Show Job Controls
Bid Cobra

ECTOR IH 20 (0004-07-138)

Items: 77

County: ECTOR
Length: N/A
Highway: IH 20
District: ODESSA
Control Number: 0004-07-138
DBE Goal: 0.0%
Project: C 4-7-138
Guaranty: N/A
Time: 238 WORKING DAYS
Engineer's Estimate: $18,273,514.07
Date: 02/01/2024 (2 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$18,273,514.07
Over/Under Est: 35.86% $6,553,539.31
$28,490,917.79
Over/Under Est: 55.91% $10,217,403.72
Amt Left: 14.76% $3,663,864.41
$29,426,896.75
Over/Under Est: 61.04% $11,153,382.68
Amt Left: 18.53% $4,599,843.37
Delta: -3.29% -$935,978.96
Subcontractor Percentage Amount
O. TREVINO CONSTRUCTION, LLC 12.91% $3,674,337.20
HJC FARMS, INC. 3.99% $1,135,600.73
TEX OP CONSTRUCTION, LP 2.35% $668,837.52
DOUBLE A CONTRACTING, L.P. 0.96% $273,227.24
DESERT PAVING, INC. 0.62% $176,459.26
CONTRACTORS SERVICE, LTD. 0.60% $170,767.03
WILLIS ELECTRIC CO., LP 0.15% $42,691.76
FC TRAFFIC CONTROL, INC. 0.01% $2,846.12
R.E.B.D. TRUCKING LLC 0.00% $0.00
Total: 21.59% $6,144,766.86

