PREPARING ROW
|
STA
|
68.000
|
|
|
REMOV CONC (PAV)
|
SY
|
8,196.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
312.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
1,144.000
|
|
|
REMOV CONC (CURB)
|
LF
|
1,459.000
|
|
|
REMOV CONC (CURB OR CURB & GUTTER)
|
LF
|
1,999.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
26,803.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
1,599.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
36,345.000
|
|
|
EMBANK (FNL)(DC)(TY E)(CSBE)
|
CY
|
2,894.000
|
|
|
EMBANK (FNL)(DC)(TY E)(CSBE_FND IMPR)
|
CY
|
1,567.000
|
|
|
EMBANK (FNL)(DC)(TY E)(CSBE_RWALL IMPR)
|
CY
|
2,049.000
|
|
|
BLOCK SODDING
|
SY
|
30,866.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
29,323.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
1,544.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
29,323.000
|
|
|
FERTILIZER
|
AC
|
8.910
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,069.700
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
404.000
|
|
|
LIME TRT (EXIST MATL)(6")
|
SY
|
28,054.000
|
|
|
CEMENT
|
TON
|
191.000
|
|
|
CEMENT TRT (EXIST MATL)(6")
|
SY
|
12,306.000
|
|
|
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
|
SY
|
41,147.000
|
|
|
ASPHALT TRT BASE (GR 4)(PG 64)
|
TON
|
2,126.000
|
|
|
CONC PVMT (CRCP) (10")
|
SY
|
38,518.000
|
|
|
STRUCT EXCAV
|
CY
|
3,616.000
|
|
|
CEM STABIL BKFL
|
CY
|
8,254.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
365.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
7,013.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,078.000
|
|
|
SHEET PILING (PZC - 18)
|
SF
|
1,650.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
272.000
|
|
|
PRESTR CONC PIL (20 IN SQ)
|
LF
|
4,085.000
|
|
|
PRESTR CONC PIL (24 IN SQ)
|
LF
|
2,163.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
9,825.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
194.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
274.000
|
|
|
SOUND WALL
|
SF
|
154,220.000
|
|
|
CL C CONC (ABUT)
|
CY
|
260.400
|
|
|
CL C CONC (CAP)
|
CY
|
285.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
20.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
102.000
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
20.000
|
|
|
REINF CONC SLAB
|
SF
|
44,915.000
|
|
|
APPROACH SLAB
|
CY
|
270.100
|
|
|
RET WALL (MSE) (HORIZONTAL SCHEME)
|
SF
|
23,866.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
2,075.900
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
3,580.520
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
326.700
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
56.000
|
|
|
RIPRAP (CONC) (CL B) (4 IN)
|
CY
|
380.800
|
|
Qty Changed
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
394.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
132.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
12.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
29.400
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
235.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
193.000
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
1,033.000
|
|
|
RAIL (TY SSTR)
|
LF
|
5,312.300
|
|
|
RAIL (TY C221)
|
LF
|
7,146.800
|
|
|
RAIL (TY PR11)
|
LF
|
586.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
476.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
456.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
837.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
86.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
42.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
3,644.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
4,042.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,236.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
556.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
129.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
4.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
1.000
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX3FT)
|
EA
|
1.000
|
|
|
INLET (COMPL)(CURB)(TY C1)(LEFT)(HOU)
|
EA
|
5.000
|
|
|
INLET (COMPL)(CURB)(TY C1)(RIGHT)(HOU)
|
EA
|
4.000
|
|
|
INLET (COMPL)(CURB)(TY C1)(BOTH)(HOU)
|
EA
|
25.000
|
|
|
INLET (COMPL)(TY AD)(HOU)
|
EA
|
9.000
|
|
|
INLET (COMPL)(TY AAD)(HOU)
|
EA
|
26.000
|
|
|
INLET (COMPL)(TY AZ2G)(HOU)
|
EA
|
4.000
|
|
|
INLET (COMPL)(TY AZR)(HOU)
|
EA
|
3.000
|
|
|
INLET (COMPL)(TY AZR2G)(HOU)
|
EA
|
3.000
|
|
|
MANH(COMP)(JUNCT BOX)
|
EA
|
7.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1)(C)
|
EA
|
1.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
1.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
|
|
REMOV STR (INLET)
|
EA
|
15.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
3.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,658.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
395.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
484.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
236.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
80.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,958.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,958.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
