COUNTY: HARRIS, ETC HIGHWAY: IH 10, ETC LENGTH: 92.7730 MI
CONTROL NUMBER: 0508-01-394, ETC SBE GOAL: 0.0 %
PROJECT NUMBER: C 508-1-394, ETC
TYPE: LANDSCAPE & SCENIC ENHANCEMENT
TIME FOR COMPLETION: 120 WORKING DAYS GUARANTY: 44,000.00
BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 01, 2024 EST.COST: 2,207,938.28
BIDS WILL BE OPENED: 1:00 PM FEBRUARY 01, 2024
MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION PHILLIP GARLIN
ATTN: CONSTRUCTION DIVISION - M1C3.02 16803 EASTEX FREEWAY
6230 E. STASSNEY LANE HUMBLE, TX 77347
AUSTIN TX 78744-3147 281/319-6451
FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498
TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm
FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW:
http://www.txdot.gov/business/letting-bids/ebs.html
------------------------------------------------------------------------------
COUNTY CONTROL LIMITS FROM
HIGHWAY PROJECT LIMITS TO
------------------------------------------------------------------------------
HARRIS 0508-01-394 IH 45
IH 10 C 508-1-394 CHAMBERS COUNTY LINE
LENGTH: 28.1480 MILES
HARRIS 0028-02-110 IH 10
US 90 C 28-2-110 KRENEK ROAD
LENGTH: 15.3230 MILES
MONTGOMERY 0177-05-127 FOSTORIA ROAD
IH 69 C 177-5-127 HARRIS COUNTY LINE
LENGTH: 17.4620 MILES
HARRIS 0177-06-095 MONTGOMERY COUNTY LINE
IH 69 C 177-6-95 FM 1960
LENGTH: 2.6320 MILES
HARRIS 0177-07-125 FM 1960
IH 69 C 177-7-125 EAST CROSSTIMBERS STREET
LENGTH: 10.1980 MILES
HARRIS 0177-11-163 EAST CROSSTIMBERS STREET
IH 69 C 177-11-163 IH 10
LENGTH: 1.8790 MILES
HARRIS 0271-14-247 US 290
IH 610 C 271-14-247 IH 10 EAST
LENGTH: 13.0720 MILES
HARRIS 0271-15-103 IH 10 EAST
IH 610 C 271-15-103 BUFFALO BAYOU
LENGTH: 2.6240 MILES
HARRIS 0376-01-015 AT THE SAN JACINTO MONUMENT
PR 1836 C 376-1-15 .
LENGTH: 0.01 MILES
HARRIS 2483-01-016 EAST CROSSTIMBERS STREET
SS 548 C 2483-1-16 IH 610
LENGTH: 1.4250 MILES
--------------------------------------------------------------------------------
ITEM DES APPROXIMATE
ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES
--------------------------------------------------------------------------------
100 6013 PREP ROW (TREE) (2" TO 12" DIA) EA 114.000
160 6005 FURNISHING AND PLACING TOPSOIL CY 12.000
161 6009 EROSION CONTROL COMPOST CY 2,169.000
161 6012 GENERAL USE COMPOST CY 1,055.000
162 6002 BLOCK SODDING SY 45.000
166 6001 FERTILIZER AC 0.010
168 6001 VEGETATIVE WATERING MG 1.000
192 6003 PLANT MATERIAL (3-GAL) EA 2,261.000
192 6023 PLANT MATERIAL (15 GAL) (TREE) EA 238.000
192 6028 PLANT MATERIAL (1 GAL) (SHRUB) EA 492.000
192 6065 PLANT BED PREP (TYPE III) SY 19,780.000
193 6001 PLANT MAINTENANCE MO 19.000
193 6002 PLANT MAINTENANCE CYC 6.000
500 6001 MOBILIZATION LS 1.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 1,048.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 1,048.000
730 6107 FULL - WIDTH MOWING CYC 6.000
1006 6001 LANDSCAPE SOIL AMENDMENT (TYPE I) SY 19,780.000
1006 6002 LANDSCAPE SOIL AMENDMENT (TYPE II) SY 19,780.000
1006 6003 LANDSCAPE SOIL AMENDMENT (TYPE III) SY 2,499.000
1006 6004 LANDSCAPE SOIL AMENDMENT (TYPE IV) SY 12,495.000
1006 6005 LANDSCAPE SOIL AMENDMENT (TYPE V) SY 2,991.000
1022 6003 LANDSCAPE TREATMENT(TY 3) EA 1.000
1022 6004 LANDSCAPE TREATMENT(TY 4) EA 2.000
1022 6005 LANDSCAPE TREATMENT (TY 5) EA 1.000
1022 6006 LANDSCAPE TREATMENT (TY 6) EA 1.000
1022 6007 LANDSCAPE TREATMENT (TY 7) EA 1.000
1022 6008 LANDSCAPE TREATMENT (TY 8) EA 1.000
1022 6010 LANDSCAPE TREATMENT (TY 10) EA 1.000
6185 6002 TMA (STATIONARY) DAY 45.000
6185 6005 TMA (MOBILE OPERATION) DAY 60.000