PREPARING ROW
|
STA
|
86.690
|
$500.000
|
$150.000
|
$350.000
|
$74.160
|
$150.000
|
$121.000
|
$605.000
|
$500.000
|
|
|
PREP ROW (TREE) (2" TO 12" DIA)
|
EA
|
11.000
|
$195.000
|
$325.000
|
$2,500.000
|
$1,179.260
|
$2,000.000
|
$965.000
|
$1,300.000
|
$1,000.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
183.000
|
$5.500
|
$23.000
|
$30.000
|
$10.070
|
$20.000
|
$25.000
|
$14.000
|
$29.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
SY
|
180.000
|
$1,000.000
|
$87.000
|
$20.000
|
$10.240
|
$300.000
|
$40.000
|
$86.000
|
$29.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,332.000
|
$4.000
|
$5.000
|
$8.000
|
$2.600
|
$15.000
|
$7.000
|
$7.400
|
$5.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
33,452.000
|
$6.500
|
$6.500
|
$6.500
|
$7.030
|
$2.600
|
$6.000
|
$3.400
|
$6.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (5"-8")
|
SY
|
42,669.000
|
$3.500
|
$3.700
|
$3.000
|
$3.560
|
$3.500
|
$4.000
|
$3.800
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
27,942.000
|
$15.000
|
$8.500
|
$10.000
|
$12.090
|
$15.000
|
$10.000
|
$12.000
|
$11.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
SY
|
170,659.000
|
$6.500
|
$1.500
|
$2.500
|
$2.390
|
$2.000
|
$6.000
|
$5.200
|
$4.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,304.000
|
$12.000
|
$6.500
|
$10.000
|
$5.300
|
$15.000
|
$15.000
|
$31.000
|
$5.000
|
|
|
BACKFILL (TY B)
|
STA
|
1,584.500
|
$250.000
|
$260.000
|
$110.000
|
$67.250
|
$100.000
|
$70.000
|
$240.000
|
$53.000
|
|
|
BLADING
|
STA
|
1,584.500
|
$100.000
|
$130.000
|
$110.000
|
$54.020
|
$30.000
|
$15.000
|
$170.000
|
$200.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
277.000
|
$650.000
|
$330.000
|
$700.000
|
$361.200
|
$513.250
|
$455.000
|
$350.000
|
$500.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
277.000
|
$570.000
|
$310.000
|
$700.000
|
$376.900
|
$421.110
|
$375.000
|
$330.000
|
$400.000
|
|
|
VEGETATIVE WATERING
|
MG
|
3,000.000
|
$30.000
|
$35.000
|
$20.000
|
$45.470
|
$35.230
|
$32.000
|
$33.500
|
$32.000
|
|
|
PROOF ROLLING
|
HR
|
19.000
|
$100.000
|
$130.000
|
$80.000
|
$101.330
|
$175.000
|
$200.000
|
$165.000
|
$95.000
|
|
|
FL BS (RDWY DEL) (TY A GR 4) (2.25")
|
SY
|
49,191.000
|
$5.000
|
$3.500
|
$4.300
|
$2.570
|
$3.610
|
$3.000
|
$3.250
|
$5.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(7")
|
SY
|
1,273.000
|
$12.000
|
$13.200
|
$21.000
|
$15.270
|
$15.000
|
$58.000
|
$22.000
|
$14.500
|
|
|
REWORK BS MTL (TY C)(5")(DENS CONT)
|
SY
|
3,921.000
|
$8.500
|
$1.500
|
$4.000
|
$15.110
|
$6.000
|
$52.000
|
$5.550
|
$4.000
|
|
|
CEMENT
|
TON
|
623.510
|
$140.000
|
$190.000
|
$165.000
|
$142.800
|
$150.000
|
$160.000
|
$180.000
|
$275.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(8")
|
SY
|
55,418.000
|
$2.500
|
$3.500
|
$2.500
|
$2.560
|
$3.000
|
$3.000
|
$2.550
|
$4.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
29,095.000
|
$4.500
|
$3.800
|
$4.500
|
$4.040
|
$5.000
|
$4.000
|
$5.000
|
$5.250
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
239,538.000
|
$3.000
|
$3.500
|
$3.500
|
$3.370
|
$3.100
|
$3.000
|
$3.450
|
$3.500
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
47,820.000
|
$3.000
|
$3.700
|
$3.000
|
$3.400
|
$3.130
|
$4.000
|
$3.900
|
$3.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
14,556.000
|
$2.500
|
$3.700
|
$3.500
|
$3.940
|
$3.860
|
$4.000
|
$4.950
|
$4.250
