Job Info for 0911-00-106

County: ANGELINA Highway: VA Date: 08/05/2021 (3 years ago) Engineer's Estimate: $3,924,945 Control Number: 0911-00-106
Project: C 911-00-106 District: LUFKIN Time: 203 WORKING DAYS Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Vol 1 | Vol 2

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,924,945.25
HIGHWAY 19 CONSTRUCTION LLC   $4,121,118.80 1
5% | $196,173.55
ENCINO LANDSCAPE, INC.   $4,615,200.50 2
17.59% | $690,255.25
11.99% | $494,081.70
TI-ZACK CONCRETE, INC.   $4,638,141.50 3
18.17% | $713,196.25
12.55% | $517,022.70
0.50% | $22,941.00
ALTUS CONSTRUCTION LLC   $5,139,228.99 4
30.94% | $1,214,283.74
24.7% | $1,018,110.19
10.80% | $501,087.49

Bid Items

Items: 130, 0 filtered
ANGELINA VA  |  LUFKIN  |  0911-00-106  |  08/05/2021  |  $3,924,945  |  C 911-00-106  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  203 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HIGHWAY 19 CONSTRUCTION LLC ENCINO LANDSCAPE, INC. TI-ZACK CONCRETE, INC. ALTUS CONSTRUCTION LLC
100 6002 PREPARING ROW STA 195.000 $500.000 $500.000 $250.000 $1,000.000 $1,431.890
104 6001 REMOVING CONC (PAV) SY 68.000 $15.000 $25.000 $50.000 $20.000 $29.000
104 6009 REMOVING CONC (RIPRAP) SY 53.000 $10.000 $25.000 $20.000 $25.000 $29.000
104 6011 REMOVING CONC (MEDIANS) SY 126.000 $20.000 $25.000 $20.000 $25.000 $37.280
104 6015 REMOVING CONC (SIDEWALKS) SY 1,328.000 $20.000 $15.000 $20.000 $25.000 $18.470
104 6017 REMOVING CONC (DRIVEWAYS) SY 6,982.000 $20.000 $20.000 $20.000 $25.000 $16.810
104 6021 REMOVING CONC (CURB) LF 163.000 $10.000 $25.000 $15.000 $20.000 $14.500
104 6022 REMOVING CONC (CURB AND GUTTER) LF 158.000 $10.000 $10.000 $15.000 $20.000 $14.500
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY 758.000 $20.000 $25.000 $20.000 $20.000 $15.680
104 6040 REMOVING CONC (PAVERS) SY 9.000 $12.000 $20.000 $20.000 $20.000 $108.740
104 6044 REMOVING CONC (FLUME) SY 13.000 $15.000 $25.000 $20.000 $55.000 $108.740
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 1,507.000 $5.000 $15.000 $15.000 $25.000 $8.040
105 6057 REMOVE STAB BS & ASPH PAV (5"-10") SY 1,173.000 $6.000 $15.000 $15.000 $30.000 $10.360
110 6001 EXCAVATION (ROADWAY) CY 2,258.000 $10.000 $15.000 $10.000 $25.000 $21.480
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 833.000 $10.000 $30.000 $30.000 $30.000 $40.480
158 6003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 186.000 $105.000 $50.000 $300.000 $55.000 $193.710
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 27,115.000 $1.000 $1.000 $2.000 $4.500 $1.190
162 6002 BLOCK SODDING SY 29,747.000 $5.000 $5.000 $5.000 $6.000 $3.990
164 6009 BROADCAST SEED (TEMP) (WARM) SY 13,557.500 $0.500 $0.100 $0.200 $0.200 $0.240
164 6011 BROADCAST SEED (TEMP) (COOL) SY 13,557.500 $0.500 $0.100 $0.200 $0.200 $0.220
168 6001 VEGETATIVE WATERING MG 1,139.000 $15.000 $50.000 $5.000 $1.000 $41.640
170 6001 IRRIGATION SYSTEM LS 1.000 $10,000.000 $5,000.000 $20,000.000 $75,000.000 $299,481.070
400 6005 CEM STABIL BKFL CY 503.000 $100.000 $180.000 $500.000 $150.000 $75.290
403 6001 TEMPORARY SPL SHORING SF 1,535.000 $20.000 $35.000 $30.000 $40.000 $77.020
420 6066 CL C CONC (RAIL FOUNDATION) CY 37.000 $500.000 $800.000 $800.000 $600.000 $549.490
420 6074 CL C CONC (MISC) CY 17.000 $800.000 $1,100.000 $1,000.000 $600.000 $686.860
