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
3,507.000
|
$10.000
|
$5.000
|
$10.250
|
|
|
REMOVING CONC (MISC)
|
CY
|
581.000
|
$80.000
|
$30.000
|
$90.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
39,553.000
|
$5.000
|
$5.000
|
$2.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
57,605.000
|
$10.000
|
$5.500
|
$5.500
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
700.000
|
$9.000
|
$20.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
24,431.000
|
$20.000
|
$8.000
|
$7.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
49,942.000
|
$2.000
|
$1.050
|
$1.550
|
|
|
BLOCK SODDING
|
SY
|
49,942.000
|
$4.000
|
$4.000
|
$3.750
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
24,971.000
|
$7.000
|
$0.300
|
$0.300
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
24,971.000
|
$1.000
|
$0.300
|
$0.300
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
24,971.000
|
$1.000
|
$0.760
|
$0.780
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
24,971.000
|
$1.000
|
$0.720
|
$0.740
|
|
|
VEGETATIVE WATERING
|
MG
|
1,648.000
|
$10.000
|
$7.000
|
$2.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
61,175.000
|
$20.000
|
$27.000
|
$25.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
496.000
|
$180.000
|
$185.000
|
$200.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
31,017.000
|
$2.500
|
$3.500
|
$2.250
|
|
|
CEMENT
|
TON
|
496.000
|
$2.000
|
$165.000
|
$175.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
31,017.000
|
$3.000
|
$2.250
|
$2.000
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
18,094.000
|
$5.000
|
$5.000
|
$3.350
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
52,476.000
|
$3.000
|
$3.500
|
$3.150
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
1,250.000
|
$110.000
|
$115.000
|
$135.000
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
3,387.000
|
$65.000
|
$108.000
|
$110.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
520.000
|
$60.000
|
$122.000
|
$120.000
|
|
|
D-GR HMA TY-B PG64-22(LEVEL-UP)
|
TON
|
3,943.000
|
$65.000
|
$108.000
|
$122.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,597.000
|
$2.000
|
$4.000
|
$2.300
|
|
|
CUT & RESTORING PAV
|
SY
|
425.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
467.000
|
$200.000
|
$275.000
|
$205.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
9,837.000
|
$5.500
|
$2.000
|
$4.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
11,022.000
|
$35.000
|
$8.000
|
$30.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
26.000
|
$245.000
|
$200.000
|
$200.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$690.000
|
$580.000
|
$585.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
1.000
|
$800.000
|
$1,000.000
|
$1,350.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
100.000
|
$165.000
|
$160.000
|
$155.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
519.000
|
$200.000
|
$195.000
|
$235.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
779.000
|
$210.000
|
$250.000
|
$300.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
120.000
|
$400.000
|
$275.000
|
$327.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
206.000
|
$220.000
|
$325.000
|
$495.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
120.000
|
$230.000
|
$330.000
|
$398.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
3,605.000
|
$265.000
|
$365.000
|
$440.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
503.000
|
$320.000
|
$385.000
|
$468.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
174.000
|
$335.000
|
$420.000
|
$515.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
1,241.000
|
$470.000
|
$430.000
|
$515.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
174.000
|
$430.000
|
$460.000
|
$550.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
4,222.000
|
$60.000
|
$50.000
|
$47.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
63.000
|
$75.000
|
$65.000
|
$67.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
467.000
|
$95.000
|
$90.000
|
$85.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
101.000
|
$90.000
|
$70.000
|
$59.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
103.000
|
$130.000
|
$115.000
|
$105.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
180.000
|
$140.000
|
$80.000
|
$72.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
19.000
|
$7,200.000
|
$4,500.000
|
$6,300.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
8.000
|
$5,500.000
|
$7,000.000
|
$5,200.000
|
|
|
INLET (COMPL)(CURB)(5FT)(NONE)
|
EA
|
9.000
|
$6,000.000
|
$6,000.000
|
$4,400.000
|
|
|
INLET (COMPL)(CURB)(5FT)(LEFT)
|
EA
|
2.000
|
$6,400.000
|
$6,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(CURB)(5FT)(LEFT-LEFT)
|
EA
|
26.000
|
$6,600.000
|
$7,000.000
|
$7,500.000
|
|
|
INLET (COMPL)(CURB)(5FT)(RIGHT)
|
EA
|
6.000
|
$6,400.000
|
$6,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(CURB)(5FT)(RIGHT-RIGHT)
|
EA
|
19.000
|
$6,600.000
|
$7,000.000
|
$7,800.000
|
|
|
INLET (COMPL)(CURB)(5FT)(BOTH)
|
EA
|
8.000
|
$7,200.000
|
$7,000.000
|
$8,200.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
3.000
