PREPARING ROW
|
STA
|
274.530
|
$600.000
|
$705.600
|
$495.500
|
$500.000
|
$510.500
|
$382.210
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
17.000
|
$17.000
|
$20.300
|
$20.000
|
$100.000
|
$20.000
|
$265.760
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
750.000
|
$10.000
|
$27.150
|
$20.000
|
$10.000
|
$15.000
|
$6.140
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
165.000
|
$7.000
|
$30.450
|
$21.240
|
$50.000
|
$35.000
|
$81.990
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
187.770
|
$250.000
|
$189.500
|
$189.880
|
$200.000
|
$250.000
|
$484.650
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
533.000
|
$15.000
|
$25.900
|
$13.150
|
$30.000
|
$35.000
|
$103.680
|
|
|
BACKFILL (TY A)
|
STA
|
136.270
|
$150.000
|
$210.850
|
$299.020
|
$250.000
|
$350.000
|
$270.290
|
|
|
BACKFILL (TY B)
|
STA
|
136.270
|
$150.000
|
$210.850
|
$224.260
|
$250.000
|
$150.000
|
$258.510
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
272.520
|
$175.000
|
$123.350
|
$186.900
|
$250.000
|
$312.000
|
$627.440
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
73,816.000
|
$0.100
|
$0.050
|
$0.040
|
$0.070
|
$0.010
|
$0.040
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
73,816.000
|
$0.100
|
$0.050
|
$0.040
|
$0.070
|
$0.020
|
$0.040
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
147,632.000
|
$0.220
|
$0.200
|
$0.190
|
$0.080
|
$0.200
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
885.790
|
$20.000
|
$10.300
|
$5.000
|
$10.000
|
$35.000
|
$26.880
|
|
|
PROOF ROLLING
|
HR
|
29.330
|
$75.000
|
$101.750
|
$102.670
|
$100.000
|
$115.000
|
$223.090
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
73,482.000
|
$11.000
|
$9.750
|
$12.140
|
$14.000
|
$12.200
|
$12.400
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
65,574.000
|
$1.750
|
$2.600
|
$2.020
|
$2.500
|
$3.250
|
$2.540
|
|
|
CEMENT
|
TON
|
448.000
|
$140.000
|
$145.500
|
$150.000
|
$150.000
|
$160.000
|
$152.320
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
73,482.000
|
$2.250
|
$1.600
|
$1.810
|
$2.750
|
$3.000
|
$3.560
|
|
|
ASPH (RC-250)
|
GAL
|
20,575.000
|
$5.000
|
$5.550
|
$4.960
|
$4.500
|
$5.000
|
$5.270
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
524.000
|
$120.000
|
$126.200
|
$126.700
|
$100.000
|
$115.000
|
$376.340
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
613.000
|
$125.000
|
$183.750
|
$168.550
|
$150.000
|
$160.000
|
$403.230
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
60,257.000
|
$5.000
|
$3.700
|
$3.830
|
$4.400
|
$4.750
|
$5.520
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
701.000
|
$130.000
|
$171.800
|
$131.780
|
$120.000
|
$122.000
|
$268.820
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
150.000
|
$21.000
|
$20.250
|
$20.000
|
$5.000
|
$20.000
|
$16.130
|
|
|
TEMPORARY SPL SHORING
|
SF
|
498.000
|
$25.000
|
$27.150
|
$40.000
|
$55.000
|
$80.000
|
$69.890
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
52.000
|
$500.000
|
$481.300
|
$475.000
|
$700.000
|
$475.000
|
$483.870
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
100.000
|
$150.000
|
$138.100
|
$207.360
|
$180.000
|
$125.000
|
$118.280
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
279.000
|
$180.000
|
$139.400
|
$207.360
|
$180.000
|
$240.000
|
$241.940
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
210.930
|
$450.000
|
$481.300
|
$475.000
|
$500.000
|
$475.000
|
$645.160
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
1,058.000
|
$275.000
|
$86.950
|
$281.000
|
$204.000
|
$294.000
|
$126.510
|
|
|
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
|
LF
|
23.000
|
$1,000.000
|
$1,215.950
|
$1,200.000
|
$1,100.000
|
$1,200.000
|
$1,129.030
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
60.000
|
$40.000
|
$35.500
|
$35.000
|
$35.000
|
$35.000
|
$48.390
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
60.000
|
$45.000
|
$40.500
|
$40.000
|