422 6013 BRIDGE SIDEWALK SF 144.000 $10.000 $25.000 $100.000 $25.000 $29.000
423 6004 RETAINING WALL (CONC BLOCK) SF 114.000 $40.000 $55.000 $50.000 $50.000 $108.740
432 6001 RIPRAP (CONC)(4 IN) CY 170.000 $550.000 $500.000 $600.000 $600.000 $447.870
432 6003 RIPRAP (CONC)(6 IN) CY 14.000 $500.000 $500.000 $700.000 $600.000 $519.040
432 6025 RIRRAP (STONE COMMON)(DRY)(15 IN) CY 37.000 $175.000 $250.000 $300.000 $135.000 $289.960
450 6032 RAIL (TY C223) LF 256.000 $150.000 $40.000 $150.000 $70.000 $123.550
450 6051 RAIL (HANDRAIL)(TY E) LF 467.000 $150.000 $130.000 $150.000 $135.000 $137.540
450 6103 RAIL (TY PR11) LF 423.000 $100.000 $110.000 $200.000 $132.000 $112.240
464 6003 RC PIPE (CL III)(18 IN) LF 216.000 $50.000 $50.000 $70.000 $110.000 $72.380
464 6005 RC PIPE (CL III)(24 IN) LF 405.000 $80.000 $75.000 $100.000 $140.000 $72.440
464 6008 RC PIPE (CL III)(36 IN) LF 30.000 $150.000 $110.000 $150.000 $190.000 $173.850
465 6126 INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) EA 2.000 $4,500.000 $5,000.000 $5,000.000 $8,000.000 $5,899.250
465 6233 INLET (COMP) (TY SIDEWALK BRIDGE) EA 1.000 $7,500.000 $5,000.000 $15,000.000 $9,000.000 $10,825.680
465 6389 INLET (COMPL)(TY SIDEWALK BRIDGE)(MOD) EA 6.000 $7,500.000 $5,000.000 $16,000.000 $9,000.000 $10,908.320
465 6562 INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT) EA 1.000 $7,500.000 $5,000.000 $10,000.000 $1,000.000 $21,747.050
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 10.000 $700.000 $800.000 $1,500.000 $1,800.000 $1,529.540
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 7.000 $1,400.000 $1,100.000 $1,700.000 $2,200.000 $1,941.700
479 6003 ADJUSTING MANHOLES & INLETS EA 5.000 $400.000 $1,500.000 $1,000.000 $700.000 $1,208.540
479 6008 ADJUSTING MANHOLES (WATER METER) EA 4.000 $500.000 $250.000 $500.000 $800.000 $730.930
479 6010 ADJUSTING MANHOLES (ELECTRIC BOX) EA 7.000 $500.000 $500.000 $500.000 $500.000 $405.330
496 6004 REMOV STR (SET) EA 6.000 $500.000 $500.000 $400.000 $275.000 $716.310
496 6006 REMOV STR (HEADWALL) EA 1.000 $1,000.000 $500.000 $500.000 $1,000.000 $2,194.210
496 6007 REMOV STR (PIPE) LF 152.000 $20.000 $50.000 $10.000 $35.000 $19.570
496 6040 REMOV STR (RET WALL) LF 142.000 $45.000 $50.000 $30.000 $50.000 $109.370
496 6099 REMOVE STR (RAIL) LF 16.000 $25.000 $25.000 $10.000 $45.000 $144.980
500 6001 MOBILIZATION LS 1.000 $322,000.000 $390,000.000 $400,000.000 $250,000.000 $507,431.180
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 21.000 $7,500.000 $5,000.000 $10,000.000 $1,000.000 $14,498.030
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 480.000 $35.000 $25.000 $30.000 $1.000 $36.520
506 6011 ROCK FILTER DAMS (REMOVE) LF 480.000 $10.000 $10.000 $5.000 $1.000 $10.880
506 6035 SANDBAGS FOR EROSION CONTROL EA 100.000 $10.000 $5.000 $1.000 $1.000 $8.120
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,668.000 $3.000 $1.000 $3.000 $1.000 $3.040
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,668.000 $1.000 $1.000 $1.000 $1.000 $0.930
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 427.000 $5.000 $1.000 $6.000 $1.000 $5.130
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 41.000 $6.500 $10.000 $15.000 $1.000 $7.310
