Show Job Controls
Bid Cobra

FORT BEND SH 99 (3510-04-070)

Items: 237

County: FORT BEND
Length: 0.0000 MILES
Highway: SH 99
District: HOUSTON
Control Number: 3510-04-070
DBE Goal: 0.0%
Project: STP 2B26(002)MM
Guaranty: $100,000.00
Time: 273 WORKING DAYS
Engineer's Estimate: $33,713,045.51
Date: 1:00 PM AUGUST 05, 2026 (in 5 weeks)
Contract Number: 8263007
Type: CONSTRUCT FRONTAGE ROADS
Project ID: A00191471
Contract Type: Federal
Project Description: CONSTRUCT 2-LANE NORTHBOUND FRONTAGE ROAD ON NEW LOCATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
FORT BEND SH 99 (3510-04-070)
Project Name: N/A
Project: STP 2B26(002)MM
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: WESTHEIMER PARKWAY
Limits To: CINCO RANCH BLVD
Project Description: CONSTRUCT 2-LANE NORTHBOUND FRONTAGE ROAD ON NEW LOCATION
FORT BEND SH 99 (3510-04-072)
Project Name: SH 99 NB FG, CINCO RANCH BL TO BAY HILL
Project: STP 2B26(002)MM
Length: 0.0000 MILES
Project Type: NEW LOCATION NON-FREEWAY
Limits From: CINCO RANCH BLVD
Limits To: BAY HILL BLVD
Project Description: CONSTRUCT 2-LANE NORTHBOUND FRONTAGE ROAD ON NEW LOCATION
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

237 Total 0 of 237
FORT BEND  |  SH 99  |  HOUSTON  |  3510-04-070  |  1:00 PM AUGUST 05, 2026  |  $33,713,045.51  |  STP 2B26(002)MM  |  CONSTRUCT FRONTAGE ROADS  |  273 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 118.180
REMOV CONC (PAV)
SY 17,053.000
REMOV CONC (RIPRAP)
SY 1,165.000
REMOV CONC (SAWCUT)
LF 1,567.000
REMOV CONC (RETAINING WALLS)
SY 39.000
REMOV CONC (WINGWALL)
CY 7.000
REMOV CONC (RAIL)
LF 961.000
REMOV CONC (FLUME)
SY 443.000
EXCAV (ROADWAY)
CY 37,515.000
EMBANK (FNL)(DC)(TY C)
CY 34,994.000
EMBANK (FNL)(DC)(TY C2)
CY 7,075.000
EMBANK (FNL)(DC)(TY E)(CSBE)
CY 756.000
COMPOST MANUF TOPSOIL (4")
SY 33,175.000
BLOCK SODDING
SY 25,019.000
STRAW OR HAY MULCH
SY 16,912.000
BROADCAST SEED (PERM_URBAN_CLAY)
SY 33,175.000
BROADCAST SEED (TEMP_WARM)
SY 225.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 33,175.000
DRILL SEED (TEMP_WARM_COOL)
SY 4,471.000
FERTILIZER
AC 19.860
VEGETATIVE WATERING
TGL 2,383.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 549.490
LIME TRT (EXIST MATL)(6")
SY 40,762.000
CEMENT
TON 285.000
CEMENT TRT (EXIST MATL)(6")
SY 21,172.000
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
SY 19,590.000
ASPHALT TRT BASE (GR 4)(PG 64)
TON 2,288.470
CONC PVMT (CRCP) (10")
SY 13,247.000
CONC PVMT (CRCP) (12")
SY 24,296.000
STRUCT EXCAV
CY 2,122.000
STRUCT EXCAV (BOX)
CY 5,755.000
STRUCT EXCAV (PIPE)
CY 2,581.000
CEM STABIL BKFL
CY 3,225.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 268.000
TRENCH EXCAVATION PROTECTION
LF 5,933.000
TEMPORARY SPL SHORING
SF 19,291.000
DRILL SHAFT (18 IN)
LF 160.000
DRILL SHAFT (30 IN)
LF 6,873.000
DRILL SHAFT (36 IN)
LF 286.000
DRILL SHAFT (42 IN)
LF 150.000
DRILL SHAFT (54 IN)
LF 187.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 150.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 104.000
SOUND WALL
SF 106,040.000
CL C CONC (ABUT)
CY 38.400
CL C CONC (ABUT)(EXTEND)
CY 36.200
CL C CONC (CAP)
CY 32.600
CL C CONC (COLUMN)
CY 26.200
CL C CONC (SIGN COLUMN)
CY 105.500
CL C CONC (SIGN FOOTING)
CY 39.200
REINF CONC SLAB
SF 4,763.000
REINF CONC SLAB (EXTEND SLAB)
SF 4,459.000
APPROACH SLAB
CY 52.400
RETAINING WALL (MSE)
SF 17,935.000
RETAINING WALL (CAST-IN-PLACE)
SF 714.000
PRESTR CONC GIRDER (TX46)
LF 1,282.080
RIPRAP (CONC)(4 IN)
CY 508.130
RIPRAP (CONC)(5 IN)
CY 210.000
RIPRAP (CONC)(CL B)
CY 2.800
RIPRAP (CONC) (CL B) (4 IN)
CY 261.800
RIPRAP (CONC)(FLUME)