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
27.000
|
$200.000
|
$135.000
|
$450.000
|
$655.880
|
$176.930
|
$255.000
|
$300.000
|
$260.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
322.000
|
$150.000
|
$135.000
|
$120.000
|
$217.850
|
$176.960
|
$180.000
|
$255.000
|
$185.000
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
42,670.000
|
$90.000
|
$90.000
|
$110.000
|
$106.700
|
$120.000
|
$113.000
|
$115.000
|
$94.000
|
|
|
D-GR HMA TY-C SAC-B PG70-28
|
TON
|
44,116.000
|
$80.000
|
$95.000
|
$108.000
|
$115.320
|
$115.000
|
$119.000
|
$115.000
|
$103.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
|
TON
|
117,853.000
|
$110.000
|
$110.000
|
$120.000
|
$146.980
|
$129.000
|
$141.000
|
$120.000
|
$128.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
35,683.000
|
$25.000
|
$32.000
|
$39.000
|
$40.710
|
$51.260
|
$54.000
|
$53.000
|
$35.000
|
|
|
CEM STABIL BKFL
|
CY
|
286.290
|
$200.000
|
$170.000
|
$290.000
|
$141.340
|
$145.670
|
$250.000
|
$280.000
|
$240.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
40.000
|
$620.480
|
$540.000
|
$740.000
|
$523.480
|
$793.800
|
$600.000
|
$560.000
|
$620.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.560
|
$450.000
|
$1,200.000
|
$1,400.000
|
$700.380
|
$1,048.950
|
$1,200.000
|
$1,300.000
|
$2,000.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.000
|
$600.000
|
$1,200.000
|
$1,400.000
|
$591.730
|
$1,048.950
|
$1,200.000
|
$1,300.000
|
$2,000.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
174.000
|
$80.000
|
$93.000
|
$46.000
|
$53.180
|
$75.350
|
$40.000
|
$45.000
|
$175.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
388.000
|
$110.000
|
$145.000
|
$68.000
|
$91.010
|
$87.240
|
$60.000
|
$67.500
|
$195.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
184.000
|
$120.000
|
$145.000
|
$92.000
|
$80.980
|
$94.960
|
$80.000
|
$90.000
|
$200.000
|
|
|
CMP (GAL STL 42 IN)
|
LF
|
18.000
|
$130.000
|
$220.000
|
$137.000
|
$215.550
|
$143.450
|
$120.000
|
$135.000
|
$525.000
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
64.000
|
$140.000
|
$220.000
|
$142.000
|
$102.490
|
$109.710
|
$125.000
|
$140.000
|
$400.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
340.000
|
$100.000
|
$170.000
|
$131.000
|
$81.330
|
$99.770
|
$115.000
|
$130.000
|
$130.000
|
|
|
SET (TY II) (18 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$800.000
|
$2,200.000
|
$1,370.000
|
$939.580
|
$1,635.210
|
$1,200.000
|
$1,300.000
|
$2,300.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (C)
|
EA
|
10.000
|
$900.000
|
$1,750.000
|
$1,500.000
|
$3,080.520
|
$1,767.170
|
$1,300.000
|
$1,500.000
|
$3,200.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
12.000
|
$1,200.000
|
$2,500.000
|
$1,540.000
|
$1,234.350
|
$2,002.780
|
$1,350.000
|
$1,500.000
|
$3,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
8.000
|
$1,300.000
|
$3,300.000
|
$1,600.000
|
$1,959.260
|
$1,915.250
|
$1,400.000
|
$1,600.000
|
$3,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,300.000
|
$2,500.000
|
$1,600.000
|
$2,602.360
|
$2,011.990
|
$1,400.000
|
$1,600.000
|
$3,600.000
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$4,300.000
|
$2,500.000
|
$1,769.310
|
$2,436.800
|
$2,200.000
|
$2,500.000
|
$3,800.000
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (C)
|
EA
|
25.000
|
$1,800.000
|
$2,800.000
|
$2,700.000
|
$1,315.330
|