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 468.000 $2.000 $1.000 $1.000 $1.000 $1.450
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 100.000 $35.000 $75.000 $200.000 $67.000 $160.680
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 40.000 $50.000 $75.000 $200.000 $67.000 $160.680
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 100.000 $10.000 $25.000 $50.000 $10.000 $129.030
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 40.000 $25.000 $25.000 $50.000 $10.000 $129.030
529 6008 CONC CURB & GUTTER (TY II) LF 1,147.000 $35.000 $35.000 $35.000 $40.000 $31.190
529 6015 CONC CURB (TY C1) LF 1,283.000 $50.000 $80.000 $60.000 $85.000 $120.680
529 6016 CONC CURB (TY F1) LF 188.000 $55.000 $120.000 $75.000 $105.000 $116.150
529 6017 CONC CURB (TY F2) LF 54.000 $250.000 $180.000 $100.000 $165.000 $187.220
529 6018 CONC CURB (TY F3) LF 395.000 $225.000 $180.000 $200.000 $200.000 $192.830
529 6037 CONC CURB & GUTTER TY II (MOD) LF 422.000 $65.000 $35.000 $40.000 $60.000 $50.670
530 6004 DRIVEWAYS (CONC) SY 9,320.000 $80.000 $85.000 $75.000 $90.000 $87.490
530 6005 DRIVEWAYS (ACP) SY 18.000 $35.000 $75.000 $75.000 $40.000 $118.130
531 6001 CONC SIDEWALKS (4") SY 8,582.000 $60.000 $68.000 $70.000 $80.000 $58.540
531 6003 CONC SIDEWALKS (6") SY 5,443.000 $80.000 $83.000 $85.000 $110.000 $73.610
531 6004 CURB RAMPS (TY 1) EA 12.000 $1,800.000 $1,500.000 $2,000.000 $1,750.000 $2,024.310
531 6005 CURB RAMPS (TY 2) EA 4.000 $2,000.000 $1,800.000 $2,000.000 $1,750.000 $2,179.630
531 6010 CURB RAMPS (TY 7) EA 40.000 $2,100.000 $1,100.000 $2,000.000 $1,750.000 $2,100.550
531 6013 CURB RAMPS (TY 10) EA 8.000 $2,200.000 $1,100.000 $2,000.000 $1,750.000 $2,256.810
531 6016 CURB RAMPS (TY 21) EA 7.000 $2,500.000 $1,500.000 $2,000.000 $1,750.000 $1,959.520
536 6002 CONC MEDIAN SY 168.000 $105.000 $100.000 $100.000 $110.000 $76.030
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 162.500 $25.000 $35.000 $40.000 $35.000 $29.720
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $1,900.000 $2,500.000 $2,300.000 $2,000.000 $2,522.260
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,200.000 $1,500.000 $1,700.000 $1,500.000 $1,749.200
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 $2,800.000 $3,000.000 $4,000.000 $3,500.000 $3,742.410
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 6.000 $175.000 $500.000 $400.000 $200.000 $253.600
560 6015 MAILBOX INSTALL-S (TIM-POST) TY 5 EA 1.000 $500.000 $750.000 $500.000 $300.000 $579.920
618 6046 CONDT (PVC) (SCH 80) (2") LF 395.000 $15.000 $14.700 $20.000 $16.000 $13.120
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 870.000 $20.000 $19.000 $25.000 $20.000 $23.560
618 6058 CONDT (PVC) (SCH 80) (4") LF 105.000 $20.000 $26.000 $35.000 $28.000 $24.400
618 6059 CONDT (PVC) (SCH 80) (4") (BORE) LF 110.000 $30.000 $34.000 $42.000 $37.000 $29.150
620 6009 ELEC CONDR (NO.6) BARE LF 1,500.000 $1.500 $1.450 $1.750 $1.500 $1.580
620 6010 ELEC CONDR (NO.6) INSULATED LF 750.000 $1.750 $1.700 $2.000 $2.000 $2.090
624 6010 GROUND BOX TY D (162922)W/APRON EA 13.000 $1,200.000 $770.000 $1,000.000 $850.000 $1,557.990
624 6028 REMOVE GROUND BOX EA 5.000 $350.000 $281.000 $450.000 $300.000 $340.410
628 6145 ELC SRV TY D 120/240 060(NS)SS(E)SP(O) EA 1.000 $5,000.000 $5,000.000 $6,000.000 $5,000.000 $5,453.770
