Low bids by ACCELERATED CRITICAL PATH, INC.

Contact Information
Email:      [email protected]
Phone: 214-796-4898
Address: 5760 LEGACY DR, STE B3-513 PLANO TX 75024
Fax:      972-346-7072
Low: 4
Lost: 39
Bid: 43
Subs: 0
Win ratio: 9%
Win amount: $7,937,644
Loss amount: $159,958,053
Avg win amount: $1,984,411
Avg bid amount: $3,904,551
Control County District Estimate Highway Project Date Added Type Low bidder
0519-01-030 JOHNSON FORT WORTH $2,044,215 SH 174 STP 2020(490)HES 06/05/2020 11/15/2023 HAZARD ELIM AND SAFETY ACCELERATED CRITICAL PATH, INC.($1,837,416)
0047-18-081 GRAYSON PARIS $1,795,653 US 75 NH 2017(244) 03/05/2019 11/15/2023 REPAIR SLOPE FAILURE AND ROADWAY ACCELERATED CRITICAL PATH, INC.($1,629,373)
0092-05-051 ELLIS DALLAS $1,213,647 IH 45 STP 2019(499)MM 02/05/2019 11/15/2023 CONSTRUCT INTERS IMPRVS ACCELERATED CRITICAL PATH, INC.($1,593,213)
0092-03-050 ELLIS DALLAS $3,261,978 IH 45 C 92-3-50 06/05/2018 11/15/2023 SLOPE FAILURE REPAIR ACCELERATED CRITICAL PATH, INC.($2,877,641)