Bid Items & Bid Tabulations

77 Total 0 of 77
ECTOR  |  IH 20  |  ODESSA  |  0004-07-138  |  02/01/2024  |  $18,273,514.07  |  C 4-7-138  |  ROADWAY REHAB  |  238 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
RK HALL, LLC
FNF CONSTRUCTION, INC.
REMOVING STAB BASE AND ASPH PAV (3")
SY 4,018.000 $5.500 $28.300 $23.060 $18.000
REMOVING STAB BASE AND ASPH PAV (13")
SY 4,184.000 $17.000 $24.440 $17.130 $45.000
REMOVING STB BASE AND ASPH PAV(10-14")
SY 621.000 $15.000 $63.750 $51.640 $60.000
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 386.000 $1.450 $75.100 $77.080 $56.000
EXCAVATION (ROADWAY)
CY 1,000.000 $16.500 $20.000 $30.500 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,000.000 $50.000 $20.000 $49.490 $22.000
BACKFILL (TY B)
STA 483.000 $282.500 $1,036.000 $373.440 $180.000
BLADING
HR 20.000 $147.000 $450.000 $197.620 $180.000
PROOF ROLLING
HR 20.000 $101.000 $175.000 $174.780 $130.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 85,448.000 $1.850 $1.500 $2.420 $3.000
PRIME COAT (AE-P)
GAL 16,362.000 $4.500 $7.140 $12.060 $9.000
FOG SEAL (CSS-1H)
GAL 2,330.000 $7.250 $13.620 $6.580 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
SY 300.000 $90.000 $300.000 $194.160 $300.000
PLANE ASPH CONC PAV(0" TO 1")
SY 390.000 $20.000 $72.360 $59.420 $38.000
PLANE ASPH CONC PAV(0" TO 2")
SY 192.000 $3.000 $130.000 $102.940 $55.000
PLANE ASPH CONC PAV (2 1/2")
SY 81,810.000 $1.850 $10.190 $10.530 $7.000
PLANE ASPH CONC PAV (7.5")
SY 81,810.000 $6.000 $15.020 $11.170 $22.000
PLANE ASPH CONC PAV (3" TO 13")
SY 182.000 $15.000 $130.000 $119.550 $100.000
CONCPVMT(CONT REIN)(FST TRK)(CL P)(13")
SY 3,639.000 $155.000 $266.800 $268.200 $360.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 414.000 $250.000 $241.500 $242.400 $410.000
RIPRAP (CONC)(CL B)
CY 2,019.000 $400.000 $1,500.000 $1,312.800 $1,005.000
RIPRAP (MOW STRIP)(4 IN)
CY 411.000 $770.000 $839.500 $876.000 $1,220.000
HEADER TYPE EXPANSION JOINT
LF 1,040.000 $367.000 $184.000 $192.000 $400.000
MOBILIZATION
LS 1.000 $1,646,656.000 $1,400,000.000 $1,941,353.230 $3,150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $7,500.000 $50,000.000 $29,889.690 $140,400.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,840.000 $7.500 $17.000 $9.900 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,840.000 $1.550 $5.500 $4.320 $1.500
RUMBLE STRIPS (SHOULDER)
LF 61,157.000 $0.150 $0.210 $0.220 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 12,386.000 $35.000 $39.100 $34.000 $47.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $3,000.000 $3,248.750 $3,390.000 $4,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,930.000 $2,328.750 $2,430.000 $3,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 4.000 $1,350.000 $1,351.250 $1,410.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 11,260.000 $3.850 $4.600 $4.800 $6.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $1,800.000 $460.000 $480.000 $550.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,850.000 $4,600.000 $4,800.000 $5,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $390.000 $460.000 $480.000 $550.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 142.000 $45.000 $35.650 $37.200 $45.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 47.000 $950.000 $1,092.500 $1,140.000 $1,435.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 17.000 $1,000.000 $1,224.750 $1,278.000 $1,610.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $1,000.000 $1,265.000 $1,320.000 $1,660.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 52.000 $650.000 $1,437.500 $1,500.000 $1,890.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $1,000.000 $1,512.250 $1,578.000 $1,990.000
REMOVE SM RD SN SUP&AM
EA 135.000 $140.000 $180.000 $132.000 $165.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 110.000 $35.000 $48.300 $50.400 $60.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 80.000 $35.000 $48.300 $50.400 $60.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 18.000 $35.000 $55.200 $57.600 $70.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 75.000 $35.000 $55.200 $57.600 $70.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 14,000.000 $0.350 $0.380 $0.400 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 75,000.000 $0.350 $0.290 $0.300 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 7,018.000 $1.450 $0.380 $0.400 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 137,000.000 $0.450 $0.290 $0.300 $0.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,099.000 $1.120 $1.380 $1.440 $1.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 688.000 $5.000 $3.740 $3.900 $4.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 14,000.000 $1.050 $0.860 $0.900 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 75,000.000 $0.920 $0.790 $0.830 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 7,018.000 $0.780 $0.860 $0.900 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 137,000.000 $0.800 $0.790 $0.830 $1.000
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 920.000 $3.120 $4.030 $4.200 $5.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 150.000 $18.500 $20.700 $21.600 $25.000
PREFAB PAV MRK TY C (W) (EXIT GORE)
EA 4.000 $850.000 $862.500 $900.000 $1,100.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $750.000 $690.000 $720.000 $900.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 24.000 $35.000 $34.500 $36.000 $45.000
REFL PAV MRKR TY I-C
EA 339.000 $5.050 $5.750 $6.000 $7.000
REFL PAV MRKR TY II-A-A
EA 387.000 $4.880 $5.750 $6.000 $7.000
REFL PAV MRKR TY II-C-R
EA 763.000 $4.650 $4.600 $4.800 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,000.000 $1.750 $1.130 $1.180 $1.500
BRUSH REMOVAL
MI 0.500 $50,000.000 $280,000.000 $167,789.140 $50,000.000
SP MIXES SP-B SAC-B PG70-22
TON 45,217.000 $145.000 $155.000 $192.170 $170.000
TACK COAT
GAL 16,362.000 $4.400 $5.270 $14.580 $10.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 30,689.000 $165.000 $197.000 $273.540 $226.000
BONDING COURSE
GAL 27,362.000 $4.820 $4.210 $8.450 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $22,500.000 $31,300.770 $16,000.000
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 2,100.000 $36.000 $37.950 $39.600 $50.000
MODULAR GLARE SCREENS (REMOVE)
LF 2,100.000 $10.000 $8.050 $8.400 $10.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $13,000.000 $9,375.000 $13,108.000 $10,000.000
TMA (STATIONARY)
DAY 89.000 $175.000 $156.250 $445.440 $370.000
TMA (MOBILE OPERATION)
DAY 42.000 $280.000 $1,062.500 $964.630 $1,000.000
Totals: $18,273,514.070 $24,827,053.380 $28,490,917.790 $29,426,896.750