COUNTY: REFUGIO HIGHWAY: US 77 LENGTH: 0 MI
CONTROL NUMBER: 0371-03-137 DBE GOAL: 0.0 %
PROJECT NUMBER: STP 2B24(151)HES
TYPE: SAFETY IMPROVEMENT PROJECTS
TIME FOR COMPLETION: 120 WORKING DAYS GUARANTY: 71,000.00
BIDS RECEIVED UNTIL: 1:00 PM JUNE 06, 2024 * EST.COST: 3,555,675.00
BIDS WILL BE OPENED: 1:00 PM JUNE 06, 2024
MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION FIDENCIO LOPEZ
ATTN: CONSTRUCTION DIVISION - M1C3.02 US 181
6230 E. STASSNEY LANE SINTON, TX 78387
AUSTIN TX 78744-3147 361/364-6402
FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498
TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm
FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW:
http://www.txdot.gov/business/letting-bids/ebs.html
LIMITS FROM: 1.95 MILES N. OF US 183
LIMITS TO: 0.75 MI N OF SAN PATRICIO (C/L)
--------------------------------------------------------------------------------
ITEM DES APPROXIMATE
ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES
--------------------------------------------------------------------------------
134 6004 BACKFILL (TY A OR B) STA 431.000
164 6036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 10.000
166 6001 FERTILIZER AC 10.000
168 6001 VEGETATIVE WATERING MG 1,900.000
432 6046 RIPRAP (MOW STRIP)(5 IN) CY 2,060.000
500 6001 MOBILIZATION LS 1.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,120.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,120.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3,430.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,430.000
514 6017 PERM CONC TRF BARR (SGL SLP) (TY 1 SPL) LF 1,290.000
543 6002 CABLE BARRIER SYSTEM (TL-4) LF 40,325.000
543 6020 CABLE BARRIER TERMINAL SECTION (TL-4) EA 54.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 1.000
658 6027 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) EA 14.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 120.000
6185 6002 TMA (STATIONARY) DAY 240.000
6185 6005 TMA (MOBILE OPERATION) DAY 120.000
* INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $25,000.00