COUNTY: FRANKLIN HIGHWAY: IH 30 LENGTH: 0.14 MI
CONTROL NUMBER: 0610-02-065 DBE GOAL: 0.0 %
PROJECT NUMBER: F 2B24(422)
TYPE: BRIDGE MAINTENANCE
TIME FOR COMPLETION: 61 WORKING DAYS GUARANTY: 15,000.00
BIDS RECEIVED UNTIL: 1:00 PM JULY 10, 2024 * EST.COST: 731,922.00
BIDS WILL BE OPENED: 1:00 PM JULY 10, 2024
MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION JESSE HERRERA
ATTN: CONSTRUCTION DIVISION - M1C3.02 1100 HILLCREST DRIVE ON S
6230 E. STASSNEY LANE SULPHUR SPRINGS, TX 75482
AUSTIN TX 78744-3147 903/885-4031
FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498
TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm
FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW:
http://www.txdot.gov/business/letting-bids/ebs.html
LIMITS FROM: AT CR 2080
LIMITS TO: .
--------------------------------------------------------------------------------
ITEM DES APPROXIMATE
ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES
--------------------------------------------------------------------------------
106 6002 OBLITERATING ABANDONED ROAD SY 1,350.000
132 6019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 100.000
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 1,400.000
168 6001 VEGETATIVE WATERING MG 9.000
401 6001 FLOWABLE BACKFILL CY 20.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 50.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 20.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000
500 6001 MOBILIZATION LS 1.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 250.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 250.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,500.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,500.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 50.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 850.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 2.000
542 6006 MTL BM GD FEN (REMOVE & REINSTALL) LF 100.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 7.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 8.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 100.000
6185 6002 TMA (STATIONARY) DAY 100.000
* INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $19,854.60