$2,850.900
|
$2,400.000
|
$2,700.000
|
$4,400.000
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
8.000
|
$3,300.000
|
$3,250.000
|
$3,000.000
|
$1,673.350
|
$2,802.580
|
$2,600.000
|
$2,900.000
|
$4,500.000
|
|
|
SET (TY II) (42 IN) (CMP) (4: 1) (C)
|
EA
|
3.000
|
$6,000.000
|
$5,100.000
|
$3,900.000
|
$2,513.900
|
$4,247.420
|
$3,400.000
|
$3,800.000
|
$5,600.000
|
|
|
SET (TY II) (48 IN) (CMP) (6: 1) (C)
|
EA
|
6.000
|
$6,050.000
|
$5,000.000
|
$4,500.000
|
$3,014.850
|
$8,239.730
|
$4,000.000
|
$4,500.000
|
$12,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
22.000
|
$1,800.000
|
$1,850.000
|
$1,100.000
|
$1,609.280
|
$1,449.540
|
$4,217.640
|
$2,800.000
|
$2,800.000
|
|
|
REMOV STR (PIPE)
|
LF
|
171.000
|
$20.000
|
$40.000
|
$14.000
|
$34.800
|
$17.200
|
$12.000
|
$13.500
|
$71.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,706,000.000
|
$3,400,000.000
|
$3,300,000.000
|
$2,165,031.900
|
$3,260,777.000
|
$3,084,272.000
|
$2,325,000.000
|
$4,165,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$8,000.000
|
$4,000.000
|
$8,800.000
|
$6,162.880
|
$30,000.000
|
$15,130.000
|
$26,000.000
|
$5,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
936.000
|
$30.000
|
$25.000
|
$15.000
|
$8.660
|
$25.060
|
$23.000
|
$67.500
|
$32.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
936.000
|
$10.000
|
$10.000
|
$2.000
|
$6.680
|
$11.160
|
$10.000
|
$11.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,900.000
|
$3.000
|
$4.000
|
$3.500
|
$2.510
|
$9.720
|
$9.000
|
$4.350
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,900.000
|
$1.000
|
$1.200
|
$1.000
|
$1.050
|
$3.470
|
$4.000
|
$1.350
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
20,400.000
|
$3.000
|
$5.000
|
$5.000
|
$3.190
|
$6.860
|
$7.000
|
$5.500
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
20,400.000
|
$1.000
|
$1.000
|
$1.000
|
$0.940
|
$0.610
|
$1.000
|
$0.930
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
20,006.000
|
$30.000
|
$20.000
|
$35.000
|
$26.890
|
$30.000
|
$34.000
|
$31.500
|
$42.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,444.000
|
$35.000
|
$35.000
|
$25.000
|
$36.970
|
$41.390
|
$60.000
|
$36.000
|
$34.000
|
|
|
TURNOUTS (ACP)
|
SY
|
2,483.000
|
$35.000
|
$30.000
|
$38.000
|
$35.430
|
$29.000
|
$20.000
|
$47.500
|
$46.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
18,000.000
|
$35.000
|
$30.000
|
$37.000
|
$18.020
|
$29.000
|
$29.000
|
$46.000
|
$50.000
|
|
|
DRIVEWAYS (CONC)(TYPE 1)
|
SY
|
360.000
|
$80.000
|
$95.000
|
$85.000
|
$174.890
|
$150.000
|
$90.000
|
$105.000
|
$118.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
6,986.000
|
$25.000
|
$30.000
|
$40.000
|
$29.260
|
$29.000
|
$29.000
|
$27.000
|
$70.000
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
5,030.000
|
$25.000
|
$30.000
|
$40.000
|
$30.430
|
$29.000
|
$45.000
|
$46.000
|
$41.000
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
832.000
|
$20.000
|
$30.000
|
$40.000
|
$40.540
|
$27.000
|
$45.000
|
$27.000
|
$66.000
|
|
|
DRIVEWAYS (CONC)(TYPE 2)
|
SY
|
204.000
|
$80.000
|
$100.000
|
$85.000
|
$137.910
|
$150.000
|
$90.000
|
$105.000
|
$120.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
333,076.000
|
$0.140
|
$0.080
|
$0.140
|
$0.090
|
$0.110
|
$0.150
|
$0.100
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
163,577.000
|
$0.200
|
$0.080
|
$0.140
|
$0.170
|
$0.120
|
$0.160
