Show Job Controls
Bid Cobra

BOWIE IH 369 (0218-02-055)

Items: 33

County: BOWIE
Length: N/A
Highway: IH 369
District: ATLANTA
Control Number: 0218-02-055
DBE Goal: 0.0%
Project: F 2024(669)
Guaranty: N/A
Time: 98 WORKING DAYS
Engineer's Estimate: $6,981,683.81
Date: 02/02/2024 (2 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,981,683.81
$10,246,641.10
Over/Under Est: 46.76% $3,264,957.29
Over/Under Est: 46.93% $3,276,327.84
Amt Left: 0.11% $11,370.55
$12,139,996.41
Over/Under Est: 73.88% $5,158,312.60
Amt Left: 18.48% $1,893,355.31
Delta: -18.35% -$1,881,984.76
Subcontractor Percentage Amount
TEXOP CONSTRUCTION 2.34% $244,570.10
CHEROKEE SERVICES 1.40% $146,323.99
KITECO PROPERTY SOLUTIONS INC. 1.40% $146,323.99
STRIPING TECHNOLOGY, L.P. 1.06% $110,788.16
MORRIS COUNTY CONTRACTORS, L.L.C. 0.42% $43,897.20
PANOLA SIGN & BARRICADE, INC. 0.18% $18,813.08
PROFESSIONAL TRAFFIC CONTROL LLC 0.07% $7,316.20
TIME STRIPING, INC. 0.07% $7,316.20
Total: 6.94% $725,348.92

Bid Items & Bid Tabulations

33 Total 0 of 33
BOWIE  |  IH 369  |  ATLANTA  |  0218-02-055  |  02/02/2024  |  $6,981,683.81  |  F 2024(669)  |  RESURF ROADWAY  |  98 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
RK HALL, LLC
REMOVING CONCRETE(MOW STRIP)
LF 4,386.000 $1.360 $22.000 $25.000 $48.100
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 140.000 $97.610 $100.000 $165.000 $302.240
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 7,500.000 $58.430 $75.000 $105.000 $97.180
PLANE ASPH CONC PAV (2")
SY 10,870.000 $3.280 $5.000 $20.000 $4.470
PLANE ASPH CONC PAV (3")
SY 142,357.000 $3.500 $5.000 $4.000 $5.310
RIPRAP (MOW STRIP)(4 IN)
CY 486.000 $650.050 $700.000 $890.000 $747.500
CLEANING AND SEALING EXISTING JOINTS
LF 3,170.000 $3.070 $55.000 $60.000 $47.150
MOBILIZATION
LS 1.000 $637,298.440 $1,000,000.000 $1,000,000.000 $606,999.820
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,000.000 $150,000.000 $15,500.000 $25,981.730
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 49,151.000 $0.500 $1.000 $0.500 $0.160
MTL W-BEAM GD FEN (TIM POST)
LF 1,212.500 $27.480 $26.000 $35.000 $32.200
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,694.000 $1,500.000 $1,700.000 $1,725.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,485.000 $1,500.000 $1,600.000 $1,667.500
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $130.840 $300.000 $270.000 $345.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,206.820 $3,300.000 $3,700.000 $3,852.500
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 3,481.000 $2.270 $2.500 $3.250 $9.760
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 7,075.000 $1.620 $2.500 $4.000 $9.760
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 30,947.000 $1.850 $2.500 $3.250 $9.760
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 30,947.000 $1.850 $2.500 $3.250 $9.760
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 2,485.000 $10.600 $8.000 $9.250 $8.050
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,450.000 $16.980 $14.000 $16.500 $14.150
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $243.040 $300.000 $300.000 $253.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $295.410 $400.000 $350.000 $299.000
REFL PAV MRKR TY I-C
EA 395.000 $4.750 $6.000 $7.000 $5.750
SP MIXES SP-D PG76-22
TON 12,940.000 $152.000 $165.000 $170.000 $229.240
TACK COAT
GAL 35,796.000 $5.100 $5.000 $6.850 $7.310
TBPFC (MEMBRANE)
GAL 42,707.000 $4.000 $7.000 $6.600 $8.110
TBPFC PG76-22 SAC-A
TON 10,143.000 $225.000 $330.000 $355.000 $446.500
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 30,947.000 $0.890 $1.100 $1.350 $1.150
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 7,737.000 $1.400 $1.100 $1.350 $1.150
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 30,947.000 $1.040 $1.100 $1.350 $1.150
TMA (STATIONARY)
DAY 65.000 $248.780 $300.000 $330.000 $618.260
TMA (MOBILE OPERATION)
DAY 28.000 $386.600 $300.000 $330.000 $1,138.950
Totals: $6,981,683.810 $10,246,641.100 $10,258,011.650 $12,139,996.410