Job Info for 2121-02-178

County: EL PASO Highway: IH 10 Date: 01/04/2024 (10 months ago) Engineer's Estimate: $6,180,451 Control Number: 2121-02-178
Project: F 2024(655) District: EL PASO Time: 77 WORKING DAYS Type: PREVENTIVE MAINTENANCE
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $6,180,450.79
DAN WILLIAMS COMPANY   $5,680,916.35 1
-8.08% | -$499,534.44
INTERNATIONAL EAGLE ENTERPRISES, INC.   $7,174,440.20 2
16.08% | $993,989.41
26.29% | $1,493,523.85
LESNA CONSTRUCTION, INC.   $8,256,955.25 3
33.6% | $2,076,504.46
45.35% | $2,576,038.90
15.09% | $1,082,515.05
Subcontractor Percentage Amount
TRI STATE ELECTRIC, LTD. 6.65% $377,780.94
PMI PAVEMENT MARKING, LLC 1.97% $111,914.05
SOUTHEAST GRINDING AND GROOVING LLC 0.10% $5,680.92
MAJOR MOTION LOGISTICS, LLC 0.02% $1,136.18
Total: 8.74% $496,512.09

Bid Items

Items: 48, 0 filtered
EL PASO IH 10  |  EL PASO  |  2121-02-178  |  01/04/2024  |  $6,180,451  |  F 2024(655)  |  PREVENT MAINT  |  77 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DAN WILLIAMS COMPANY INTERNATIONAL EAGLE ENTERPRISES, INC. LESNA CONSTRUCTION, INC.
134 6004 BACKFILL (TY A OR B) STA 120.000 $210.950 $250.000 $250.000 $350.000
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 876.000 $4.190 $8.500 $8.000 $8.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 6,913.000 $48.410 $50.000 $51.000 $65.000
354 6002 PLAN & TEXT ASPH CONC PAV(0" TO 2") SY 50,800.000 $2.370 $1.050 $2.500 $2.000
354 6020 PLANE ASPH CONC PAV(0" TO 1") SY 8,378.000 $3.400 $3.150 $2.000 $3.500
354 6188 PLANE ASPH CONC PAV(MICRO-MLLING)(1") SY 141,236.000 $0.900 $1.000 $2.750 $2.000
356 6021 PAV JT UNDERSEAL (24") LF 2,700.000 $50.000 $52.000 $8.000 $55.000
429 6006 CONC STR REPR(RAPID DECK REP(FULL DPT)) SF 576.000 $200.000 $205.000 $250.000 $258.000
432 6001 RIPRAP (CONC)(4 IN) CY 6.000 $800.000 $1,200.000 $1,000.000 $900.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 2,700.000 $30.000 $27.000 $20.000 $32.000
500 6001 MOBILIZATION LS 1.000 $391,541.930 $75,000.000 $550,000.000 $800,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $25,000.000 $22,000.000 $25,000.000 $30,000.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 16.000 $1,199.310 $1,455.000 $1,000.000 $1,600.000
644 6076 REMOVE SM RD SN SUP&AM EA 6.000 $147.120 $225.000 $350.000 $250.000
644 6078 REMOVE SM RD SN SUP&AM (SIGN ONLY) EA 6.000 $75.000 $125.000 $720.000 $150.000
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 10,697.000 $0.470 $0.450 $0.750 $0.500
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 22,979.000 $0.550 $0.400 $0.700 $0.500
662 6014 WK ZN PAV MRK NON-REMOV (W)12"(SLD) LF 816.000 $2.070 $2.250 $5.000 $2.500
662 6019 WK ZN PAV MRK NON-REMOV (W)(ENTR GORE) EA 3.000 $509.050 $865.000 $1,100.000 $1,000.000
662 6020 WK ZN PAV MRK NON-REMOV (W)(EXIT GORE) EA 3.000 $464.320 $615.000 $1,100.000 $700.000
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 22,979.000 $0.550 $0.400 $0.950 $0.500
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 9,857.000 $1.320 $2.250 $3.000 $2.000
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 50.000 $1.900 $3.350 $10.000 $4.000
666 6039 REFL PAV MRK TY I (W)12"(LNDP)(100MIL) LF 360.000 $2.960 $3.650 $7.000 $4.000
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 816.000 $3.890 $4.350 $10.000 $5.000
666 6074 REFL PAV MRK TY I (W)(NUMBER)(090MIL) EA 1.000 $210.000 $205.000 $500.000 $225.000
666 6081 REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) EA 3.000 $2,193.750 $1,525.000 $2,000.000 $1,600.000
666 6084 REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) EA 3.000 $1,500.000 $1,100.000 $1,600.000 $1,200.000
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 10,697.000 $1.000 $1.150 $1.800 $1.250
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 22,979.000 $0.580 $1.050 $1.750 $1.250
666 6345 REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF 22,979.000 $0.590 $1.050 $1.750 $1.250
672 6008 REFL PAV MRKR TY I-R EA 14.000 $20.000 $6.500 $12.000 $7.000
672 6014 TRAFFIC BUTTON TY II-C-R EA 687.000 $7.700 $6.500 $12.000 $7.000
3076 6034 D-GR HMA TY-C PG76-22 (LEVEL-UP) TON 4.000 $109.320 $1,650.000 $2,000.000 $1,000.000
3080 6001 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 TON 19,626.000 $145.830 $139.500 $160.000 $185.000
3080 6029 TACK COAT GAL 20,739.000 $4.000 $6.500 $8.000 $8.000
3082 6004 TBWC (MEMBRANE) GAL 32,260.000 $4.880 $5.000 $7.000 $8.000
3082 6005 TBWC PG76-22 SAC-A TY C TON 7,332.000 $160.000 $134.750 $155.000 $185.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 77.000 $100.000 $150.000 $120.000 $475.000
6010 6011 CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY) EA 4.000 $2,550.000 $7,600.000 $8,360.000 $7,750.000
6010 6013 REMOVE CCTV FIELD EQUIPMENT EA 4.000 $1,250.000 $1,250.000 $5,600.000 $1,500.000
6028 6002 INSTALL DMS (FOUNDATION MTD CABINET) EA 3.000 $30,000.000 $46,000.000 $50,600.000 $50,000.000
6137 6005 INSTALLATION OF FES (FIELD CABINET) EA 7.000 $2,000.000 $2,350.000 $2,600.000 $2,500.000
6185 6002 TMA (STATIONARY) DAY 77.000 $212.010 $200.000 $500.000 $250.000
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $341.050 $510.000 $500.000 $500.000
6377 6001 SYSTEM INTEGRATION LS 1.000 $35,000.000 $36,500.000 $40,000.000 $40,000.000
6426 6001 REMOVE DYNAMIC MESSAGE SIGN SYSTEM EA 3.000 $15,000.000 $16,000.000 $17,000.000 $17,500.000
6489 6002 BACKLIT W/ PERIMETER LED RDSD SGN EA 10.000 $8,000.000 $8,000.000 $8,700.000 $8,500.000
Totals: $6,180,450.79 $5,680,916.35 $7,174,440.20 $8,256,955.25