CY 239.000
RIPRAP (MOW STRIP)(4 IN)
CY 302.000
BEDDING MATERIAL (3 IN)
CY 671.000
RAIL (TY SSTR)
LF 5,680.940
RAIL (TY PR11)
LF 354.670
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 59.000
CONC BOX CULV (3 FT X 2 FT)
LF 2,484.000
CONC BOX CULV (8 FT X 3 FT)
LF 2,155.000
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 153.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 25.000
RC PIPE (CL III)(18 IN)
LF 143.000
RC PIPE (CL III)(24 IN)
LF 2,012.000
RC PIPE (CL III)(30 IN)
LF 98.000
RC PIPE (CL III)(36 IN)
LF 75.000
RC PIPE (CL III)(42 IN)
LF 122.000
RC PIPE (CL V)(24 IN)
LF 46.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 4.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000
INLET (COMPL)(POD)(FG)(3FTX3FT)
EA 4.000
JUNCT BOX (COMPL)(JB)(7FT X 7FT)(FTW)
EA 1.000
INLET (COMPL)(CURB)(TY C1)(NONE)(HOU)
EA 18.000
INLET (COMPL)(CURB)(TY C1)(LEFT)(HOU)
EA 4.000
INLET (COMPL)(CURB)(TY C1)(RIGHT)(HOU)
EA 7.000
INLET (COMPL)(CURB)(TY C1)(BOTH)(HOU)
EA 9.000
INLET (COMPL)(TY A)(HOU)
EA 1.000
INLET (COMPL)(TY AAD)(HOU)
EA 10.000
INLET (COMPL)(TY AZR)(HOU)
EA 2.000
MANH (COMPL)(TY A)(HOU)
EA 11.000
WINGWALL (PW - 1) (HW=13 FT)
EA 1.000
WINGWALL (PW - 2) (HW=16 FT)
EA 1.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000
PRE-CAST TRENCH DRAIN (IN CONC PAVEMNT)
LF 120.000
ADJUSTING INLETS
EA 1.000
REMOV STR (INLET)
EA 9.000
REMOV STR (SET)
EA 3.000
REMOV STR (HEADWALL)
EA 1.000
REMOV STR (PIPE)
LF 286.000
REMOV STR (BOX CULVERT)
LF 71.000
REMOVE STR (RAIL)
LF 580.000
REMOV STR (RET WALL)
LF 607.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000
TMA (STATIONARY)
DAY 48.000
TMA (MOBILE OPERATION)
DAY 116.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 25.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 100.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 20.000
ROCK FILTER DAMS (REMOVE)
LF 145.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 738.000
CONSTRUCTION EXITS (REMOVE)
SY 738.000
SANDBAGS FOR EROSION CONTROL
EA 28.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,759.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,759.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 300.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,396.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,696.000
CONSTRUCTING DETOURS
SY 1,592.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 8,329.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 6,240.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 180.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 5,779.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 5,040.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 120.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 8,329.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 6,240.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 180.000
CONC CURB (MONO) (TY II)
LF 14,016.690
CONC SIDEWALKS (5")
SY 8,231.000
MTL W-BEAM GD FEN (TIM POST)
LF 450.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000
REMOVE METAL BEAM GUARD FENCE
LF 1,150.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 1.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 4.000
PIPE UNDERDRAINS (TY 6) (6")
LF 1,399.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 7.000
REMOVE RD IL ASM (TRANS-BASE)
EA 6.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 4.000
IN RD IL (TY AL) 40T-8 (250W EQ) LED
EA 6.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 8.000
CONDT (PVC) (SCH 40) (2")
LF 720.000
CONDT (PVC) (SCH 80) (2")
