PREPARING ROW
|
AC
|
0.630
|
$100,000.000
|
$288,000.000
|
$1,000,000.000
|
$1,250,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
14.000
|
$10.000
|
$455.000
|
$68.000
|
$100.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,850.000
|
$25.000
|
$43.000
|
$16.000
|
$45.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
311.000
|
$50.000
|
$110.000
|
$130.000
|
$100.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
718.000
|
$5.000
|
$2.750
|
$2.500
|
$20.000
|
|
|
BLOCK SODDING
|
SY
|
718.000
|
$8.000
|
$5.500
|
$12.500
|
$20.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
718.000
|
$0.500
|
$1.650
|
$1.500
|
$20.000
|
|
|
VEGETATIVE WATERING
|
MG
|
214.000
|
$15.000
|
$275.000
|
$67.000
|
$100.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
4,005.000
|
$85.000
|
$114.900
|
$86.000
|
$80.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
500.000
|
$140.000
|
$187.000
|
$152.000
|
$125.000
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
120.000
|
$350.000
|
$363.000
|
$230.000
|
$400.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
SY
|
200.000
|
$420.000
|
$462.000
|
$420.000
|
$650.000
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
SY
|
250.000
|
$500.000
|
$568.700
|
$517.000
|
$750.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
19.700
|
$375.000
|
$1,035.000
|
$750.000
|
$450.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
3.400
|
$3,000.000
|
$16,650.000
|
$7,000.000
|
$5,000.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
256.000
|
$100.000
|
$170.500
|
$125.000
|
$300.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
653.000
|
$200.000
|
$176.000
|
$100.000
|
$300.000
|
|
|
PNEUMATICALLY PLACED CONC (REPAIR)
|
CF
|
146.000
|
$300.000
|
$654.500
|
$225.000
|
$450.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$650.000
|
$6,200.000
|
$3,000.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
110.000
|
$225.000
|
$225.500
|
$206.000
|
$185.000
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
12,864.000
|
$200.000
|
$225.500
|
$208.000
|
$285.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
3.000
|
$3,000.000
|
$7,000.000
|
$1,850.000
|
$850.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
206.000
|
$800.000
|
$840.000
|
$750.000
|
$550.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
32.000
|
$50.000
|
$36.300
|
$29.000
|
$100.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
5,160.500
|
$35.000
|
$36.300
|
$29.000
|
$85.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
2,230.000
|
$15.000
|
$37.000
|
$20.000
|
$25.000
|
|
|
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
|
LS
|
1.000
|
$500,000.000
|
$170,016.000
|
$500,000.000
|
$325,000.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$200,000.000
|
$48,000.000
|
$500,000.000
|
$150,000.000
|
|
|
REMOV STR (DRAINAGE FLUME)
|
EA
|
1.000
|
$5,000.000
|
$2,500.000
|
$810.000
|
$5,000.000
|
|
|
ADJUST STL SHOES
|
EA
|
8.000
|
$5,000.000
|
$14,250.000
|
$8,000.000
|
$8,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$689,177.000
|
$704,000.000
|
$810,000.000
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$75,000.000
|
$16,400.000
|
$51,600.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
700.000
|
$45.000
|
$68.200
|
$62.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
700.000
|
$15.000
|
$9.900
|
$9.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
154.000
|
$60.000
|
$31.350
|
$28.500
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
154.000
|
$20.000
|
$11.000
|
$10.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$3.500
|
$3.300
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$0.940
|
$0.850
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.250
|
$4.950
|
$4.500
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$1.250
|
$1.100
|
$0.900
|
$9.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
6,600.000
|
$3.000
|
$1.050
|
$0.700
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,750.000
|
$30.000
|
$28.600
|
$18.480
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$3,500.000
|
$2,007.500
|
$2,250.000
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$3,000.000
|
$1,622.500
|
$1,044.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,750.000
|
$5.000
|
$5.500
|
$2.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$1,000.000
|
$220.000
|
$400.000
|
$1,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$4,200.000
|
$3,135.000
|
$2,716.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$2,500.000
|
$275.000
|
$400.000
|
$1,850.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
16.000
|
$1,000.000
|
$1,155.000
|
$915.000
|
$1,500.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
15.000
|
$1,000.000
|
$1,705.000
|
$2,250.000
|
$2,500.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
210,000.000
|
$0.100
|
$0.410
|
$0.240
|
$1.000
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
16.000
|
$200.000
|
$330.000
|
$375.000
|
$500.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
15.000
|
$200.000
|
$440.000
|
$500.000
|
$650.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
42,000.000
|
$1.000
|
$0.700
|
$0.690
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
84,000.000
|
$1.000
|
$0.690
|
$0.690
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
84,000.000
|
$1.000
|
$0.690
|
$0.690
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,100.000
|
$5.000
|
$6.330
|
$4.110
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
210,000.000
|
$0.500
|
$0.830
|
$0.290
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
16.000
|
$350.000
|
$440.000
|
$250.000
|
$650.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
15.000
|
$350.000
|
$605.000
|
$425.000
|
$1,500.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
210,000.000
|
$0.100
|
$0.060
|
$0.180
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
16.000
|
$100.000
|
$110.000
|
$150.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
15.000
|
$100.000
|
$110.000
|
$235.000
|
$10.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
21.000
|
$25.000
|
$200.000
|
$100.000
|
$500.000
|
|
|
BRUSH REMOVAL
|
MI
|
1.000
|
$2,000.000
|
$6,500.000
|
$4,500.000
|
$30,000.000
|
|
|
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
|
EA
|
1.000
|
$50.000
|
$1,500.000
|
$2,900.000
|
$5,000.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
48.000
|
$500.000
|
$1,000.000
|
$850.000
|
$500.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
674.000
|
$50.000
|
$60.500
|
$50.000
|
$100.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
92.000
|
$75.000
|
$44.000
|
$50.000
|
$100.000
|
|
|
REP STL BRDG MEMB (ANCHOR BOLT NUT)
|
EA
|
5.000
|
$500.000
|
$100.000
|
$300.000
|
$5,000.000
|
|
|
REP STL BRIDGE MEMBER (WELD REPAIR)
|
LF
|
30.000
|
$600.000
|
$305.000
|
$230.000
|
$500.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
12.000
|
$600.000
|
$1,375.000
|
$1,125.000
|
$1,500.000
|
|
|
REPLACE NUTS, WASHERS & OTHER HARDWARE
|
EA
|
3.000
|
$50.000
|
$500.000
|
$325.000
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$25,000.000
|
$25,700.000
|
$75,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
378.000
|
$400.000
|
$150.000
|
$210.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
189.000
|
$400.000
|
$50.000
|
$205.000
|
$550.000
|
|
Totals: |
$7,580,945.000
|
$7,294,650.850
|
$8,156,592.500
|
$9,648,577.500
|