INLET (COMPL)(CURB)(TY C1)(BOTH)(HOU)
Engineer's Estimate
Average:
$9,327.94
Maximum:
$12,400.00
Minimum:
$7,500.00
Bid Information
Average Bid:
$9,000.30
