COUNTY: BOWIE HIGHWAY: US 259 LENGTH: 8.2300 MI
CONTROL NUMBER: 0085-02-054, ETC SBE GOAL: 0.0 %
PROJECT NUMBER: C 85-2-54, ETC
TYPE: REHABILITATION OF EXISTING ROAD
TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR ** GUARANTY: 100,000.00
BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 01, 2024 EST.COST: 19,096,877.65
BIDS WILL BE OPENED: 1:00 PM FEBRUARY 01, 2024
MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION THOMAS BRUCE
ATTN: CONSTRUCTION DIVISION - M1C3.02 701 EAST MAIN ST
6230 E. STASSNEY LANE ATLANTA, TX 75551
AUSTIN TX 78744-3147 903/799-1339
FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498
TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm
FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW:
http://www.txdot.gov/business/letting-bids/ebs.html
------------------------------------------------------------------------------
COUNTY CONTROL LIMITS FROM
HIGHWAY PROJECT LIMITS TO
------------------------------------------------------------------------------
BOWIE 0085-02-054 2.3 MI S OF FM 561
US 259 C 85-2-54 FM 561
LENGTH: 2.3750 MILES
BOWIE 0085-02-055 FM 561
US 259 C 85-2-55 0.03 MI S OF CR 4243
LENGTH: 2.4340 MILES
BOWIE 0085-02-056 WARD CREEK
US 259 C 85-2-56 0.1 MI S OF CR 4243
LENGTH: 3.4210 MILES
--------------------------------------------------------------------------------
ITEM DES APPROXIMATE
ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES
--------------------------------------------------------------------------------
100 6002 PREPARING ROW STA 431.110
105 6172 REMOVING STAB BASE & ASPH PAV (11.5") SY 147,972.000
132 6017 EMBANKMENT (VEHICLE)(ORD COMP)(TY A) CY 236.000
134 6001 BACKFILL (TY A) STA 429.590
150 6001 BLADING STA 429.590
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 143,401.000
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 35,850.000
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 35,850.000
168 6001 VEGETATIVE WATERING MG 2,292.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 31,981.000
275 6001 CEMENT TON 4,644.000
275 6009 CEMENT TREAT (NEW BASE) (8") SY 143,198.000
275 6011 CEMENT TREAT(EXIST MATL)(8") SY 147,972.000
310 6021 PRIME COAT & BLOTTER (MC-30) GAL 36,994.000
316 6017 ASPH (AC-20-5TR) GAL 53,270.000
316 6409 AGGR (TY-B GR-4) CY 1,024.000
354 6023 PLANE ASPH CONC PAV(0" TO 4") SY 3,280.000
400 6007 CUT & RESTORE CONC PAVING SY 34.000
429 6009 CONC STR REPAIR (STANDARD) SF 20.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 243.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 186.000
451 6004 RETROFIT RAIL (TY T131RC) LF 340.000
464 6003 RC PIPE (CL III)(18 IN) LF 224.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 16.000
496 6004 REMOV STR (SET) EA 8.000
496 6007 REMOV STR (PIPE) LF 112.000
500 6001 MOBILIZATION LS 1.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 2.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 200.000
512 6025 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 200.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 200.000
530 6008 TURNOUTS (ACP) SY 1,720.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 17,245.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 3,900.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 350.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 4,250.000
542 6005 RM MTL BM GD FEN TRANS (T101) EA 4.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 24.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 24.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 2.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000
560 6001 MAILBOX INSTALL-S (TWG-POST) TY 1 EA 27.000
560 6003 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 1.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 2.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 36.000
644 6076 REMOVE SM RD SN SUP&AM EA 41.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 87,468.000
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 8,030.000
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 84,918.000
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 100.000
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 24.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 4.000
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 4,296.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 20.000
672 6009 REFL PAV MRKR TY II-A-A EA 2,160.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 4,400.000
3077 6064 SP MIXES SP-D PG76-22 TON 15,320.000
3077 6075 TACK COAT GAL 16,375.000
3080 6007 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 TON 14,754.000
3080 6029 TACK COAT GAL 16,094.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 3,420.000
6056 6002 PREFORMED CENTERLINE RUMBLE STRIP LF 8,622.000
6086 6001 PORTABLE TRAFFIC SIGNAL MO 6.000
6149 6004 REFL PAV MRK AWT (W) 6" (SLD) (100MIL) LF 86,362.000
6149 6010 REFL PAV MRK AWT (Y) 6" (SLD) (100MIL) LF 61,221.000
6149 6011 REFL PAV MRK AWT (Y) 6" (BRK) (100MIL) LF 6,920.000
6185 6002 TMA (STATIONARY) DAY 482.000
6185 6005 TMA (MOBILE OPERATION) DAY 16.000
ROAD USER COST
800 6001 NO. OF WORKING DAYS $/D 24,588.000 73
** THE NO. OF WORKING DAYS OF 238.000 WILL BE USED ONLY FOR
BID COMPARISON AND AS A DEDUCTION OR AS A CREDIT IN ACCORDANCE WITH
ITEM 8. THE ESTIMATED COST OF THIS CONTRACT DOES NOT INCLUDE THIS COST.