DALLAS IH 20 (2374-04-086)

Items: 76

County: DALLAS
Length: N/A
Highway: IH 20
District: DALLAS
Control Number: 2374-04-086
DBE Goal: N/A
Project: C 2374-4-86
Guaranty: N/A
Time: 306 WORKING DAYS
Engineer's Estimate: $15,579,409.17
Date: 02/02/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$15,579,409.17
$20,092,842.80
Over/Under Est: 28.97% $4,513,433.63
Over/Under Est: 37% $5,763,728.46
Amt Left: 6.22% $1,250,294.83
Over/Under Est: 47.05% $7,330,451.89
Amt Left: 14.02% $2,817,018.26
Delta: -7.34% -$1,566,723.43
Over/Under Est: 48.16% $7,503,014.77
Amt Left: 14.88% $2,989,581.14
Delta: -0.75% -$172,562.88

Bid Items & Bid Tabulations

76 Total 0 of 76
DALLAS  |  IH 20  |  DALLAS  |  2374-04-086  |  02/02/2024  |  $15,579,409.17  |  C 2374-4-86  |  REHAB EXIST ROADWAY  |  306 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
FOUTSCO PAVING COMPANY, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (RIPRAP)
SY 31.000 $35.000 $100.000 $150.000 $208.020 $26.000
REMOVING CONCRETE(MOW STRIP)
LF 1,738.000 $10.000 $20.000 $25.000 $11.620 $8.000
COMPOST MANUF TOPSOIL (4")
SY 5,156.000 $1.120 $8.000 $3.000 $2.000 $1.500
BLOCK SODDING
SY 5,156.000 $3.500 $8.000 $5.000 $7.750 $5.000
VEGETATIVE WATERING
MG 767.000 $5.000 $50.000 $1.000 $1.250 $30.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,503.000 $75.000 $100.000 $110.000 $150.000 $180.000
PLANE ASPH CONC PAV(0" TO 1")
SY 43,470.000 $1.750 $2.500 $1.000 $4.000 $2.650
PLANE ASPH CONC PAV (0" TO 3/4")
SY 1,079,732.000 $1.200 $2.000 $0.750 $2.300 $1.720
FULL - DEPTH REPAIR CRCP (10")
SY 200.000 $350.000 $185.000 $500.000 $551.750 $600.000
FLOWABLE BACKFILL
CY 16.000 $550.000 $350.000 $475.000 $1,088.280 $1,050.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 63.000 $250.000 $200.000 $160.000 $156.000 $156.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 384.000 $75.000 $200.000 $125.000 $120.000 $120.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 73.000 $125.000 $250.000 $215.000 $210.000 $210.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,039.000 $180.000 $200.000 $190.000 $185.000 $185.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 5.000 $1,000.000 $850.000 $1,000.000 $1,046.600 $900.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 11.000 $800.000 $185.000 $1,000.000 $557.540 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 401.000 $450.000 $500.000 $600.000 $817.020 $650.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 10,082.000 $20.000 $30.000 $40.000 $9.000 $47.000
CLEANING AND SEALING JOINTS (FOAM)
LF 5,046.000 $40.000 $80.000 $75.000 $76.000 $70.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $276,000.000 $120,000.000 $90,000.000 $59,340.000 $99,950.000
RETROFIT RAIL (TY SSTR)
LF 12,868.000 $125.000 $155.000 $155.000 $203.900 $200.000
CLEAN EXIST CULVERTS
EA 1.000 $2,000.000 $100,000.000 $75,000.000 $95,000.000 $8,500.000
REMOVE STR (CONC)
EA 1.000 $4,000.000 $8,500.000 $7,000.000 $6,500.000 $7,500.000
ADJUST STL SHOES
EA 3.000 $3,000.000 $10,000.000 $10,000.000 $8,500.000 $10,000.000
MOBILIZATION
LS 1.000 $1,352,309.900 $1,900,000.000 $2,000,000.000 $2,290,986.100 $875,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $44,000.000 $10,000.000 $82,500.000 $55,000.000 $40,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,000.000 $2.500 $4.000 $1.000 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,000.000 $0.750 $2.000 $1.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,000.000 $6.500 $18.000 $1.000 $6.000 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,000.000 $1.500 $9.000 $1.000 $1.000 $1.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 3,840.000 $17.000 $85.000 $29.000 $50.000 $36.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 8,010.000 $10.000 $20.000 $29.000 $35.000 $36.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 3,840.000 $8.000 $20.000 $15.000 $5.610 $18.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 229,861.000 $0.200 $0.300 $0.180 $0.190 $0.170
MTL W-BEAM GD FEN (TIM POST)
