Show Job Controls
Bid Cobra

BROWN US 67 (0079-01-043)

Items: 27

County: BROWN
Length: N/A
Highway: US 67
District: BROWNWOOD
Control Number: 0079-01-043
DBE Goal: N/A
Project: STP 2020(764)HES
Guaranty: N/A
Time: 142 WORKING DAYS
Engineer's Estimate: $764,278.75
Date: 04/08/2020 (6 years ago)
Contract Number: N/A
Type: IMPROVE GUARDRAIL & SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$764,278.75
1
$735,534.25
Over/Under Est: -3.76% -$28,744.50
$784,232.00
Over/Under Est: 2.61% $19,953.25
Amt Left: 6.62% $48,697.75
$874,580.12
Over/Under Est: 14.43% $110,301.37
Amt Left: 18.9% $139,045.87
Delta: -11.52% -$90,348.12
$1,052,527.50
Over/Under Est: 37.72% $288,248.75
Amt Left: 43.1% $316,993.25
Delta: -20.35% -$177,947.38
Over/Under Est: 39.31% $300,457.31
Amt Left: 44.76% $329,201.81
Delta: -1.16% -$12,208.56
$1,313,818.71
Over/Under Est: 71.9% $549,539.96
Amt Left: 78.62% $578,284.46
Delta: -23.39% -$249,082.65

Bid Items & Bid Tabulations

27 Total 0 of 27
BROWN  |  US 67  |  BROWNWOOD  |  0079-01-043  |  04/08/2020  |  $764,278.75  |  STP 2020(764)HES  |  IMPROVE GUARDRAIL & SAFETY TREAT FIX...  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
3LW CIVIL LLC
HJC FARMS, INC.
CDM HOLDINGS, LLC
FNH CONSTRUCTION, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
ALTUS CONSTRUCTION LLC
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 1.000 $1,100.000 $2,550.000 $1,250.000 $1,500.000 $5,000.000 $4,003.590 $1,517.750
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 584.000 $30.000 $35.000 $20.000 $39.000 $40.000 $59.820 $45.300
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 18,630.000 $1.350 $0.700 $0.250 $0.700 $1.000 $0.250 $1.740
BROADCAST SEED (TEMP) (WARM)
SY 9,315.000 $0.650 $0.700 $0.250 $0.750 $1.000 $0.260 $0.160
BROADCAST SEED (TEMP) (COOL)
SY 9,315.000 $0.650 $0.700 $0.250 $0.750 $1.000 $0.260 $0.180
VEGETATIVE WATERING
MG 460.000 $50.000 $55.000 $50.000 $25.000 $50.000 $55.280 $37.750
RIPRAP (CONC)(5 IN)
CY 31.400 $550.000 $700.000 $500.000 $700.000 $650.000 $695.330 $582.690
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
LF 7.000 $750.000 $2,400.000 $750.000 $1,825.000 $3,000.000 $1,624.120 $1,019.180
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $8,000.000 $10,000.000 $16,000.000 $16,300.000 $25,000.000 $26,751.550 $17,514.810
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
EA 2.000 $12,000.000 $18,000.000 $22,500.000 $24,500.000 $35,000.000 $37,337.420 $17,816.790
MOBILIZATION
LS 1.000 $50,000.000 $53,500.000 $50,000.000 $62,000.000 $100,000.000 $150,275.370 $128,341.270
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $10,000.000 $2,500.000 $12,500.000 $8,500.000 $8,011.940 $22,648.460
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,150.000 $4.500 $1.000 $5.000 $3.400 $4.000 $5.880 $3.340
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,150.000 $1.200 $1.000 $1.000 $1.000 $2.000 $1.760 $1.030
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,150.000 $4.100 $4.000 $8.000 $3.750 $18.000 $11.110 $6.710
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,150.000 $1.200 $1.000 $1.000 $1.000 $9.000 $1.760 $2.070
MTL W-BEAM GD FEN (STEEL POST)
LF 7,025.000 $26.000 $21.000 $24.000 $24.000 $28.000 $28.620 $35.830
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,500.000 $1,800.000 $2,100.000 $2,025.000 $1,850.000 $2,770.410 $2,478.740
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,300.000 $1,500.000 $1,075.000 $1,850.000 $2,041.240 $1,740.560
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 187.500 $60.000 $50.000 $65.000 $50.000 $40.000 $72.150 $95.330
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 32.000 $1,500.000 $1,100.000 $1,500.000 $990.000 $1,500.000 $1,433.830 $1,119.060
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $850.000 $900.000 $100.000 $550.000 $2,500.000 $3,330.620 $1,155.070
REMOVE METAL BEAM GUARD FENCE
LF 9,032.500 $1.500 $1.300 $3.000 $4.250 $3.000 $2.210 $3.790
GUARDRAIL END TREATMENT (INSTALL)
EA 79.000 $2,500.000 $2,400.000 $3,000.000 $2,800.000 $2,850.000 $3,301.550 $3,715.250
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 98.000 $30.000 $15.000 $37.000 $35.000 $100.000 $45.250 $40.220
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 48.000 $30.000 $15.000 $37.000 $25.000 $100.000 $46.550 $42.180
TMA (STATIONARY)
DAY 222.000 $250.000 $100.000 $250.000 $220.000 $350.000 $163.670 $754.950
Totals: $764,278.750 $735,534.250 $784,232.000 $874,580.125 $1,052,527.500 $1,064,736.072 $1,313,818.726