Show Job Controls
Bid Cobra

BASTROP US 290 (0114-04-073)

Items: 53

County: BASTROP
Length: N/A
Highway: US 290
District: AUSTIN
Control Number: 0114-04-073
DBE Goal: N/A
Project: BR 2020(844)
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $907,709.00
Date: 04/08/2020 (6 years ago)
Contract Number: N/A
Type: REHABILITATE BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$907,709.00
1
$863,707.80
Over/Under Est: -4.85% -$44,001.20
$974,626.50
Over/Under Est: 7.37% $66,917.50
Amt Left: 12.84% $110,918.70
Over/Under Est: 29.64% $269,076.53
Amt Left: 36.25% $313,077.73
Delta: -20.74% -$202,159.03
Over/Under Est: 58.94% $535,009.50
Amt Left: 67.04% $579,010.70
Delta: -22.60% -$265,932.97

Bid Items & Bid Tabulations

53 Total 0 of 53
BASTROP  |  US 290  |  AUSTIN  |  0114-04-073  |  04/08/2020  |  $907,709.00  |  BR 2020(844)  |  REHAB BRIDGE  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RESTEK, INC.
RELMCO, INC.
GIBSON & ASSOCIATES, INC.
SOUTHERN ROAD & BRIDGE, LLC
PREPARING ROW
STA 5.680 $1,000.000 $3,000.000 $5,000.000 $4,000.000 $2,500.000
REMOVING CONC (RIPRAP)
SY 12.000 $60.000 $175.000 $150.000 $355.000 $250.000
REMOVING CONC (PILE ENCASEMENT)
CY 1.000 $500.000 $1,000.000 $2,500.000 $1,000.000 $5,000.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 8,110.000 $1.500 $0.920 $1.000 $0.300 $0.300
VEGETATIVE WATERING
MG 161.000 $80.000 $35.000 $20.000 $50.000 $100.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,168.000 $3.000 $2.000 $3.000 $2.010 $1.500
PLANE ASPH CONC PAV(0" TO 2")
SY 857.000 $6.000 $12.500 $20.000 $20.000 $18.000
FLOWABLE BACKFILL
CY 11.000 $300.000 $500.000 $1,800.000 $605.000 $950.000
CL C CONC (PILE ENCASEMENT)
CY 10.000 $6,000.000 $2,000.000 $5,500.000 $5,000.000 $15,000.000
CL C CONC (COLUMN ENCASEMENT)
CY 6.000 $6,000.000 $2,500.000 $5,500.000 $5,200.000 $15,000.000
SILICONE RESIN PAINT FINISH
SF 1,620.000 $6.000 $8.500 $11.000 $11.000 $18.000
EPOXY WATERPROOF FINISH (TY X)
SF 1,235.000 $12.000 $14.000 $25.000 $14.000 $33.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 143.000 $250.000 $200.000 $250.000 $360.000 $444.000
RIPRAP (CONC)(4 IN)
CY 1.000 $1,000.000 $1,000.000 $3,500.000 $1,000.000 $1,500.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 107.000 $250.000 $225.000 $225.000 $214.500 $220.000
RIPRAP (MOW STRIP)(4 IN)
CY 53.000 $490.000 $625.000 $450.000 $522.500 $800.000
CLEANING AND SEALING EXISTING JOINTS
LF 258.000 $35.000 $40.000 $100.000 $103.000 $65.000
CLEANING AND SEALING JOINTS
LF 129.000 $25.000 $75.000 $100.000 $68.000 $65.000
CLEAN & PAINT EXIST PILING (SYSTEM II)
LS 1.000 $70,000.000 $132,500.000 $135,000.000 $228,750.000 $250,000.000
MILLING CONCRETE SLAB (1/4IN)
SY 857.000 $10.000 $12.500 $30.000 $20.000 $15.000
MOBILIZATION
LS 1.000 $82,225.000 $30,000.000 $75,000.000 $115,000.000 $135,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $9,000.000 $3,000.000 $4,500.000 $21,500.000 $5,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 780.000 $27.000 $18.750 $25.000 $16.250 $16.000
CONSTRUCTION EXITS (REMOVE)
SY 780.000 $13.000 $13.750 $12.000 $4.250 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,375.000 $10.000 $5.000 $4.000 $2.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,375.000 $5.000 $1.500 $1.500 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 775.000 $26.000 $28.250 $40.000 $23.500 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,900.000 $2,150.000 $3,500.000 $1,775.000 $1,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,800.000 $1,320.000 $3,500.000 $1,100.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 3.000 $950.000 $930.000 $3,500.000 $770.000 $850.000
REMOVE METAL BEAM GUARD FENCE
LF 775.000 $4.000 $2.650 $5.000 $2.250 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $310.000 $180.000 $500.000 $150.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,640.000 $3,500.000 $3,000.000 $4,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $420.000 $300.000 $800.000 $250.000 $255.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $55.000 $36.000 $40.000 $30.000 $45.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 8.000 $28.000 $36.000 $40.000 $30.000 $45.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,655.000 $2.000 $1.600 $2.000 $1.500 $2.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,655.000 $2.000 $1.600 $2.000 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 354.000 $2.000 $3.000 $8.000 $7.500 $4.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,180.000 $0.500 $3.350 $4.000 $2.750 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 122.000 $0.500 $6.650 $50.000 $5.500 $22.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 122.000 $0.500 $6.650 $50.000 $5.500 $2.000
REFL PAV MRKR TY II-C-R
EA 59.000 $5.000 $40.000 $25.000 $33.000 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,180.000 $3.000 $3.350 $3.000 $2.750 $2.000
PAV SURF PREP FOR MRK (4")
LF 1,424.000 $1.000 $2.000 $2.000 $1.650 $2.000
REM & RESET SGT IMPACT HEAD
EA 2.000 $1,500.000 $750.000 $5,500.000 $1,000.000 $1,000.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 6.000 $200.000 $150.000 $800.000 $250.000 $225.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 81.000 $60.000 $20.000 $150.000 $60.000 $100.000
TEMP CONSTRUCTION ACCESS
LS 5.000 $2,000.000 $1,000.000 $10,000.000 $1,000.000 $7,500.000
POLYESTER POLYMER CONC OVERLAY (1-1/2")
SY 857.000 $200.000 $300.000 $50.000 $200.000 $333.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $8,000.000 $10,000.000 $14,750.000 $500.000
TMA (STATIONARY)
DAY 100.000 $400.000 $225.000 $300.000 $350.000 $10.000
TMA (MOBILE OPERATION)
HR 24.000 $200.000 $45.000 $50.000 $85.000 $10.000
Totals: $907,709.000 $863,707.800 $974,626.500 $1,176,785.530 $1,442,718.500