440.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,622.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,062.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
4,770.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
880.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
4,160.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
1,820.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,031.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,440.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
8,276.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,820.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
760.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
|
|
PORT CTB (CONNECTION HARDWARE)
|
EA
|
179.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
604.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
17,965.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
15,994.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
1,287.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
412.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
110.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
1,699.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
15.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
2.000
|
|
|
IN RD IL (U/P) (TY 1) (250W EQ) LED
|
EA
|
4.000
|
|
|
IN RD IL (TY AL) 40S-8 (250W EQ) LED
|
EA
|
11.000
|
|
|
IN RD IL (TY ST) 40T-8 (250W EQ) LED
|
EA
|
3.000
|
|
|
CONDT (HDPE) (2")
|
LF
|
3,313.000
|
|
|
CONDT (HDPE) (2") BORE
|
LF
|
252.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
11,380.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
350.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
3,107.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
11,730.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
300.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
5,865.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
6,600.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
12,034.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
150.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
150.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
150.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
150.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
8.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
11.000
|
|
|
REMOVE GROUND BOX
|
EA
|
5.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
|
EA
|
2.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)SP(O)
|
EA
|
2.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
310.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
312.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-EXAL)
|
EA
|
1.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
|
EA
|
2.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,294.600
|
|
|
INS OH SN SUP(20 FT CANT)(SPAN ONLY)
|
EA
|
2.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,541.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,826.000
|
|
RE PM TY II (W) (ENTR GORE)
|
EA
|
1.000
|
|
RE PM TY II (W) (EXIT GORE)
|
EA
|
1.000
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
8,686.000
|
|
RE PM TY III (W)(6")(BRK)
|
LF
|
10,320.000
|
|
RE PM TY III (W)(6")(DOT)
|
LF
|
808.000
|
|
RE PM TY III (W)(8")(SLD)
|
LF
|
2,420.000
|
|
RE PM TY III (W)(12")(SLD)
|
LF
|
2,635.000
|
|
RE PM TY III (W)(24")(SLD)
|
LF
|
950.000
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
3,426.000
|
|
RE PM TY III (BLK)(6")(SHADOW)
|
LF
|
10,320.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
8.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
8.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
2.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
2.000
|
|
|
PAVEMENT SLER (ENTR GORE)
|
EA
|
1.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
8.000
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
2.000
|
|
PREFAB PM TY C (W)(UTURN ARROW)
|
EA
|
2.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
8.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
871.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
3,423.000
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
1,157.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
100.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
8.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
6.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,725.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,620.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
100.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
5.000
|
|
|
VIVDS CABLE (INSTALL)
|
LF
|
200.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
|
|
DEBRIS REMOV-CNTR MED/MN LNS/RAMPS
|
CYC
|
6.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
16.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
250.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
1.000
|
|
|
FO CBL (12 SMF)(PIGTAIL)
|
LF
|
1,720.000
|
|
|
FO CBL (96 SMF)
|
LF
|
11,730.000
|
|
|
WIRELESS WWD SYSTEM
|
EA
|
1.000
|
|
|
WATER MAIN PIPE (PVC)(C900)(6 IN)
|
LF
|
395.000
|
|
|
WATER MAIN PIPE (PVC)(C900)(12 IN)
|
LF
|
770.000
|
|
|
CASING STEEL (18 IN)
|
LF
|
89.000
|
|
|
WET CONNECTION (12 IN)
|
EA
|
2.000
|
|
|
REMOVE EXIST WATER PIPE (12 IN)
|
LF
|
190.000
|
|
|
WET CONNECTION (6 IN)
|
EA
|
1.000
|