County: ELLIS Highway: IH 45 Date: 06/05/2018 (6 years ago) Engineer's Estimate: $3,261,978 Control Number: 0092-03-050
Project: C 92-3-50 District: DALLAS Time: 113 WORKING DAYS Type: SLOPE FAILURE REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,261,978.00
ACCELERATED CRITICAL PATH, INC.   $2,877,641.20 1
-11.78% | -$384,336.80
ED BELL CONSTRUCTION COMPANY   $3,038,817.26 2
-6.84% | -$223,160.74
5.6% | $161,176.06
GIBSON & ASSOCIATES, INC.   $3,098,362.90 3
-5.02% | -$163,615.10
7.67% | $220,721.70
1.96% | $59,545.64
DCI CONTRACTING, INC.   $3,751,185.19 4
15% | $489,207.19
30.36% | $873,543.99
21.07% | $652,822.29
SJ&J CONSTRUCTION, LLC   $3,943,760.00 5
20.9% | $681,782.00
37.05% | $1,066,118.80
5.13% | $192,574.81
FNH CONSTRUCTION, LLC   $4,623,325.50 6
41.73% | $1,361,347.50
60.66% | $1,745,684.30
17.23% | $679,565.50

Bid Items

Items: 56, 0 filtered
ELLIS IH 45  |  DALLAS  |  0092-03-050  |  06/05/2018  |  $3,261,978  |  C 92-3-50  |  SLOPE FAILURE REPAIR  |  113 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ACCELERATED CRITICAL PATH, INC. ED BELL CONSTRUCTION COMPANY GIBSON & ASSOCIATES, INC. DCI CONTRACTING, INC. SJ&J CONSTRUCTION, LLC FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 31.000 $8,000.000 $2,100.000 $2,600.000 $1,840.000 $3,750.540 $1,500.000 $9,500.000
104 6009 REMOVING CONC (RIPRAP) SY 2,783.000 $12.000 $8.000 $9.000 $17.250 $9.910 $30.000 $20.000
104 6022 REMOVING CONC (CURB AND GUTTER) LF 575.000 $5.000 $4.000 $9.000 $8.050 $5.980 $8.000 $12.500
104 6044 REMOVING CONC (FLUME) SY 52.000 $10.000 $19.000 $18.000 $28.750 $18.300 $40.000 $20.000
110 6001 EXCAVATION (ROADWAY) CY 7,189.000 $20.000 $6.000 $10.000 $14.950 $12.610 $12.000 $17.500
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 24,076.000 $28.000 $22.000 $21.000 $17.250 $28.760 $12.000 $22.500
161 6017 COMPOST MANUF TOPSOIL (4") SY 15,989.000 $2.000 $3.500 $1.500 $1.240 $1.220 $3.000 $2.500
162 6002 BLOCK SODDING SY 15,989.000 $3.500 $4.000 $2.750 $3.250 $3.660 $6.000 $5.000
168 6001 VEGETATIVE WATERING MG 397.000 $40.000 $35.000 $50.000 $24.670 $48.900 $20.000 $50.000
260 6002 LIME (HYDRATED LIME (SLURRY)) TON 138.000 $150.000 $150.000 $150.000 $178.250 $201.300 $250.000 $171.000
260 6026 LIME TRT (EXIST MATL)(24") SY 2,295.000 $8.000 $5.000 $3.500 $40.250 $23.310 $70.000 $11.000
400 6005 CEM STABIL BKFL CY 1,110.100 $115.000 $150.000 $90.000 $166.750 $148.040 $150.000 $225.000
400 6011 SAND BACKFILL CY 130.000 $20.000 $100.000 $60.000 $115.000 $326.150 $70.000 $65.000
402 6001 TRENCH EXCAVATION PROTECTION LF 1,201.000 $2.000 $2.000 $1.000 $11.500 $5.090 $40.000 $3.500
403 6001 TEMPORARY SPL SHORING SF 5,173.000 $26.000 $20.000 $22.000 $8.050 $25.520 $20.000 $35.000
432 6001 RIPRAP (CONC)(4 IN) CY 282.000 $400.000 $400.000 $450.000 $412.500 $425.360 $500.000 $450.000
432 6002 RIPRAP (CONC)(5 IN) CY 1,226.000 $400.000 $370.000 $450.000 $440.000 $449.700 $450.000 $550.000
432 6044 RIPRAP (CONC)(FLUME) CY 11.000 $455.000 $1,000.000 $525.000 $440.000 $579.500 $1,000.000 $1,000.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 82.000 $480.000 $600.000 $525.000 $423.500 $474.040 $600.000 $550.000
451 6031 RETROFIT RAIL (TY C221) LF 10.000 $100.000 $200.000 $350.000 $500.000 $305.000 $300.000 $185.000
462 6096 CONC BOX CULV (8 FT X 3 FT) LF 1,103.000 $260.000 $350.000 $425.000 $454.250 $473.190 $1,000.000 $800.000
464 6005 RC PIPE (CL III)(24 IN) LF 6.000 $70.000 $400.000 $160.000 $132.250 $355.440 $120.000 $95.000
464 6007 RC PIPE (CL III)(30 IN) LF 98.000 $90.000 $90.000 $162.000 $132.250 $132.510 $200.000 $105.000
464 6008 RC PIPE (CL III)(36 IN) LF 8.000 $120.000 $400.000 $400.000 $149.500 $596.580 $300.000 $150.000
465 6002 MANH (COMPL)(PRM)(48IN) EA 1.000 $3,800.000 $9,500.000 $5,000.000 $17,250.000 $5,873.080 $6,000.000 $6,500.000