LF 5,325.000 $21.000 $26.500 $20.000 $22.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 21.000 $2,500.000 $1,850.000 $1,800.000 $2,833.910 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 22.000 $2,000.000 $1,850.000 $1,100.000 $1,100.000 $1,300.000
REMOVE METAL BEAM GUARD FENCE
LF 4,962.500 $2.500 $5.000 $2.500 $2.500 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 22.000 $212.000 $500.000 $100.000 $100.000 $125.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 18.000 $245.000 $500.000 $250.000 $250.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 28.000 $3,000.000 $3,250.000 $3,000.000 $2,875.000 $3,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 28.000 $270.000 $1,500.000 $250.000 $250.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 26.000 $285.000 $5,000.000 $3,500.000 $1,101.360 $4,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $900.000 $2,500.000 $1,500.000 $1,101.360 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $12,500.000 $30,000.000 $9,500.000 $14,000.000 $11,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 70.000 $17.000 $100.000 $20.000 $10.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 70.000 $17.000 $100.000 $20.000 $10.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 183.000 $26.000 $100.000 $25.000 $25.500 $25.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 105,470.000 $0.400 $0.850 $0.300 $0.220 $0.320
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 136,433.000 $0.400 $0.850 $0.300 $0.220 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 135,983.000 $0.400 $0.850 $0.300 $0.220 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 30,960.000 $1.200 $2.000 $1.000 $0.500 $0.850
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 1,502.000 $3.000 $5.000 $2.400 $2.730 $2.400
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,418.000 $3.100 $5.000 $2.400 $2.730 $2.400
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 11.000 $150.000 $250.000 $140.000 $72.000 $140.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 11.000 $165.000 $250.000 $150.000 $85.000 $150.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 24.000 $800.000 $1,000.000 $1,000.000 $965.000 $980.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 20.000 $800.000 $1,650.000 $1,600.000 $1,580.000 $1,600.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 105,760.000 $0.700 $0.900 $0.600 $0.770 $0.580
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 136,433.000 $0.500 $0.900 $0.600 $0.770 $0.580
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 135,983.000 $0.500 $0.900 $0.600 $0.770 $0.580
REFL PAV MRKR TY II-C-R
EA 5,084.000 $4.000 $4.000 $4.000 $4.450 $4.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 1,750.000 $5.000 $25.000 $12.000 $7.400 $9.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 33.000 $825.000 $2,000.000 $1,500.000 $1,400.000 $1,700.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 791.000 $120.000 $60.000 $45.000 $40.500 $45.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 1,910.000 $60.000 $60.000 $35.000 $34.500 $40.000
BRIDGE JOINT REPAIR (ARMOR)
LF 430.000 $170.000 $850.000 $600.000 $710.000 $750.000
BRIDGE JOINT REPAIR (PARTIAL DEPTH)
LF 3.000 $75.000 $2,000.000 $750.000 $750.000 $800.000
CONCRETE BEAM REPAIR (CFRP)
EA 1.000 $5,000.000 $25,000.000 $25,000.000 $21,500.000 $22,000.000
TBWC (MEMBRANE)
GAL 245,678.000 $3.500 $4.000 $3.000 $3.850 $4.000
TBWC PG76-22 SAC-A TY C
TON 46,930.000 $140.000 $160.000 $225.000 $200.000 $225.000
REPLACE ELASTOMERIC BEARING PADS
EA 12.000 $6,500.000 $17,500.000 $12,000.000 $15,000.000 $18,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $16,500.000 $40,000.000 $21,450.000 $20,000.000
TMA (STATIONARY)
DAY 612.000 $225.000 $250.000 $1.000 $187.500 $1,800.000
TMA (MOBILE OPERATION)
DAY 306.000 $200.000 $385.000 $1.000 $556.370 $300.000
REML & DISPL DRIFTWOOD & DEBRIS
LS 1.000 $40,000.000 $80,000.000 $10,000.000 $15,000.000 $20,000.000
Totals: $15,579,409.170 $20,092,842.800 $21,343,137.630 $22,909,861.060 $23,082,423.940