Show Job Controls
Bid Cobra

CHAMBERS IH0010 (6452-75-001)

Items: 80

County: CHAMBERS
Length: N/A
Highway: IH0010
District: BEAUMONT
Control Number: 6452-75-001
DBE Goal: 0.0%
Project: RMC - 645275001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $692,890.50
Date: 02/01/2024 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
NYEMB NYEMB
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$692,890.50
$554,027.00
Over/Under Est: -20.04% -$138,863.50
Over/Under Est: -12.32% -$85,392.10
Amt Left: 9.65% $53,471.40
Over/Under Est: 0.75% $5,203.26
Amt Left: 26% $144,066.76
Delta: -14.91% -$90,595.36

Bid Items & Bid Tabulations

80 Total 0 of 80
CHAMBERS  |  IH0010  |  BEAUMONT  |  6452-75-001  |  02/01/2024  |  $692,890.50  |  RMC - 645275001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HAZMAT INTERNATIONAL, INC.
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
REMOVING CONC (RIPRAP)
SY 15.000 $54.000 $75.000 $100.000 $10.000
CONC STR REPAIR (STANDARD)
SF 100.000 $442.000 $20.000 $300.000 $70.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $693.000 $700.000 $800.000 $235.000
RAIL (TY T402)(HPC)
LF 150.000 $137.500 $160.000 $200.000 $144.000
MOBILIZATION (CALLOUT)
EA 30.000 $9,800.000 $100.000 $1.000 $392.000
MOBILIZATION (EMERGENCY)
EA 5.000 $3,100.000 $1,000.000 $1,000.000 $972.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 120.000 $115.000 $80.000 $50.000 $66.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 120.000 $20.000 $5.000 $50.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $29.000 $20.000 $40.000 $15.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 25.000 $48.000 $20.000 $200.000 $62.000
TERMINAL ANCHOR SECTION
EA 5.000 $698.000 $1.000 $1.000 $1.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,500.000 $500.000 $5,000.000 $1,204.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,200.000 $500.000 $2,500.000 $775.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $982.000 $1,000.000 $1,500.000 $901.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 25.000 $5.000 $50.000 $20.000 $1.400
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 50.000 $10.000 $10.000 $20.000 $4.700
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 2.000 $100.000 $165.000 $1.000 $26.000
TRANSITION ADJUSTMENT
EA 5.000 $117.000 $100.000 $1,000.000 $128.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,400.000 $1,800.000 $2,500.000 $874.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 25.000 $37.000 $10.000 $100.000 $20.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $6.000 $5.000 $20.000 $0.600
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $432.000 $200.000 $1.000 $26.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,450.000 $2,500.000 $5,000.000 $2,276.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 3.000 $1,400.000 $200.000 $2,000.000 $64.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $410.000 $1.000 $2,000.000 $26.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $1,390.000 $2,500.000 $6,000.000 $26.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,635.000 $500.000 $2,000.000 $26.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 9.000 $50.000 $35.000 $26.010 $12.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $46.000 $35.000 $24.430 $13.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 2.000 $48.500 $35.000 $29.400 $12.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 5.000 $73.000 $50.000 $25.000 $12.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 5.000 $67.000 $50.000 $35.000 $23.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,500.000 $22.000 $22.000 $20.000 $10.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $131.000 $50.000 $60.000 $16.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $38.000 $30.000 $50.000 $35.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $30.000 $60.000 $30.000 $30.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 300.000 $64.500 $30.000 $200.000 $24.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $58.000 $100.000 $20.000 $24.000
REM / REPL STEEL POST W / CONC FND
EA 5.000 $33.000 $80.000 $60.000 $60.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $144.000 $50.000 $500.000 $388.000
REALIGN POSTS
EA 125.000 $8.000 $25.000 $60.000 $1.100
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 38.000 $10.000 $15.000 $10.000 $13.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $31.000 $150.000 $25.000 $13.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 600.000 $40.000 $100.000 $70.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 65.000 $139.000 $70.000 $300.000 $27.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $3,900.000 $5,000.000 $5,500.000 $2,323.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $1,200.000 $1,700.000 $1,400.000 $968.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $200.000 $400.000 $500.000 $22.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $64.000 $200.000 $200.000 $96.000
REPLACE SGT STRUT
EA 7.000 $77.500 $200.000 $100.000 $69.000
REPLACE SGT OBJECT MARKER
EA 16.000 $24.000 $100.000 $100.000 $22.000
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
LF 12.000 $50.000 $30.000 $20.000 $30.000
REPLACE POSTS (TL-4)
EA 300.000 $50.000 $225.000 $1.000 $300.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $140.000 $100.000 $200.000 $320.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $130.000 $200.000 $220.680 $44.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 20.000 $820.000 $500.000 $2,000.000 $5,885.000
REPLACE CABLE (TL-4)
LF 1,000.000 $2.500 $2.500 $1.000 $4.000
CHECK / RE-TENSION CABLE
EA 10.000 $564.000 $800.000 $1,000.000 $33.000
REPLACE POSTS (TL-4)(FURN)
EA 25.000 $150.000 $50.000 $1.000 $5.000
REP OR REPLC CAB BAR TM SEC TL-4(FURN)
EA 5.000 $200.000 $500.000 $1.000 $0.500
REMOVE AND REPLACE (TRACC)
EA 1.000 $300.000 $26,000.000 $1,000.000 $1.000
REPAIR (TRACC)
EA 1.000 $100.000 $2,000.000 $5,000.000 $269.000
REPAIR (WIDE TRACC)
EA 1.000 $100.000 $3,000.000 $5,000.000 $589.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $800.000 $26,000.000 $30,000.000 $22,050.000
REPAIR (CATGR - FRONT SECTION)
EA 1.000 $200.000 $1,200.000 $1,000.000 $360.000
REPAIR (CATGR - END SECTION)
EA 1.000 $200.000 $1,200.000 $1,000.000 $360.000
REMOVE AND REPLACE (CATGR)
EA 1.000 $200.000 $6,000.000 $1,000.000 $3,814.000
REPAIR (QUAD) (N) (BAY)
EA 7.000 $200.000 $2,000.000 $5,000.000 $1,617.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $200.000 $3,000.000 $5,000.000 $176.000
REPAIR (GREAT SYS) (BAY)
EA 1.000 $200.000 $1,000.000 $100.000 $1.000
REPAIR REACT (CYLINDERS)
EA 1.000 $200.000 $3,000.000 $2,500.000 $3,769.760
REPAIR REACT (W) (CYLINDERS)
EA 1.000 $200.000 $200.000 $2,500.000 $3,768.000
REPAIR (TRACC) (BAY)
EA 4.000 $200.000 $900.000 $1,000.000 $294.000
REPAIR (WIDE TRACC) (BAY)
EA 1.000 $200.000 $1,500.000 $1,000.000 $269.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $220.000 $2,200.000 $1,000.000 $16,350.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $800.000 $4,000.000 $1,000.000 $1.000
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
LF 1.000 $525.000 $3,500.000 $5,000.000 $199.000
BRIDGE JOINT REPAIR (FULL DEPTH)
LF 1.000 $700.000 $3,500.000 $2,500.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 4.000 $230.000 $200.000 $100.000 $110.000
TMA (STATIONARY)
DAY 60.000 $420.000 $800.000 $500.000 $4,250.000
Totals: $692,890.500 $554,027.000 $607,498.400 $698,093.760