Show Job Controls
Bid Cobra

FALLS FM 413 (0808-01-061)

Items: 49

County: FALLS
Length: N/A
Highway: FM 413
District: WACO
Control Number: 0808-01-061
DBE Goal: N/A
Project: BR 2020(742)
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $2,033,804.00
Date: 04/08/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE RE-DECKING. CONCRETE OVERLAY BRIDGE REHAB.
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,033,804.00
$1,989,999.96
Over/Under Est: -2.15% -$43,804.04
Over/Under Est: -0.15% -$2,976.29
Amt Left: 2.05% $40,827.75
Over/Under Est: 1.62% $32,914.50
Amt Left: 3.86% $76,718.54
Delta: -1.77% -$35,890.79
$2,459,248.29
Over/Under Est: 20.92% $425,444.29
Amt Left: 23.58% $469,248.33
Delta: -18.99% -$392,529.79

Bid Items & Bid Tabulations

49 Total 0 of 49
FALLS  |  FM 413  |  WACO  |  0808-01-061  |  04/08/2020  |  $2,033,804.00  |  BR 2020(742)  |  BRIDGE RE-DECKING. CONC OVERLAY BRI...  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
FUQUA CONSTRUCTION CO., INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
DCI CONTRACTING, INC.
PREPARING ROW
STA 9.000 $1,000.000 $20,000.000 $1,638.000 $8,000.000 $7,800.060
REMOVING CONC (RIPRAP)
SY 282.000 $10.000 $22.480 $10.920 $100.000 $17.090
REMOVING CONC (APPR SLAB)
SY 120.000 $30.000 $26.180 $20.020 $170.000 $80.190
EXCAVATION (ROADWAY)
CY 34.000 $30.000 $23.490 $13.650 $60.000 $57.360
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 680.000 $2.000 $1.500 $1.950 $3.000 $2.600
BROADCAST SEED (TEMP) (WARM)
SY 340.000 $2.000 $2.650 $1.950 $3.000 $3.250
BROADCAST SEED (TEMP) (COOL)
SY 340.000 $2.000 $2.650 $1.950 $3.000 $3.250
VEGETATIVE WATERING
MG 11.000 $60.000 $100.000 $15.600 $1.000 $260.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 240.000 $4.000 $3.750 $5.200 $4.000 $3.900
ASPH (CRS-2)
GAL 634.000 $6.000 $5.650 $11.700 $10.000 $8.560
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 12.000 $400.000 $914.490 $1,055.720 $850.000 $1,161.350
D-GR HMA(SQ) TY-C SAC-B PG64-22
TON 156.000 $170.000 $158.060 $185.900 $150.000 $200.010
D-GR HMA(SQ) TY-C PG64-22 (LEVEL-UP)
TON 62.000 $150.000 $214.510 $250.250 $200.000 $293.560
PLANE ASPH CONC PAV(1" TO 2")
SY 1,408.000 $10.000 $5.290 $7.020 $20.000 $10.170
CEM STABIL BKFL
CY 22.000 $140.000 $204.890 $113.100 $220.000 $354.570
CL B CONC (FLUME)
CY 10.000 $500.000 $978.250 $147.740 $500.000 $915.200
APPROACH SLAB
CY 43.400 $400.000 $557.270 $274.200 $600.000 $808.770
REINF CONC SLAB (LIGHTWEIGHT)
SF 19,452.000 $50.000 $33.390 $44.090 $40.000 $37.180
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 111.000 $300.000 $225.100 $101.920 $250.000 $188.500
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 23.000 $350.000 $289.410 $199.251 $350.000 $195.000
RIPRAP (CONC)(5 IN)
CY 50.000 $500.000 $455.640 $271.000 $600.000 $587.600
RIPRAP (STONE PROTECTION)(18 IN)
CY 62.000 $125.000 $2,966.510 $234.000 $220.000 $440.370
RIPRAP (MOW STRIP)(4 IN)
CY 55.300 $475.000 $392.690 $249.940 $500.000 $548.600
CLEANING AND SEALING EXIST JOINTS(CL5)
LF 64.000 $30.000 $21.000 $98.800 $80.000 $52.820
STR STEEL (SHEAR CONNECTOR)
LB 1,986.000 $8.000 $9.840 $12.980 $20.000 $8.450
RAIL (TY T1W)
LF 1,341.500 $125.000 $133.630 $179.720 $200.000 $172.200
RETROFIT RAIL (TY T1W)
LF 40.000 $185.000 $351.970 $263.830 $250.000 $354.880
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 85.000 $100.000 $74.080 $98.450 $85.000 $111.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $300,000.000 $306,542.220 $366,775.370 $215,000.000 $603,850.000
ADJUST STL SHOES
EA 8.000 $3,000.000 $1,348.320 $455.000 $8,000.000 $19,500.000
MOBILIZATION
LS 1.000 $190,000.000 $195,994.110 $225,726.410 $200,000.000 $258,778.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,500.000 $1,142.750 $3,256.420 $6,000.000 $2,762.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,094.000 $3.000 $2.930 $4.880 $1.000 $5.240
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,094.000 $1.000 $1.000 $1.300 $1.000 $0.130
MTL W-BEAM GD FEN (STEEL POST)
LF 375.000 $25.000 $22.500 $29.250 $30.000 $32.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,900.000 $1,670.000 $2,171.000 $1,200.000 $1,365.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.000 $1.750 $2.275 $3.000 $6.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $150.000 $195.000 $500.000 $162.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $2,470.000 $3,211.000 $2,800.000 $3,510.000
ALUMINUM SIGNS (TY A)
SF 6.000 $35.000 $50.000 $130.000 $800.000 $130.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 1.000 $1,500.000 $50.000 $390.000 $800.000 $1,170.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $25.000 $20.000 $26.000 $40.000 $26.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $35.000 $22.000 $28.600 $40.000 $45.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,520.000 $2.000 $1.350 $1.950 $3.000 $2.280
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 320.000 $2.000 $1.350 $2.145 $5.000 $3.900
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,260.000 $2.000 $1.350 $2.015 $3.000 $2.600
REFL PAV MRKR TY II-A-A
EA 32.000 $50.000 $10.000 $5.200 $15.000 $24.700
PAV SURF PREP FOR MRK (4")
LF 2,183.000 $2.000 $1.000 $1.300 $1.500 $1.120
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $2,138.000 $15,946.960 $12,000.000 $10,400.000
Totals: $2,033,804.000 $1,989,999.980 $2,030,827.715 $2,066,718.500 $2,459,248.298