INLET (COMPL)(CURB)(TY C1)(LEFT)(HOU)
Engineer's Estimate
Average:
$8,925.75
Maximum:
$10,500.00
Minimum:
$4,500.00
Bid Information
Average Bid:
$8,580.07
