COUNTY: BELL HIGHWAY: FM 1123 LENGTH: 0.0410 MI
CONTROL NUMBER: 1308-01-025, ETC DBE GOAL: 6.0 %
PROJECT NUMBER: BR 2024(990)
TYPE: BRIDGE REPLACEMENT
TIME FOR COMPLETION: 255 WORKING DAYS GUARANTY: 100,000.00
BIDS RECEIVED UNTIL: 1:00 PM MAY 02, 2024 * EST.COST: 6,260,469.40
BIDS WILL BE OPENED: 1:00 PM MAY 02, 2024
MAIL OR DELIVER BIDS TO: FOR PS&E PACKAGE QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION MICHAEL YATES
ATTN: CONSTRUCTION DIVISION - RM M1C3.02 3502 E MAIN
6230 E. STASSNEY LANE GATESVILLE, TX 76528
AUSTIN TX 78744-3147 254/939-3778
FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498
TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm
FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW:
http://www.txdot.gov/business/letting-bids/ebs.html
------------------------------------------------------------------------------
COUNTY CONTROL LIMITS FROM
HIGHWAY PROJECT LIMITS TO
------------------------------------------------------------------------------
BELL 1308-01-025 @ CATHEY CREEK
FM 1123 BR 2024(990) (STR #005)
LENGTH: 0.0140 MILES
BELL 1308-01-027 @ MOON BRANCH
FM 1123 BR 2024(990) (STR #003)
LENGTH: 0.0090 MILES
BELL 1308-01-028 @ RUNNELLS CREEK
FM 1123 BR 2024(990) (STR #004)
LENGTH: 0.0180 MILES
--------------------------------------------------------------------------------
ITEM DES APPROXIMATE
ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES
--------------------------------------------------------------------------------
100 6002 PREPARING ROW STA 20.160
105 6075 REMOV STAB BASE AND ASPH PAV (10"-18") SY 5,319.000
105 6128 REMOVING UNTREATED BASE (8") SY 175.000
110 6001 EXCAVATION (ROADWAY) CY 329.000
110 6002 EXCAVATION (CHANNEL) CY 500.000
132 6047 EMBANKMENT (FINAL)(ORD COMP)(TY C1) CY 1,333.000
132 6056 EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS) CY 330.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 3,588.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 3,588.000
164 6071 BROADCAST SEED (TEMP)(WARM OR COOL) SY 1,795.000
168 6001 VEGETATIVE WATERING MG 87.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 300.000
247 6392 FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS) CY 2,042.000
314 6005 EMULS ASPH (BS OR SUBGR TRT)(CSS-1H) GAL 1,306.000
316 6024 ASPH (CRS-2P) GAL 2,285.000
316 6397 AGGR(TY-D GR-4 OR TY-L GR-4) CY 49.000
400 6001 STRUCT EXCAV CY 41.000
400 6005 CEM STABIL BKFL CY 792.000
403 6001 TEMPORARY SPL SHORING SF 1,805.000
416 6002 DRILL SHAFT (24 IN) LF 1,095.000
416 6003 DRILL SHAFT (30 IN) LF 1,005.000
420 6014 CL C CONC (ABUT)(HPC) CY 75.100
420 6030 CL C CONC (CAP)(HPC) CY 64.000
420 6038 CL C CONC (COLUMN)(HPC) CY 29.600
422 6007 REINF CONC SLAB (SLAB BEAM) SF 13,751.000
422 6015 APPROACH SLAB CY 229.100
423 6005 RETAINING WALL (SPREAD FOOTING) SF 3,921.000
425 6009 PRESTR CONC SLAB BEAM (4SB12) LF 590.940
425 6010 PRESTR CONC SLAB BEAM (5SB12) LF 1,181.880
425 6011 PRESTR CONC SLAB BEAM (4SB15) LF 370.440
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 740.880
432 6001 RIPRAP (CONC)(4 IN) CY 4.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 61.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 4,432.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 74.000
450 6006 RAIL (TY T223) LF 1,265.800
454 6004 ARMOR JOINT (SEALED) LF 238.000
464 6003 RC PIPE (CL III)(18 IN) LF 260.000
464 6005 RC PIPE (CL III)(24 IN) LF 452.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 6.000
467 6389 SET (TY II) (24 IN) (RCP) (3: 1) (P) EA 2.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000
496 6004 REMOV STR (SET) EA 10.000
496 6007 REMOV STR (PIPE) LF 254.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 2.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000
500 6001 MOBILIZATION LS 1.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 17.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 443.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 443.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 4,084.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 4,084.000
530 6002 INTERSECTIONS (ACP) SY 135.000
530 6005 DRIVEWAYS (ACP) SY 140.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 3,102.000
533 6002 RUMBLE STRIPS (CENTERLINE) LF 1,551.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 487.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 12.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000
552 6003 WIRE FENCE (TY C) LF 265.000
552 6008 WIRE FENCE (WATER GAP) LF 45.000
556 6006 PIPE UNDERDRAINS (TY 6) (6") LF 120.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 1.000
560 6005 MAILBOX INSTALL-D (TWG-POST) TY 2 EA 2.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000
644 6076 REMOVE SM RD SN SUP&AM EA 2.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 14.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 17.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 4.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 17.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 4,080.000
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 360.000
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 1,186.000
672 6009 REFL PAV MRKR TY II-A-A EA 33.000
3077 6075 TACK COAT GAL 653.000
3077 6081 SP MIXES SP-C SAC-B PG70-22 (EXEMPT) TON 1,428.000
4201 6001 REMOVE AND RE-LAY EXISTING STONE RIPRAP CY 50.000
5000 6002 GEOGRID REINFORCE EMBANKMENTS (TY B) SY 300.000
5132 6001 LEAD CONTAINING COATING MANAGEMENT SF 360.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 6.000
6185 6003 TMA (MOBILE OPERATION) HR 36.000
* INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $60,000.00
Total Bid Amount _______________________________
____________________________________ certifies that the unit prices shown on this completed computer
print-out for all of the bid items, alternate items, option items, and add alternate items contained in this
proposal are the unit prices intended and that its bid will be tabulated using these unit prices and no other
information from this print-out.
____________________________________ acknowledges and agrees that the total bid amount shown will be read as
its total bid and further agree that the official total bid amount will be determined by multiplying the unit
bid prices shown in this print-out by the respective estimated quantities shown in the proposal and then
totaling all of the extended amounts.
Signed ______________________________________________
Title ______________________________________________
Date ______________________________________________
Additional Signature for Joint Venture:
Signed ______________________________________________
Title ______________________________________________
Date ______________________________________________