|
$3,200.000
|
$3,500.000
|
$3,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$5,500.000
|
$6,500.000
|
$5,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
1.000
|
$6,000.000
|
$4,000.000
|
$5,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
4.000
|
$6,500.000
|
$6,500.000
|
$6,500.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$11,150.000
|
$10,000.000
|
$12,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$16,000.000
|
$25,000.000
|
$30,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$910.000
|
$700.000
|
$700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$970.000
|
$900.000
|
$900.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$7,700.000
|
$5,000.000
|
$7,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$1,000.000
|
$500.000
|
$1,200.000
|
|
|
REMOV STR (SET)
|
EA
|
11.000
|
$350.000
|
$500.000
|
$235.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
7.000
|
$1,100.000
|
$1,000.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
EA
|
13.000
|
$475.000
|
$2,000.000
|
$1,350.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
1.000
|
$780.000
|
$500.000
|
$1,200.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
64.000
|
$825.000
|
$400.000
|
$240.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,392,457.000
|
$800,000.000
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$4,000.000
|
$5,000.000
|
$4,400.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,448.000
|
$35.000
|
$36.000
|
$36.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,448.000
|
$10.000
|
$12.000
|
$13.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
213.000
|
$31.000
|
$28.000
|
$27.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
213.000
|
$11.000
|
$12.000
|
$13.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$97.000
|
$100.000
|
$195.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
8.000
|
$8.000
|
$50.000
|
$80.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,680.000
|
$2.750
|
$2.700
|
$2.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,680.000
|
$0.750
|
$0.900
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,330.000
|
$3.500
|
$3.500
|
$3.300
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
175.000
|
$5.000
|
$4.000
|
$3.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,505.000
|
$1.500
|
$1.200
|
$1.300
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$133.000
|
$125.000
|
$195.000
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
13,370.000
|
$46.000
|
$50.000
|
$52.000
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
309.000
|
$51.000
|
$75.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
120.000
|
$33.000
|
$100.000
|
$110.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$140.000
|
$100.000
|
$105.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
360.000
|
$6.000
|
$10.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$6.000
|
$10.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
120.000
|
$7.000
|
$10.000
|
$12.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$9.000
|
$10.000
|
$12.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
16,648.000
|
$25.000
|
$24.000
|
$28.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
9,006.000
|
$40.000
|
$33.000
|
$60.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,601.000
|
$22.000
|
$36.000
|
$36.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
4,439.000
|
$89.000
|
$85.000
|
$82.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
11,712.000
|
$60.000
|
$42.000
|
$52.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
5.000
|
$1,200.000
|
$1,700.000
|
$2,600.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
30.000
|
$1,800.000
|
$1,700.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$1,700.000
|
$4,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$2,600.000
|
$6,000.000
|
$3,000.000
|
|
|
CONC MEDIAN
|
SY
|
722.000
|
$45.000
|
$85.000
|
$90.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
73.000
|
$125.000
|
$100.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$20.000
|
$27.000
|
$27.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,201.000
|
$3.500
|
$4.000
|
$3.300
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$630.000
|
$220.000
|
$220.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
28.000
|
$215.000
|
$250.000
|
$360.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$250.000
|
$400.000
|
$495.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$375.000
|
$500.000
|
$635.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
355.000
|
$15.000
|
$6.600
|
$6.600
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
34.000
|
$20.000
|
$18.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
271.000
|
$30.000
|
$24.000
|
$24.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
510.000
|
$1.100
|
$1.100
|
$1.050
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,310.000
|
$1.500
|
$2.500
|
$2.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
569.000
|
$2.000
|
$2.600
|
$2.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
180.000
|
$2.500
|
$2.800
|
$2.800
