Show Job Controls
Bid Cobra

FRIO US 57 (0276-07-035)

Items: 72

County: FRIO
Length: 0.0000 MILES
Highway: US 57
District: SAN ANTONIO
Control Number: 0276-07-035
DBE Goal: 0.0%
Project: F 2B26(011)
Guaranty: $100,000.00
Time: 206 WORKING DAYS
Engineer's Estimate: $8,601,216.47
Date: 1:00 PM AUGUST 05, 2026 (in 5 weeks)
Contract Number: 8263013
Type: RESURFACE ROADWAY
Project ID: A00197422
Contract Type: Federal
Project Description: SPOT BASE REPAIR, OVERLAY, AND PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
FRIO US 57 (0276-07-035)
Project Name: N/A
Project: F 2B26(011)
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: ZAVALA/FRIO COUNTY LINE
Limits To: FM 140
Project Description: SPOT BASE REPAIR, OVERLAY, AND PAVEMENT MARKINGS
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

72 Total 0 of 72
FRIO  |  US 57  |  SAN ANTONIO  |  0276-07-035  |  1:00 PM AUGUST 05, 2026  |  $8,601,216.47  |  F 2B26(011)  |  RESURF ROADWAY  |  206 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 5.000
BACKFILL (TY A)
STA 7.680
COMPOST MANUF TOPSOIL (4")
SY 3,113.000
DRILL SEED (PERM_RURAL_SAND)
SY 3,113.000
DRILL SEED (TEMP_WARM_COOL)
SY 3,113.000
VEGETATIVE WATERING
TGL 48.600
D-GR HMA TY-D PG76-22
TON 28,281.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 4,017.000
TOM-C PG76-22 SAC-B
TON 17,580.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 16,951.000
PLANE ASPH CONC PAV(0" TO 0.5")
SY 213,355.000
PLANE ASPH CONC PAV (2.5")
SY 26,860.000
PLANE ASPH CONC PAV (0" TO 2-1/2")
SY 9,054.000
FLOWABLE FILL (EMBANKMENT)
CY 5.000
RIPRAP (MOW STRIP)(4 IN)
CY 38.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 4.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 4.000
CLEAN EXIST CULVERTS
EA 25.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 412.000
TMA (STATIONARY)
DAY 227.000
TMA (MOBILE OPERATION)
DAY 96.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 720.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 720.000
DRIVEWAYS (ACP)
SY 2,055.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 116,390.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 56,160.000
MTL W-BEAM GD FEN (TIM POST)
LF 350.000
REMOVE METAL BEAM GUARD FENCE
LF 434.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 41.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 12.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000
REMOVE SM RD SN SUP&AM
EA 53.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 6.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 69.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 78.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 11,114.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 177,004.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,387.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 94.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,232.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 198,531.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 38,671.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 28,455.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,018.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 56.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 10.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 16.000
PAVEMENT SLER 6"
LF 232,790.000
PAVEMENT SLER 8"
LF 2,018.000
PAVEMENT SLER 24"
LF 56.000
PAVEMENT SLER (ARROW)
EA 18.000
PAVEMENT SLER (WORD)
EA 10.000
PAVEMENT SLER (YLD TRI)
EA 16.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 11,686.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 116,795.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 4,068.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 100,241.000
REFL PAV MRKR TY I-C
EA 502.000
REFL PAV MRKR TY II-A-A
EA 1,638.000
UNDERSEAL COURSE
GAL 76,155.000
BONDING COURSE
GAL 61,109.000
FLAGGER CONTROL METHOD (DAY)
DAY 29.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $3,000.00