COUNTY: EASTLAND HIGHWAY: IH0020 LENGTH: 0.01 MI
CONTROL NUMBER: 6460-68-001 SBE GOAL: 0.0 %
PROJECT NUMBER: RMC - 646068001
TYPE: METAL BEAM GUARD FENCE REPAIR
TIME FOR COMPLETION: 100 WORKING DAYS GUARANTY: 19,000.00
BIDS RECEIVED UNTIL: 1:00 PM JANUARY 04, 2024 EST.COST: 967,885.49
BIDS WILL BE OPENED: 1:00 PM JANUARY 04, 2024
MAIL OR DELIVER BIDS TO: FOR PS&E PACKAGE QUESTIONS CALL:
TEXAS DEPARTMENT OF TRANSPORTATION CASEY MCGEE
ATTN: CONSTRUCTION DIVISION - RM M1C3.02 2495 HWY 183 N
6230 E. STASSNEY LANE BROWNWOOD, TX 76802
AUSTIN TX 78744-3147 325/643-0417
FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498
TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm
FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW:
http://www.txdot.gov/business/letting-bids/ebs.html
LIMITS FROM: EASTLAND COUNTY
LIMITS TO: EASTLAND COUNTY
--------------------------------------------------------------------------------
ITEM DES APPROXIMATE
ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES
--------------------------------------------------------------------------------
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 2.000
500 6033 MOBILIZATION (CALLOUT) EA 8.000
529 6043 CONC CURB (TY II)(PRECAST)(RT) EA 4.000
529 6044 CONC CURB (TY II)(PRECAST)(LT) EA 4.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,250.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 2,500.000
540 6005 TERMINAL ANCHOR SECTION EA 4.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000
540 6008 MTL BEAM GD FEN TRANS (T101) EA 2.000
540 6014 SHORT RADIUS LF 75.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 8.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 10.000
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 2.000
540 6039 MTL BM GD FEN TRANS (31"-28")(25') EA 20.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,500.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 8.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 8.000
544 6008 GUARDRAIL END TRTMNT(RETRO)(STEEL POST) EA 2.000
544 6009 GUARDRAIL END TRTMNT(RETRO)(WOOD POST) EA 2.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 2,500.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 19.000
770 6005 REM/REPAIR RAIL ELEMENT (CURVED RAIL) LF 75.000
770 6012 REM / REPL TIMBER POST W / O CONC FND EA 300.000
770 6013 REM / REPL STEEL POST W / O CONC FND EA 125.000
770 6014 REM / REPL TIMBER POST W / CONC FND EA 5.000
770 6015 REM / REPL STEEL POST W / CONC FND EA 30.000
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 8.000
770 6017 REALIGN POSTS EA 100.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 75.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 500.000
770 6025 REPLACE HINGED TOP SGT STEEL POST EA 4.000
770 6026 RESET HINGED TOP SGT STL POST EA 4.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 75.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 19.000
770 6029 REM & RESET SGT IMPACT HEAD EA 19.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 20.000
770 6031 REPLACE SGT CABLE ANCHOR EA 20.000
770 6032 REPLACE SGT STRUT EA 15.000
770 6033 REPLACE SGT OBJECT MARKER EA 4.000
770 6060 REMOVE AND REPLACE DAT EA 4.000
770 6062 REPLACE SINGLE GDRAIL TERM POST(WOOD) EA 38.000
770 6063 REPLACE SINGLE GDRAIL TERM POST(STEEL) EA 38.000
771 6001 REPLACE POSTS (TL-3) EA 750.000
771 6002 REPLACE POSTS (TL-4) EA 150.000
771 6003 CABLE SPLICE / TURNBUCKLE (TL-3) EA 5.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 2.000
771 6007 REPR OR REPLC CABLE BARR TERM SEC(TL-3) EA 15.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 5.000
771 6009 REPLACE CABLE (TL-3) LF 10.000
771 6012 REPLACE POST HARDWARE (TL-4) EA 100.000
771 6017 REP POST HARDWARE(TL-3)(TY SPECIFIED) EA 200.000
776 6011 REP METAL POST W/ BASE PLATE(T101 RAIL) EA 2.000
776 6014 REP METAL POST W/ BASE PLATE (T6 RAIL) EA 2.000
776 6021 REPAIR (TY T1 - 101R) LF 20.000
776 6041 REPAIR (STEEL RAIL) LF 19.000
6185 6002 TMA (STATIONARY) DAY 98.000
Total Bid Amount _______________________________
____________________________________ certifies that the unit prices shown on this completed computer
print-out for all of the bid items, alternate items, option items, and add alternate items contained in this
proposal are the unit prices intended and that its bid will be tabulated using these unit prices and no other
information from this print-out.
____________________________________ acknowledges and agrees that the total bid amount shown will be read as
its total bid and further agree that the official total bid amount will be determined by multiplying the unit
bid prices shown in this print-out by the respective estimated quantities shown in the proposal and then
totaling all of the extended amounts.
Signed ______________________________________________
Title ______________________________________________
Date ______________________________________________
Additional Signature for Joint Venture:
Signed ______________________________________________
Title ______________________________________________
Date ______________________________________________