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
3.000
|
$1,000.000
|
$600.000
|
$635.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,000.000
|
$700.000
|
$720.000
|
|
|
ELC SRV TY D 120/240 060(NS)AL(E)TP(O)
|
EA
|
1.000
|
$9,400.000
|
$5,000.000
|
$5,035.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$600.000
|
$685.000
|
$935.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$270.000
|
$455.000
|
$935.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,000.000
|
$1,100.000
|
$1,155.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
42.000
|
$335.000
|
$430.000
|
$425.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
1.000
|
$275.000
|
$260.000
|
$300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
45.000
|
$100.000
|
$115.000
|
$125.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
112.000
|
$0.160
|
$1.100
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
59,140.000
|
$0.310
|
$0.380
|
$0.380
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
36.000
|
$3.180
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
104.000
|
$0.250
|
$0.380
|
$0.380
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
59,174.000
|
$0.200
|
$0.380
|
$0.380
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
5.000
|
$4.000
|
$4.000
|
$3.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
312.000
|
$1.000
|
$2.000
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,216.000
|
$1.000
|
$2.000
|
$1.200
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
500.000
|
$1.000
|
$2.000
|
$1.400
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
500.000
|
$1.000
|
$2.000
|
$1.400
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
48.000
|
$2.500
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,705.000
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,123.000
|
$5.000
|
$6.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
4,155.000
|
$0.500
|
$0.720
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,471.000
|
$0.500
|
$0.720
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,410.000
|
$0.500
|
$0.720
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
19,202.000
|
$0.300
|
$0.550
|
$0.550
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
24.000
|
$170.000
|
$220.000
|
$210.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$265.000
|
$320.000
|
$320.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
9.000
|
$210.000
|
$300.000
|
$275.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
274.000
|
$3.000
|
$4.000
|
$3.850
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
449.000
|
$3.000
|
$4.000
|
$3.850
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
41,025.000
|
$0.500
|
$0.400
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
36.000
|
$2.500
|
$5.000
|
$1.500
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$3,500.000
|
$66,000.000
|
$65,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
9.000
|
$275.000
|
$250.000
|
$260.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
5.000
|
$210.000
|
$250.000
|
$260.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
9.000
|
$275.000
|
$250.000
|
$260.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$205.000
|
$250.000
|
$260.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
9.000
|
$275.000
|
$250.000
|
$260.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
2.000
|
$210.000
|
$2,850.000
|
$260.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
6.000
|
$95.000
|
$75.000
|
$75.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
5.000
|
$75.000
|
$100.000
|
$100.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
956.000
|
$1.250
|
$1.500
|
$1.450
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
966.000
|
$1.500
|
$1.700
|
$1.750
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
1,479.000
|
$1.750
|
$2.700
|
$2.750
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,297.000
|
$2.100
|
$3.300
|
$3.300
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$6,600.000
|
$13,000.000
|
$12,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
|
EA
|
1.000
|
$6,900.000
|
$15,000.000
|
$14,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN
|
EA
|
2.000
|
$15,700.000
|
$24,000.000
|
$24,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
6.000
|
$940.000
|
$1,200.000
|
$1,200.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
21,327.000
|
$100.000
|
$105.000
|
$103.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$10,000.000
|
$18,000.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$8,000.000
|
$8,000.000
|
$8,000.000
|
|
|
ILSN (LED) (6 D)
|
EA
|
3.000
|
$2,500.000
|
$36,000.000
|
$3,600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$125.000
|
$600.000
|
$125.000
|
|
|
VIVDS PROSR SYS
|
EA
|
1.000
|
$6,800.000
|
$7,000.000
|
$6,300.000
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
4.000
|
$1,800.000
|
$1,600.000
|
$1,675.000
|
|
|
VIVDS CNTRL SOFTWARE
|
EA
|
1.000
|
$850.000
|
$60.000
|
$550.000
|
|
|
VIVDS CABLING
|
LF
|
952.000
|
$3.500
|
$4.000
|
$4.250
|
|
Totals: |
$15,218,264.650
|
$15,164,540.890
|
$16,378,723.410
|