$38.000
|
$40.000
|
$51.610
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
60.000
|
$50.000
|
$50.650
|
$50.000
|
$42.000
|
$50.000
|
$55.910
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
66.000
|
$70.000
|
$70.950
|
$70.000
|
$65.000
|
$70.000
|
$134.410
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
12.000
|
$125.000
|
$202.650
|
$200.000
|
$250.000
|
$200.000
|
$155.910
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$4,000.000
|
$4,559.800
|
$4,500.000
|
$3,500.000
|
$4,500.000
|
$3,225.810
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$5,000.000
|
$5,573.100
|
$5,500.000
|
$5,000.000
|
$5,500.000
|
$6,989.250
|
|
|
HEADWALL (CH - FW - 45) (DIA= 48 IN)
|
EA
|
2.000
|
$10,000.000
|
$8,612.950
|
$8,500.000
|
$8,500.000
|
$8,500.000
|
$9,139.780
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
3.000
|
$9,000.000
|
$8,612.950
|
$8,500.000
|
$9,000.000
|
$8,500.000
|
$10,215.050
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$9,000.000
|
$9,119.600
|
$9,000.000
|
$12,000.000
|
$9,000.000
|
$10,752.690
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
1.000
|
$17,000.000
|
$15,199.350
|
$15,000.000
|
$22,500.000
|
$15,000.000
|
$15,053.760
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
2.000
|
$25,000.000
|
$28,372.100
|
$28,000.000
|
$32,000.000
|
$28,000.000
|
$2,150.540
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$875.000
|
$709.300
|
$700.000
|
$650.000
|
$700.000
|
$860.220
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
36.000
|
$875.000
|
$709.300
|
$700.000
|
$650.000
|
$700.000
|
$860.220
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$850.000
|
$911.950
|
$900.000
|
$740.000
|
$900.000
|
$860.220
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$1,114.600
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
$1,021.510
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$2,500.000
|
$2,634.550
|
$2,600.000
|
$2,000.000
|
$2,600.000
|
$2,688.170
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,600.000
|
$3,242.500
|
$3,200.000
|
$2,200.000
|
$3,200.000
|
$3,225.810
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$4,100.000
|
$5,066.450
|
$5,000.000
|
$4,700.000
|
$5,000.000
|
$3,763.440
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,900.000
|
$3,850.500
|
$3,800.000
|
$3,870.000
|
$3,800.000
|
$4,301.080
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
12.000
|
$45.000
|
$60.800
|
$60.000
|
$45.000
|
$60.000
|
$32.260
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
16.000
|
$50.000
|
$70.950
|
$70.000
|
$100.000
|
$70.000
|
$48.390
|
|
|
REMOV & RE - LAY PIPE (42 IN)
|
LF
|
4.000
|
$60.000
|
$81.100
|
$80.000
|
$250.000
|
$80.000
|
$59.140
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,500.000
|
$1,519.950
|
$1,500.000
|
$1,000.000
|
$1,500.000
|
$1,612.900
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$1,200.000
|
$1,013.300
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,344.090
|
|
|
REMOV STR (PIPE)
|
LF
|
140.000
|
$20.000
|
$15.200
|
$15.000
|
$50.000
|
$15.000
|
$21.510
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$349,224.890
|
$322,600.000
|
$341,112.000
|
$400,000.000
|
$247,000.000
|
$331,309.170
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$5,000.000
|
$4,503.300
|
$5,430.000
|
$5,000.000
|
$5,896.000
|
$7,292.520
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,056.000
|
$30.000
|
$34.450
|
$34.000
|
$45.000
|
$34.000
|
$36.560
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,056.000
|
$8.000
|
$5.100
|
$5.000
|
$10.000
|
$5.000
|
$5.380
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
816.000
|
$2.500
|
$2.050
|
$2.000
|
$3.000
|
$2.000
|
$2.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
816.000
|
$0.750
|
$0.500
|
$0.500
|
$1.000
|
$0.500
|
$0.540
|
|
|
INTERSECTIONS (ACP)
|
SY
|
711.000
|
$35.000
|
$52.250
|
$37.500
|
$100.000
|
$53.500
|