465 6328 INLET (COMP)(GI)(TY D)(2 GRATE) EA 2.000 $4,500.000 $9,500.000 $2,500.000 $5,175.000 $4,406.640 $10,000.000 $5,000.000
466 6150 WINGWALL (FW - 0) (HW=3 FT) EA 1.000 $4,000.000 $11,000.000 $20,000.000 $34,500.000 $17,080.000 $8,000.000 $4,500.000
467 6270 SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C) EA 1.000 $5,000.000 $8,500.000 $18,000.000 $23,000.000 $15,067.000 $10,000.000 $12,500.000
496 6006 REMOV STR (HEADWALL) EA 1.000 $1,000.000 $1,500.000 $2,000.000 $6,095.000 $1,220.000 $1,000.000 $2,500.000
500 6001 MOBILIZATION LS 1.000 $300,000.000 $280,000.000 $275,000.000 $275,000.000 $375,272.000 $250,000.000 $450,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $20,000.000 $14,000.000 $6,750.000 $6,400.000 $6,395.450 $6,000.000 $8,500.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 180.000 $40.000 $35.000 $25.000 $32.090 $35.590 $12.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 180.000 $12.000 $10.000 $10.000 $9.340 $10.360 $6.000 $15.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 200.000 $4.500 $4.000 $5.000 $3.050 $3.380 $7.000 $15.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 6,082.000 $4.000 $4.000 $6.000 $4.070 $4.520 $8.000 $12.500
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 6,282.000 $1.000 $0.850 $1.000 $0.510 $0.570 $1.000 $5.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 1,560.000 $40.000 $45.000 $60.000 $40.000 $77.450 $40.000 $55.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 1,500.000 $33.000 $25.000 $50.000 $40.000 $64.570 $40.000 $65.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 1,560.000 $5.000 $7.000 $5.000 $15.000 $30.210 $25.000 $20.000
512 6053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 1,500.000 $7.000 $7.000 $5.000 $15.000 $31.420 $25.000 $20.000
529 6008 CONC CURB & GUTTER (TY II) LF 575.000 $25.000 $35.000 $38.000 $21.450 $29.520 $30.000 $35.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,775.000 $20.000 $25.000 $21.780 $18.400 $19.520 $28.000 $25.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $1,500.000 $1,600.000 $1,840.170 $1,725.000 $1,830.000 $1,800.000 $1,850.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,338.000 $3.000 $4.500 $3.300 $2.590 $2.750 $2.000 $3.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 1.000 $300.000 $250.000 $192.500 $230.000 $244.000 $400.000 $500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $270.000 $250.000 $330.000 $230.000 $244.000 $400.000 $1,500.000
544 6004 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 2.000 $2,400.000 $2,500.000 $2,585.000 $2,530.000 $2,684.000 $2,800.000 $2,850.000
545 6001 CRASH CUSH ATTEN (INSTL) EA 2.000 $9,000.000 $2,500.000 $9,795.870 $8,580.000 $9,268.950 $6,000.000 $15,000.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $900.000 $550.000 $603.000 $1,650.000 $854.000 $1,000.000 $5,000.000
556 6006 PIPE UNDERDRAINS (TY 6) (6") LF 1,153.000 $18.000 $30.000 $17.000 $50.600 $36.020 $60.000 $40.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 1.000 $400.000 $600.000 $399.030 $500.000 $488.000 $400.000 $650.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 20.000 $40.000 $14.000 $36.300 $28.750 $30.500 $90.000 $100.000
752 6005 TREE REMOVAL (4" - 12" DIA) EA 10.000 $200.000 $200.000 $75.000 $805.000 $366.000 $150.000 $1,000.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.000 $15,000.000 $3,500.000 $7,350.000 $6,000.000 $12,200.000 $10,000.000 $16,500.000
6185 6001 TMA (STATIONARY) EA 3.000 $10,000.000 $3,500.000 $2,500.000 $4,350.000 $6,944.240 $3,000.000 $15,000.000
6185 6003 TMA (MOBILE OPERATION) HR 400.000 $20.000 $20.000 $110.000 $20.000 $79.300 $200.000 $85.000
Totals: $3,261,978.00 $2,877,641.20 $3,038,817.26 $3,098,362.91 $3,751,185.19 $3,943,760.00 $4,623,325.50