LF 2,055.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 4,360.000
CONDT (PVC) (SCH 80) (3")
LF 50.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 6,120.000
CONDT (RM) (2")
LF 380.000
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 12,180.000
ELEC CONDR (NO.14) INSULATED
LF 6,710.000
ELEC CONDR (NO.12) BARE
LF 230.000
ELEC CONDR (NO.12) INSULATED
LF 460.000
ELEC CONDR (NO.8) BARE
LF 7,855.000
ELEC CONDR (NO.8) INSULATED
LF 15,910.000
ELEC CONDR (NO.6) BARE
LF 8,850.000
ELEC CONDR (NO.6) INSULATED
LF 4,425.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 14.000
REMOVE ITS GROUND BOX
EA 9.000
GROUND BOX TY A (122311)W/APRON
EA 8.000
GROUND BOX TY C (162911)W/APRON
EA 5.000
REMOVE GROUND BOX
EA 11.000
RELOCATE ELECTRICAL SERVICES
EA 1.000
REMOVE ELECTRICAL SERVICES
EA 2.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000
ELC SRV TY A 240/480 060(SS)SS(E)GC(O)
EA 2.000
ELC SRV TY A 240/480 060(SS)SS(E)SP(U)
EA 2.000
ALUMINUM SIGNS (TY G)
SF 30.000
ALUMINUM SIGNS (TY O)
SF 857.250
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000
REMOVE SM RD SN SUP&AM
EA 22.000
INSTALL LRSS (STRUCT STEEL)
LB 325.000
RELOCATE LRSA
EA 1.000
REMOVE LRSA
EA 5.000
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
EA 1.000
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
EA 3.000
REMOVE OVERHD SIGN SUP
EA 4.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 2.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 6.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 6.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 9,041.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 30,161.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,331.000
WK ZN PAV MRK REMOV (W)6"(BKN W/MRKR)
LF 560.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 8.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 16,796.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 76.000
RE PM TY III (W)(6")(SLD)
LF 18,008.000
RE PM TY III (W)(6")(BRK)
LF 4,578.000
RE PM TY III (W)(8")(SLD)
LF 4,510.000
RE PM TY III (W)(12")(SLD)
LF 2,656.000
RE PM TY III (W)(12")(DOT)
LF 459.000
RE PM TY III (W)(24")(SLD)
LF 62.000
RE PM TY III (Y)(6")(SLD)
LF 12,568.000
RE PM TY III (BLK)(6")(SHADOW)
LF 3,411.000
PAVEMENT SLER (ARROW)
EA 8.000
PAVEMENT SLER (WORD)
EA 7.000
PAVEMENT SLER (DBL ARROW)
EA 1.000
PAVEMENT SLER (UTURN ARROW)
EA 2.000
PREFAB PM TY C (W)(ARROW)
EA 7.000
PREFAB PM TY C (W)(DBL ARROW)
EA 1.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 2.000
PREFAB PM TY C (W)(WORD)
EA 9.000
REFL PAV MRKR TY II-C-R
EA 637.000
ELIM EXT PM & MRKS (6")
LF 12,506.000
ELIM EXT PM & MRKS (8")
LF 1,822.000
ELIM EXT PM & MRKS (12")
LF 302.000
ELIM EXT PM & MRKS (ARROW)
EA 2.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 1.000
ELIM EXT PM & MRKS (WORD)
EA 2.000
PAV SURF PREP FOR MRK (6")
LF 37,375.000
PAV SURF PREP FOR MRK (8")
LF 4,510.000
PAV SURF PREP FOR MRK (12")
LF 3,115.000
PAV SURF PREP FOR MRK (24")
LF 62.000
PAV SURF PREP FOR MRK (ARROW)
EA 7.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 2.000
PAV SURF PREP FOR MRK (WORD)
EA 9.000
PAV SURF PREP FOR MRK (RPM)
EA 329.000
REMOVE LUMINAIRE POLE
EA 6.000
TREE REMOVAL (4" - 12" DIA)
EA 84.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000
ITS POLE (40 FT)(REM)
EA 1.000
FO CBL (96 SMF)
LF 12,060.000
INSTALL WRONG WAY DRIVER DETECTION SYS
EA 1.000
REMOVE WRONG WAY DRIVER DETECTION SYS
EA 1.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $145,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $180,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,000.00
Total: $332,000.00