$45.010
|
|
|
DRIVEWAYS (CONC)
|
SY
|
17.000
|
$75.000
|
$111.450
|
$110.000
|
$250.000
|
$125.000
|
$304.830
|
|
|
TURNOUTS (ACP)
|
SY
|
252.000
|
$20.000
|
$78.700
|
$5.000
|
$75.000
|
$73.000
|
$107.650
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,854.000
|
$15.000
|
$8.850
|
$19.200
|
$20.000
|
$20.000
|
$33.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,340.000
|
$22.000
|
$20.300
|
$20.000
|
$18.000
|
$20.000
|
$21.510
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,000.000
|
$1,570.600
|
$1,550.000
|
$1,600.000
|
$1,800.000
|
$1,666.670
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
110.000
|
$70.000
|
$39.800
|
$39.250
|
$60.000
|
$39.250
|
$42.200
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
8.000
|
$420.000
|
$506.650
|
$500.000
|
$735.000
|
$500.000
|
$537.630
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,050.000
|
$2.250
|
$1.500
|
$1.500
|
$2.000
|
$1.500
|
$1.610
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$250.000
|
$126.650
|
$125.000
|
$150.000
|
$125.000
|
$134.410
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,700.000
|
$2,457.250
|
$2,425.000
|
$2,500.000
|
$2,425.000
|
$2,607.530
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
8.000
|
$132.000
|
$192.500
|
$189.000
|
$300.000
|
$210.000
|
$204.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
53.000
|
$525.000
|
$456.000
|
$469.000
|
$500.000
|
$600.000
|
$483.870
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$800.000
|
$567.450
|
$549.000
|
$600.000
|
$800.000
|
$602.150
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$850.000
|
$754.900
|
$699.000
|
$800.000
|
$1,000.000
|
$801.080
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,000.000
|
$947.450
|
$904.000
|
$935.000
|
$1,500.000
|
$1,005.380
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
65.000
|
$150.000
|
$76.000
|
$60.000
|
$100.000
|
$50.000
|
$80.650
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$18.250
|
$24.000
|
$20.000
|
$24.000
|
$19.350
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
39.000
|
$75.000
|
$45.600
|
$59.000
|
$65.000
|
$59.000
|
$48.390
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
40.000
|
$30.000
|
$25.350
|
$24.000
|
$35.000
|
$24.000
|
$26.880
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
110,640.000
|
$0.200
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.110
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
8,300.000
|
$0.200
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
65,108.000
|
$0.170
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.110
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,666.000
|
$1.000
|
$0.850
|
$2.250
|
$1.000
|
$3.000
|
$2.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
212.000
|
$5.500
|
$5.600
|
$5.500
|
$5.500
|
$5.500
|
$5.910
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
55,320.000
|
$0.550
|
$0.750
|
$0.750
|
$0.750
|
$0.750
|
$0.810
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
4,150.000
|
$0.550
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.080
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
32,554.000
|
$0.550
|
$0.850
|
$0.850
|
$0.850
|
$0.850
|
$0.910
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
644.000
|
$3.000
|
$3.550
|
$3.500
|
$3.500
|
$3.500
|
$3.760
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
73,482.000
|
$1.500
|
$0.540
|
$1.300
|
$1.550
|
$2.000
|
$1.920
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$20,829.000
|
$13,000.000
|
$10,000.000
|
$16,500.000
|
$31,427.420
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$250.000
|
$373.150
|
$150.000
|
$200.000
|
$250.000
|
$223.480
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
112.000
|
$60.000
|
$108.550
|
$100.000
|
$50.000
|
$180.000
|
$87.300
|
|
Totals: |
$3,936,473.740
|
$3,637,497.638
|
$3,940,003.117
|
$4,292,011.300
|
$4,329,626.885
|
$4,889,137.050
|