COUNTY: HARRIS HIGHWAY: CS LENGTH: 0.6650 MI
CONTROL NUMBER: 0912-72-541 DBE GOAL: 7.5 %
PROJECT NUMBER: STP 2020(724)MM
TYPE: NEW LOCATION NON-FREEWAY
TIME FOR COMPLETION: 305 WORKING DAYS GUARANTY: 100,000.00
BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 01, 2024 * EST.COST: 13,882,975.92
BIDS WILL BE OPENED: 1:00 PM OCTOBER 01, 2024
MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION JAMAL ELAHI, P.E.
ATTN: CONSTRUCTION DIVISION - M1C3.02 702 FM 1959
6230 E. STASSNEY LANE HOUSTON, TX 77034
AUSTIN TX 78744-3147 281/464-5501
FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498
TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm
FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW:
http://www.txdot.gov/business/letting-bids/ebs.html
LIMITS FROM: NASA RD 1 BYPASS: FROM FM 528
LIMITS TO: LANDING BLVD ROUNDABOUT
--------------------------------------------------------------------------------
ITEM DES APPROXIMATE
ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES
--------------------------------------------------------------------------------
100 7002 PREPARING ROW STA 43.160
104 7001 REMOV CONC (PAV) SY 8,396.000
104 7006 REMOV CONC (RIPRAP) SY 5.000
104 7011 REMOV CONC (DRIVEWAYS) SY 175.000
104 7013 REMOV CONC (SIDEWALK, RAMP OR SUP) SY 314.000
110 7001 EXCAV (ROADWAY) CY 9,817.600
110 7002 EXCAV (CHANNEL) CY 17,175.500
132 7012 EMBANK (FNL)(DC)(TY D) CY 7,794.100
161 7002 COMPOST MANUF TOPSOIL (4") SY 37,158.000
161 7006 EROSION CONTROL COMPOST (4") SY 11,822.000
161 7011 GENERAL USE COMPOST (2") SY 1,503.000
162 7002 BLOCK SODDING SY 37,158.000
168 7001 VEGETATIVE WATERING TGL 915.000
170 7002 IRRIGATION SYSTEM (TY I) EA 1.000
170 7003 IRRIGATION SYSTEM (TY II) EA 1.000
192 7007 SOIL AMEND SY 11,822.000
192 7008 SOIL AMEND (TY I) SY 11,822.000
192 7009 PLANT BED PREP SY 11,149.000
192 7016 LANDSCAPE EDGE LF 195.000
192 7028 PLANT MATERIAL (3 GAL) EA 530.000
192 7029 PLANT MATERIAL (5 GAL) EA 400.000
192 7030 PLANT MATERIAL (15 GAL) EA 250.000
192 7031 PLANT MATERIAL (30 GAL) EA 350.000
192 7033 PLANT MATERIAL (65 GAL) EA 50.000
192 7062 PLANT MATERIAL (MIN 8' TRNK HT) EA 1,265.000
192 7085 SOIL AMEND (TY III) SY 4,200.000
192 7086 SOIL AMEND (TY IV) SY 5,479.000
192 7087 SOIL AMEND (TY V) SY 3,653.000
260 7005 LIME (COM OR QK)(SLURRY) TON 495.050
260 7007 LIME TRT (EXIST MATL)(8") SY 27,503.000
360 7094 CONC PAV (JOINT REINF) (10") SY 24,180.000
400 7010 CEM STABIL BKFL CY 9,367.000
400 7011 CEMENT STAB BACKFILL (INLET OR MH) CY 386.000
402 7001 TRENCH EXCAVATION PROTECTION LF 10,638.000
420 7022 CL C CONC (CAP) CY 1.700
432 7001 RIPRAP (CONC)(4 IN) CY 27.000
432 7002 RIPRAP (CONC)(5 IN) CY 83.000
432 7003 RIPRAP (CONC)(6 IN) CY 5.300
432 7022 RIPRAP (STONE TY R)(DRY)(8 IN) CY 153.000
462 7001 CONC BOX CULV (3 FT X 2 FT) LF 484.000
462 7027 CONC BOX CULV (9 FT X 5 FT) LF 2,280.000
464 7005 RC PIPE (CL III)(24 IN) LF 1,050.000
464 7007 RC PIPE (CL III)(30 IN) LF 103.000
464 7009 RC PIPE (CL III)(36 IN) LF 507.000
464 7010 RC PIPE (CL III)(42 IN) LF 369.000
464 7011 RC PIPE (CL III)(48 IN) LF 851.000
464 7012 RC PIPE (CL III)(54 IN) LF 193.000
465 7136 INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX5FT) EA 2.000
465 7286 JUNCT BOX (COMPL)(JB)(5FT X 5FT)(FTW) EA 2.000
465 7295 JUNCT BOX (COMPL)(JB)(7FT X 7FT)(FTW) EA 2.000
465 7312 INLET (COMPL)(CURB)(TY C1)(BOTH)(HOU) EA 16.000
465 7314 INLET (COMPL)(TY AD)(HOU) EA 4.000
465 7320 MANH (COMPL)(TY A)(HOU) EA 9.000
