COUNTY: TARRANT HIGHWAY: IH0030 LENGTH: 0.01 MI
CONTROL NUMBER: 6464-52-001 SBE GOAL: 0.0 %
PROJECT NUMBER: RMC - 646452001
TYPE: FLEXIBLE PAVEMENT STRUCTURE REPAIR
TIME FOR COMPLETION: 365 CALENDAR DAYS GUARANTY: 90,000.00
BIDS RECEIVED UNTIL: 1:00 PM JULY 09, 2024 EST.COST: 4,497,963.94
BIDS WILL BE OPENED: 1:00 PM JULY 09, 2024
MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION MARIBEL RANGEL
ATTN: CONSTRUCTION DIVISION - M1C3.02 2540 EDGECLIFF ROAD
6230 E. STASSNEY LANE FORT WORTH, TX 76133
AUSTIN TX 78744-3147 817/370-6637
FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498
TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm
FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW:
http://www.txdot.gov/business/letting-bids/ebs.html
LIMITS FROM: VARIOUS LOCATIONS IN
LIMITS TO: SOUTH TARRANT COUNTY
--------------------------------------------------------------------------------
ITEM DES APPROXIMATE
ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES
--------------------------------------------------------------------------------
134 6006 BACKFILL (TY A) LF 2,000.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 1,875.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 1,000.000
351 6006 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") SY 1,000.000
351 6008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 1,000.000
354 6003 PLAN & TEXT ASPH CONC PAV(0" TO 3") SY 147,135.740
500 6033 MOBILIZATION (CALLOUT) EA 8.000
500 6034 MOBILIZATION (EMERGENCY) EA 1.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 6,500.000
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 19,500.000
3077 6027 SP MIXES SP-C SAC-A PG70-28 TON 16,787.600
3077 6075 TACK COAT GAL 29,427.150
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000
6185 6002 TMA (STATIONARY) DAY 175.000
7329 6001 MAINTENANCE SPEED LIMIT SIGNING EA 25.000