Items: 69

County: CASS
Length: N/A
Highway: US 59
District: ATLANTA
Control Number: 0218-03-086
DBE Goal: 0.0%
Project: C 218-3-86
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $9,881,472.85
Date: 02/02/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$9,881,472.85
1
$9,573,840.81
Over/Under Est: -3.11% -$307,632.04
$10,201,214.66
Over/Under Est: 3.24% $319,741.81
Amt Left: 6.55% $627,373.85
Over/Under Est: 10.86% $1,072,674.46
Amt Left: 14.42% $1,380,306.50
Delta: -7.38% -$752,932.65
Subcontractor Percentage Amount
TEXOP CONSTRUCTION 7.55% $725,927.12
SOUTHWEST ENVIRONMENT SERVICES LLC 2.12% $203,836.49
TRAFFIC HIGHWAY MAINTENANCE, LLC 1.93% $185,568.12
BAHENA CONSTRUCTION CO., INC. 1.43% $137,493.48
WITHERS CONSTRUCTION, LLC 0.75% $72,111.97
PANOLA SIGN & BARRICADE, INC. 0.42% $40,382.70
DUSTIN ALLEN, INC. 0.42% $40,382.70
PROFESSIONAL TRAFFIC CONTROL LLC 0.09% $8,653.44
Total: 14.71% $1,414,356.02

Bid Items & Bid Tabulations

69 Total 0 of 69
CASS  |  US 59  |  ATLANTA  |  0218-03-086  |  02/02/2024  |  $9,881,472.85  |  C 218-3-86  |  SURF/ROADWAY RESTOR  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 43.000 $7,500.000 $3,450.000 $10,000.000 $20,000.000
REMOVING CONC (MISC)
SY 146.000 $85.000 $17.250 $30.000 $50.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 156.000 $50.000 $226.370 $100.000 $50.000
BACKFILL (TY C)
STA 275.400 $375.000 $924.840 $550.000 $820.000
BLADING
STA 9.000 $500.000 $214.250 $1,000.000 $200.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 176,228.000 $1.250 $0.630 $0.600 $0.650
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 176,228.000 $0.450 $0.120 $0.120 $0.120
FERTILIZER
TON 5.280 $1,075.000 $575.000 $700.000 $2,640.000
VEGETATIVE WATERING
MG 2,821.000 $50.000 $39.900 $15.000 $25.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 6,599.000 $90.000 $80.100 $75.000 $110.000
PLANE ASPH CONC PAV (3 1/2")
SY 144,547.000 $4.000 $5.430 $6.000 $6.500
CUT & RESTORE CONC PAVING
SY 124.000 $230.000 $201.250 $800.000 $130.000
CUT & RESTORE ASPH PAVING
SY 57.000 $170.000 $172.500 $150.000 $120.000
RIPRAP (CONC)(4 IN)
CY 20.000 $960.000 $690.000 $600.000 $1,000.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 110.000 $235.000 $717.210 $300.000 $250.000
BEDDING MATERIAL (6 IN)
CY 36.000 $275.000 $460.000 $300.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 42.000 $600.000 $747.500 $700.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 315.000 $95.000 $69.000 $75.000 $100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,760.000 $1,092.500 $900.000 $1,100.000
SET (REMOV & REINSTALL)
EA 18.000 $500.000 $575.000 $800.000 $500.000
REMOV STR (PIPE)
LF 375.000 $75.000 $17.250 $20.000 $40.000
MOBILIZATION
LS 1.000 $982,000.000 $287,215.220 $1,000,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,000.000 $35,605.150 $40,000.000 $20,000.000
RUMBLE STRIPS (SHOULDER)
LF 28,340.000 $0.500 $0.100 $1.000 $0.400
MTL W-BEAM GD FEN (TIM POST)
LF 637.500 $30.000 $31.910 $28.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,650.000 $1,782.500 $2,100.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 637.500 $4.500 $5.750 $6.000 $2.700
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $250.000 $287.500 $600.000 $265.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,200.000 $3,277.500 $3,600.000 $3,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $370.000 $402.500 $600.000 $265.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $780.000 $862.500 $800.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $900.000 $1,035.000 $900.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $950.000 $1,035.000 $900.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $1,300.000 $1,725.000 $1,600.000 $2,000.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 31.000 $1,000.000 $1,092.500 $1,100.000 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $1,100.000 $1,150.000 $1,200.000 $1,400.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 59.000 $650.000 $632.500 $500.000 $550.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 6.000 $680.000 $862.500 $600.000 $600.000
REMOVE SM RD SN SUP&AM
EA 94.000 $145.000 $92.000 $150.000 $130.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 15.000 $40.000 $57.500 $75.000 $60.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 30.000 $100.000 $115.000 $180.000 $165.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
EA 24.000 $110.000 $115.000 $180.000 $135.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 57,830.000 $0.500 $0.400 $0.450 $0.550
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 40,610.000 $0.500 $0.400 $0.450 $0.550
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 770.000 $1.000 $2.300 $3.300 $4.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 7,390.000 $4.000 $1.730 $2.000 $2.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 7,390.000 $1.000 $1.380 $2.000 $2.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 120.000 $1.250 $2.300 $3.300 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,220.000 $1.200 $1.300 $1.600 $2.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,160.000 $17.000 $17.250 $20.000 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $230.000 $287.500 $250.000 $278.000
PREFAB PAV MRK TY C (W) (WORD)
EA 14.000 $270.000 $402.500 $320.000 $370.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 270.000 $64.000 $74.750 $60.000 $73.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 510.000 $15.500 $17.250 $20.000 $20.000
REFL PAV MRKR TY I-C
EA 66.000 $4.750 $8.050 $6.000 $6.600
REFL PAV MRKR TY II-A-A
EA 263.000 $5.500 $7.190 $6.000 $6.600
REFL PAV MRKR TY II-C-R
EA 389.000 $5.500 $6.500 $6.000 $6.600
SP MIXES SP-D PG76-22
TON 22,045.000 $150.000 $184.160 $175.000 $170.000
TACK COAT
GAL 20,289.000 $7.000 $6.420 $5.000 $7.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 9,418.000 $275.000 $225.660 $215.000 $218.000
TACK COAT
GAL 8,803.000 $7.000 $6.480 $5.000 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $15,800.000 $13,611.640 $30,000.000 $24,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 200.000 $11.000 $23.000 $20.000 $20.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 31,650.000 $1.000 $0.980 $1.100 $1.320
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 7,540.000 $1.000 $1.040 $1.100 $1.320
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 32,645.000 $1.000 $0.980 $1.100 $1.320
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 1,290.000 $1.000 $1.040 $1.100 $1.320
TMA (STATIONARY)
DAY 83.000 $285.000 $509.400 $300.000 $330.000
TMA (MOBILE OPERATION)
DAY 10.000 $325.000 $938.420 $300.000 $330.000
Totals: $9,881,472.850 $9,573,840.826 $10,201,214.660 $10,954,147.310