Show Job Controls
Bid Cobra

BOWIE US0059 (6357-08-001)

Items: 36

County: BOWIE
Length: N/A
Highway: US0059
District: ATLANTA
Control Number: 6357-08-001
DBE Goal: N/A
Project: RMC - 635708001
Guaranty: N/A
Time: 613 CALENDAR DAYS
Engineer's Estimate: $589,775.00
Date: 04/08/2020 (6 years ago)
Contract Number: N/A
Type: CALLOUT METAL BEAM GUARD FENCE REPAIR - NORTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$589,775.00
1
$702,035.00
Over/Under Est: 19.03% $112,260.00
Over/Under Est: 44.7% $263,650.00
Amt Left: 21.56% $151,390.00

Bid Items & Bid Tabulations

36 Total 0 of 36
BOWIE  |  US0059  |  ATLANTA  |  6357-08-001  |  04/08/2020  |  $589,775.00  |  RMC - 635708001  |  CALLOUT METAL BEAM GUARD FENCE REPAI...  |  613 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
JCW CONSTRUCTION, LLC
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 40.000 $100.000 $100.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $100.000 $100.000 $100.000
MOBILIZATION (CALLOUT)
EA 20.000 $500.000 $100.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $15.000 $50.000 $20.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,000.000 $1,000.000 $1,155.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $300.000 $1.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $1,500.000 $1,500.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $500.000 $1.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 50.000 $30.000 $10.000 $20.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 50.000 $30.000 $10.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 50.000 $30.000 $12.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 50.000 $30.000 $14.000 $20.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,500.000 $20.000 $32.000 $28.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $40.000 $35.000 $20.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 15.000 $50.000 $40.000 $45.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 200.000 $40.000 $55.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $50.000 $55.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $25.000 $300.000 $300.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 125.000 $2,000.000 $2,820.000 $3,000.000
REMOVE AND REPLACE DAT
EA 25.000 $600.000 $450.000 $1,275.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $10,000.000 $10,000.000 $16,050.000
REPAIR (TRACC)
EA 5.000 $2,500.000 $1,000.000 $2,500.000
REPAIR (WIDE TRACC)
EA 5.000 $2,500.000 $3,000.000 $1,500.000
REMOVE AND REPLACE (NARROW QUAD)
EA 2.000 $10,000.000 $10,000.000 $23,000.000
REPAIR (NARROW QUAD)
EA 5.000 $2,500.000 $1,000.000 $1,000.000
REMOVE AND REPLACE (WIDE QUAD)
EA 2.000 $12,500.000 $15,000.000 $20,000.000
REPAIR (WIDE QUAD)
EA 5.000 $2,500.000 $1,000.000 $2,000.000
REMOVE AND REPLACE (CATGR)
EA 2.000 $6,500.000 $2,000.000 $7,500.000
REPAIR (QUAD) (N) (BAY)
EA 5.000 $1,400.000 $1,000.000 $700.000
REPAIR (QUAD) (W) (BAY)
EA 5.000 $1,800.000 $200.000 $700.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $10,000.000 $14,000.000 $22,250.000
REPAIR (FASTRACC) (BAY)
EA 20.000 $1,000.000 $500.000 $550.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 15.000 $10.000 $300.000 $200.000
REPAIR(W-BEAM, TUBE & SPLICE-T101 RAIL)
LF 100.000 $5.000 $30.000 $50.000
REPAIR (W-BEAM - T101 RAIL)
LF 500.000 $10.000 $10.000 $15.000
TMA (STATIONARY)
DAY 100.000 $200.000 $350.000 $400.000
Totals: $589,775.000 $702,035.000 $853,425.000