636 6001 ALUMINUM SIGNS (TY A) SF 159.000 $20.000 $21.000 $30.000 $30.000 $36.470
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 1.000 $450.000 $1,100.000 $1,600.000 $300.000 $654.920
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $675.000 $750.000 $1,000.000 $300.000 $802.170
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $750.000 $760.000 $1,000.000 $300.000 $1,448.140
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 15.000 $350.000 $370.000 $700.000 $300.000 $444.890
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 1.000 $450.000 $450.000 $800.000 $300.000 $597.620
644 6071 RELOCATE SM RD SN SUP&AM TY TWT EA 3.000 $475.000 $700.000 $900.000 $300.000 $477.250
644 6076 REMOVE SM RD SN SUP&AM EA 21.000 $100.000 $65.000 $70.000 $300.000 $115.350
662 6060 WK ZN PAV MRK REMOV (W)4"(BRK) LF 820.000 $1.250 $5.000 $4.000 $5.000 $7.250
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 5.000 $8.000 $50.000 $30.000 $10.000 $72.490
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 324.000 $0.350 $7.000 $5.000 $10.000 $10.150
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 243.000 $0.350 $7.000 $5.000 $10.000 $10.150
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 534.000 $10.000 $18.000 $30.000 $20.000 $26.100
672 6010 REFL PAV MRKR TY II-C-R EA 4.000 $3.500 $50.000 $20.000 $20.000 $72.490
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 488.000 $0.350 $2.000 $2.000 $1.000 $2.900
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 18.000 $1.500 $10.000 $6.000 $1.000 $14.500
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 378.000 $3.500 $10.000 $10.000 $2.000 $14.500
678 6001 PAV SURF PREP FOR MRK (4") LF 567.000 $0.250 $3.000 $1.000 $1.000 $4.350
678 6008 PAV SURF PREP FOR MRK (24") LF 534.000 $1.500 $10.000 $3.000 $1.000 $4.350
680 6005 INS HY TRF SIG (DPT SUP CNT & CAB)(ISO) EA 1.000 $10,000.000 $4,500.000 $6,000.000 $4,500.000 $16,998.600
680 6011 INSTALL HWY TRF SIG (UPGRADE) EA 1.000 $15,000.000 $2,278.000 $4,000.000 $2,500.000 $16,240.440
682 6018 PED SIG SEC (LED)(COUNTDOWN) EA 4.000 $550.000 $462.000 $650.000 $500.000 $701.030
684 6007 TRF SIG CBL (TY A)(12 AWG)(2 CONDR) LF 3,495.000 $1.750 $1.680 $2.000 $2.000 $1.570
684 6009 TRF SIG CBL (TY A)(12 AWG)(4 CONDR) LF 4,110.000 $2.000 $2.120 $2.500 $2.250 $2.020
684 6010 TRF SIG CBL (TY A)(12 AWG)(5 CONDR) LF 1,040.000 $2.500 $2.340 $2.750 $2.500 $2.800
684 6012 TRF SIG CBL (TY A)(12 AWG)(7 CONDR) LF 1,095.000 $3.000 $2.620 $3.000 $3.000 $2.710
687 6001 PED POLE ASSEMBLY EA 3.000 $2,500.000 $1,933.000 $3,000.000 $2,000.000 $2,211.440
688 6001 PED DETECT PUSH BUTTON (APS) EA 3.000 $750.000 $767.000 $1,500.000 $850.000 $993.590
688 6003 PED DETECTOR CONTROLLER UNIT EA 1.000 $3,500.000 $1,467.000 $2,500.000 $1,600.000 $3,653.520
1004 6001 TREE PROTECTION EA 1.000 $500.000 $500.000 $500.000 $600.000 $1,563.180
3076 6068 D-GR HMA TY-D SAC-A PG64-22(EXEMPT) TON 27.000 $125.000 $500.000 $200.000 $275.000 $316.290
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $8,000.000 $10,000.000 $10,000.000 $1.000 $7,249.020
6185 6005 TMA (MOBILE OPERATION) DAY 92.000 $200.000 $50.000 $300.000 $1.000 $362.450
6306 6007 VIVDS CABLING LF 1,110.000 $3.000 $3.000 $3.250 $1.000 $14.500
Totals: $3,924,945.25 $4,121,118.80 $4,615,200.50 $4,638,141.50 $5,139,228.99