BLANCO US 281 (0252-03-056)

Items: 86

County: BLANCO
Length: 1.3150 MILES
Highway: US 281
District: AUSTIN
Control Number: 0252-03-056
DBE Goal: 0.0%
Project: STP 2026(902)VRU
Guaranty: $50,000.00
Time: 146 WORKING DAYS
Engineer's Estimate: $2,495,198.94
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263226
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00193144
Contract Type: Federal
Project Description: CONSTRUCT PAVED SHOULDER >= 5FT, PROFILE EDGE AND CENTER LINE STRIPING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
BLANCO US 281 (0252-03-056)
Project Name: N/A
Project: STP 2026(902)VRU
Length: 1.3150 MILES
Project Type: CONSTRUCTION
Limits From: 0.8 MI N OF PR1
Limits To: 0.515 MI S OF PR1
Project Description: CONSTRUCT PAVED SHOULDER >= 5FT, PROFILE EDGE AND CENTER LINE STRIPING
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

86 Total 0 of 86
BLANCO  |  US 281  |  AUSTIN  |  0252-03-056  |  1:00 PM AUGUST 06, 2026  |  $2,495,198.94  |  STP 2026(902)VRU  |  HAZARD ELIM & SAFETY  |  146 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 76.340
TREE PROTECTION (INSTALL)
LF 200.000
TREE PROTECTION (REMOVE)
LF 200.000
REMOV CONC (MOWSTRIP)
SY 477.000
REMOV CONC (RIPRAP)
SY 102.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 907.000
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 326.000
EXCAV (ROADWAY)
CY 10,631.000
EMBANK (FNL)(OC)(TY B)
CY 2,517.000
EMBANK (FNL)(OC)(TY C)
CY 5.000
BACKFILL (TY A)
STA 28.000
FURN & PLACE TOPSOIL (4")
SY 24,136.000
DRILL SEED (PERM_RURAL_CLAY)
SY 24,136.000
VEGETATIVE WATERING
TGL 406.000
SOIL RET BLKT(SL_MOD_CLAY_LONG)
SY 21,797.000
SOIL RET BLKT(CHAN_PERM_6 PSF)
SY 2,339.000
WILDFLOWER SEEDING
AC 4.980
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 2,514.000
PRIME COAT (AE-P)
GAL 1,908.000
D-GR HMA TY-B PG64-22
TON 1,428.000
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 367.000
D-GR HMA TY-D PG76-22
TON 718.000
TOM-C PG76-22 SAC-B
TON 2,144.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 4,453.000
PLANE ASPH CONC PAV(0" TO 1" MICRO)
SY 2,130.000
TEMPORARY SPL SHORING
SF 3,860.000
RIPRAP (CONC)(CL B)(5 IN)
CY 23.000
RIPRAP (MOW STRIP)(4 IN)
CY 75.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 529.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 14.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 6.000
RC PIPE (CL III)(18 IN)
LF 119.000
RC PIPE (CL III)(36 IN)
LF 10.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000
WINGWALL (PW - 1) (HW=15 FT)
EA 1.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000
REMOV STR (WINGWALL)
EA 4.000
REMOV STR (HEADWALL)
EA 1.000
REMOV STR (PIPE)
LF 31.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 200.000
TMA (MOBILE OPERATION)
DAY 30.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 109.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 273.000
ROCK FILTER DAMS (REMOVE)
LF 382.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,661.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,661.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 11,050.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 11,050.000
DRIVEWAYS (ACP)
SY 482.000
TURNOUTS (ACP)
SY 34.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,135.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000
REMOVE METAL BEAM GUARD FENCE
LF 900.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000
WIRE FENCE (TY C)
LF 380.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000
REMOVE SM RD SN SUP&AM
EA 5.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 11.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 8.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 3,827.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 15,269.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 15,269.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,144.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,489.000
RE PM TY II (W) 6" (BRK)
LF 3,814.000
RE PM TY II (W) 6" (SLD)
LF 15,257.000
RE PM TY II (Y) 6" (SLD)
LF 15,357.000
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 15,257.000
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 15,357.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 3,814.000
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 14,905.000
PREFAB PM TY C (W)(12")(SLD)
LF 12.000
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
LF 14,950.000
REFL PAV MRKR TY I-C
EA 191.000
REFL PAV MRKR TY II-A-A
EA 192.000
ELIM EXT PM & MRKS (6")
LF 78,255.000
BONDING COURSE
GAL 5,662.000
TEMP SPEED MONITOR SYS
EA 2.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $35,000.00
Total: $67,000.00