466 7147 WINGWALL (FW - 0) (HW=5 FT) EA 5.000
466 7176 WINGWALL (PW - 1) (HW=6 FT) EA 1.000
467 7322 SET (TY II) (24 IN) (CMP) (4: 1) (C) EA 4.000
479 7001 ADJUSTING MANHOLES EA 2.000
496 7002 REMOV STR (INLET) EA 5.000
496 7003 REMOV STR (MANHOLE) EA 6.000
496 7007 REMOV STR (PIPE) LF 1,486.000
500 7001 MOBILIZATION LS 1.000
502 7001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 20.000
506 7002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 445.000
506 7011 ROCK FILTER DAMS (REMOVE) LF 445.000
506 7020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 312.000
506 7024 CONSTRUCTION EXITS (REMOVE) SY 312.000
506 7039 TEMP SEDMT CONT FENCE (INSTALL) LF 4,038.000
506 7041 TEMP SEDMT CONT FENCE (REMOVE) LF 4,038.000
506 7042 BIODEG EROSN CONT LOGS (INSTL) (6") LF 544.000
506 7046 BIODEG EROSN CONT LOGS (REMOVE) LF 544.000
508 7001 CONSTRUCTING DETOURS SY 342.000
529 7006 CONC CURB (MONO) (TY I) LF 327.000
529 7007 CONC CURB (MONO) (TY II) LF 14,893.000
530 7006 DRIVEWAYS (CONC) SY 416.000
531 7003 CONC SIDEWALKS (6") SY 4,774.000
531 7005 CURB RAMPS (TY 1) EA 2.000
531 7011 CURB RAMPS (TY 10) EA 1.000
531 7013 CURB RAMPS (TY 21) EA 1.000
618 7054 CONDT (PVC) (SCH 80) (2") LF 6,828.000
618 7055 CONDT (PVC) (SCH 80) (2") (BORE) LF 391.000
624 7008 GROUND BOX TY D (162922)W/APRON EA 28.000
644 7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 22.000
662 7066 WK ZN PAV MRK REMOV (W)6"(DOT) LF 235.000
662 7068 WK ZN PAV MRK REMOV (W)6"(SLD) LF 1,465.000
662 7099 WK ZN PAV MRK REMOV (Y)6"(DOT) LF 378.000
662 7100 WK ZN PAV MRK REMOV (Y)6"(SLD) LF 8,285.000
666 7236 RE PM TY III (W)(6")(SLD) LF 1,174.000
666 7237 RE PM TY III (W)(6")(BRK) LF 1,605.000
666 7238 RE PM TY III (W)(6")(DOT) LF 510.000
666 7239 RE PM TY III (W)(8")(SLD) LF 378.000
666 7241 RE PM TY III (W)(8")(DOT) LF 164.000
666 7242 RE PM TY III (W)(12")(SLD) LF 66.000
666 7244 RE PM TY III (W)(24")(SLD) LF 134.000
666 7248 RE PM TY III (Y)(6")(SLD) LF 6,504.000
666 7252 RE PM TY III (Y)(12")(SLD) LF 216.000
666 7254 RE PM TY III (W)(ARROW) EA 6.000
666 7257 RE PM TY III (W)(WORD) EA 10.000
666 7259 RE PM TY III (W)(18" YLD TRI) EA 24.000
672 7002 REFL PAV MRKR TY I-C EA 79.000
677 7001 ELIM EXT PM & MRKS (4") LF 321.000
678 7002 PAV SURF PREP FOR MRK (6") LF 9,793.000
678 7004 PAV SURF PREP FOR MRK (8") LF 542.000
678 7006 PAV SURF PREP FOR MRK (12") LF 282.000
678 7008 PAV SURF PREP FOR MRK (24") LF 134.000
678 7009 PAV SURF PREP FOR MRK (ARROW) EA 6.000
678 7016 PAV SURF PREP FOR MRK (WORD) EA 10.000
678 7022 PAV SURF PREP FOR MRK (18")(YLD TRI) EA 24.000
752 7005 TREE REMOVAL (4" - 12" DIA) EA 23.000
7004 7007 WATER MAIN PIPE (PVC)(C900)(12 IN) LF 3,327.000
7004 7011 WTR MAIN PIPE (PVC)(RESTRAINED JT)12IN LF 501.000
7004 7019 JCK TUN BOR AUG CASING (STL)(24 IN) LF 197.000
7004 7023 CASING STEEL (20 IN) LF 501.000
7004 7030 FIRE HYDRANT ASSEMBLY EA 13.000
7004 7034 GATE VALVE (12 IN) EA 4.000
7004 7040 TAPPING SLEEVE & VALVE (12IN X 12IN) EA 1.000
7004 7041 AIR RELEASE/VAC RELEASE VALVE (2IN) EA 6.000
7004 7047 WET CONNECTION (12 IN) EA 2.000
7006 7017 REMOVE EXIST SAN SWR PIPE (10 IN) LF 119.000
7006 7031 SANITARY SEWER (PVC)(SDR26)(15 IN) LF 2,966.000
7006 7039 MANHOLE (SAN SWR)(4 FT DIA) EA 10.000
7006 7040 SAN SWR CONNECTION TO EXIST MANHOLE EA 1.000
7006 7041 BYPASS PUMPING LS 1.000
7006 7042 REMOVE EXIST SAN SWR PIPE (4 IN) LF 106.000
* INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
CONTRACTOR FORCE ACCOUNT WORK $79,950.53