BOWIE IH 30 (0610-05-060)

Items: 103

County: BOWIE
Length: 1.0900 MILES
Highway: IH 30
District: ATLANTA
Control Number: 0610-05-060
DBE Goal: 0.0%
Project: F 2026(876)
Guaranty: $100,000.00
Time: 337 WORKING DAYS
Engineer's Estimate: $12,401,196.00
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263212
Type: CONSTRUCT TRUCK PARKING
Project ID: A00203348
Contract Type: Federal
Project Description: CONSTRUCT TRUCK PARKING AREAS ON NORTH AND SOUTH SIDE OF IH 30 IN BOWIE COUNTY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
TOMMY BRUCE
BOWIE IH 30 (0610-05-060)
Project Name: N/A
Project: F 2026(876)
Length: 1.0900 MILES
Project Type: CONSTRUCTION
Limits From: 0.5 MI W OF CR 4204
Limits To: 0.5 MI E OF CR 4204
Project Description: CONSTRUCT TRUCK PARKING AREAS ON NORTH AND SOUTH SIDE OF IH 30 IN BOWIE COUNTY
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

103 Total 0 of 103
BOWIE  |  IH 30  |  ATLANTA  |  0610-05-060  |  1:00 PM AUGUST 06, 2026  |  $12,401,196.00  |  F 2026(876)  |  CONSTRUCT TRUCK PARKING  |  337 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
AC 46.100
REMOV CONC (PAV)
SY 22,682.000
REMOV CONC (RIPRAP)
SY 1,954.000
REMOV CONC (MEDIANS)
SY 200.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 2,042.000
REMOV CONC (FOUNDATIONS)
SY 572.000
REMOV CONC (MISC)
SY 870.000
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
SY 11,549.000
EXCAV (ROADWAY)
CY 3,711.000
EMBANK (VEH)(DC)(TY C)
CY 70,340.000
FURN & PLACE TOPSOIL (4")
SY 22,250.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 22,346.000
BOND FBR MTRX SEED (TEMP)(WARM)
SY 11,173.000
BOND FBR MTRX SEED (TEMP)(COOL)
SY 11,173.000
RDSIDE AMENITY (TRASH/RECYCLE BIN)
EA 4.000
FL BS (CMP IN PLC)(TY E GR 4) (4")
SY 80,093.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 1,665.000
LIME TRT (NEW BASE)(8")
SY 30,873.000
LIME TRT (NEW BASE)(10")
SY 80,093.000
CEMENT
TON 1,665.000
CEMENT TRT (NEW BASE)(8")
SY 30,873.000
CEMENT TRT (NEW BASE)(10")
SY 80,093.000
PRIME COAT (MC-30)
GAL 27,743.000
FOG SEAL (CSS-1H)
GAL 22,426.000
ASPH (AC-20-5TR)
GAL 15,440.000
AGGR (TY-PB, GR-4)(SAC-A)
CY 256.000
SP MIXES SP-C PG76-22
TON 15,759.000
SP MIXES SP-D SAC-A PG76-22
TON 3,110.000
TACK COAT
GAL 18,524.000
TRENCH EXCAVATION PROTECTION
LF 764.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 12.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 200.000
CL C CONC (COLLAR)
EA 1.000
RIPRAP (CONC)(5 IN)
CY 207.000
RIPRAP (CONC)(CL B)
CY 26.000
RIPRAP (MOW STRIP)(4 IN)
CY 16.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 20.000
RC PIPE (CL III)(18 IN)
LF 168.000
RC PIPE (CL III)(24 IN)
LF 672.000
RC PIPE (CL III)(30 IN)
LF 1,012.000
RC PIPE (CL III)(42 IN)
LF 548.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 7.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 2.000
REMOV STR (INLET)
EA 8.000
REMOV STR (HEADWALL)
EA 15.000
REMOV STR (PIPE)
LF 905.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000
TMA (STATIONARY)
DAY 177.000
TMA (MOBILE OPERATION)
DAY 26.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 315.000
ROCK FILTER DAMS (REMOVE)
LF 315.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 278.000
CONSTRUCTION EXITS (REMOVE)
SY 278.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,203.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,203.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 300.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000
PTB (FUR&INST)(SGL SLP)(TY 1) OR (STL)
LF 15,630.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 7,605.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 15,630.000
MTL W-BEAM GD FEN (TIM POST)
LF 275.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000
PIPE UNDERDRAINS (TY 9) (6")
LF 400.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 8.000
LED HI MST IL ASM (6 FIXT) (TY A)
EA 8.000
CONDT (PVC) (SCH 40) (2")
LF 3,769.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 2,246.000
ELEC CONDR (NO.6) BARE
LF 6,190.000
ELEC CONDR (NO.6) INSULATED
LF 12,410.000
GROUND BOX TY A (122311)
EA 8.000
GROUND BOX TY A (122311)W/APRON
EA 19.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 3.000
ALUMINUM SIGNS (TY G)
EA 7.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 7.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000
REMOVE SM RD SN SUP&AM
EA 25.000
RELOCATE LRSA
EA 1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 37.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 15,420.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 2,070.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,495.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,120.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 10,570.000
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 3,310.000
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 1,825.000
REFL PAV MRKR TY II-C-R
EA 286.000
ELIM EXT PM & MRKS (6")
LF 13,220.000
PERMEABLE CONCRETE EDGE DRAIN
LF 9,183.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $45,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $90,000.00
Total: $135,000.00