|
$0.170
|
$0.100
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
13.000
|
$280.000
|
$270.000
|
$270.000
|
$303.630
|
$283.500
|
$150.000
|
$240.000
|
$280.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
4.000
|
$315.000
|
$320.000
|
$320.000
|
$377.020
|
$340.200
|
$210.000
|
$320.000
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
19.000
|
$600.000
|
$590.000
|
$580.000
|
$717.180
|
$623.700
|
$470.000
|
$685.000
|
$610.000
|
|
|
HI MST IL POLE (150 FT)(100 MPH)
|
EA
|
1.000
|
$35,450.000
|
$48,500.000
|
$48,000.000
|
$47,112.800
|
$51,030.000
|
$45,000.000
|
$50,500.000
|
$46,000.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
550.000
|
$26.080
|
$15.000
|
$22.000
|
$14.660
|
$23.810
|
$14.000
|
$15.500
|
$15.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
550.000
|
$1.210
|
$1.400
|
$2.200
|
$1.310
|
$2.270
|
$2.000
|
$1.400
|
$1.300
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,100.000
|
$1.490
|
$1.600
|
$2.200
|
$1.570
|
$2.270
|
$2.000
|
$1.700
|
$1.600
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
3.000
|
$1,145.000
|
$650.000
|
$1,000.000
|
$628.170
|
$1,077.300
|
$600.000
|
$675.000
|
$610.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)SP(O)
|
EA
|
1.000
|
$7,210.000
|
$6,500.000
|
$6,500.000
|
$6,281.700
|
$6,804.000
|
$6,000.000
|
$6,700.000
|
$6,100.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
18.000
|
$20.000
|
$23.000
|
$27.000
|
$21.990
|
$28.350
|
$27.000
|
$33.500
|
$22.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
18.000
|
$25.000
|
$23.000
|
$27.000
|
$21.990
|
$28.350
|
$35.000
|
$45.000
|
$22.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
69.000
|
$600.000
|
$530.000
|
$870.000
|
$492.070
|
$935.550
|
$362.000
|
$530.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
52.000
|
$600.000
|
$600.000
|
$950.000
|
$575.820
|
$1,020.600
|
$450.000
|
$620.000
|
$580.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$700.000
|
$710.000
|
$1,100.000
|
$670.050
|
$1,134.000
|
$600.000
|
$720.000
|
$680.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
30.000
|
$600.000
|
$800.000
|
$1,200.000
|
$821.860
|
$1,247.400
|
$700.000
|
$880.000
|
$760.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$700.000
|
$1,050.000
|
$1,400.000
|
$1,020.770
|
$1,530.900
|
$1,300.000
|
$1,100.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
142.000
|
$100.000
|
$70.000
|
$120.000
|
$68.050
|
$130.410
|
$100.000
|
$73.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
39.000
|
$60.000
|
$80.000
|
$140.000
|
$78.520
|
$153.090
|
$100.000
|
$84.500
|
$70.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
54.000
|
$60.000
|
$85.000
|
$140.000
|
$83.760
|
$153.090
|
$100.000
|
$90.000
|
$70.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
52.000
|
$51.000
|
$54.000
|
$16.000
|
$78.510
|
$17.010
|
$30.000
|
$56.000
|
$12.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
51,967.000
|
$0.200
|
$0.100
|
$0.110
|
$0.170
|
$0.180
|
$0.160
|
$0.100
|
$0.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(LNDP)
|
LF
|
470.000
|
$0.200
|
$0.100
|
$0.110
|
$0.170
|
$0.180
|
$0.160
|
$0.100
|
$0.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
420,688.000
|
$0.200
|
$0.100
|
$0.110
|
$0.170
|
$0.180
|
$0.160
|
$0.100
|
$0.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
3,227.000
|
$0.350
|
$0.200
|
$0.220
|
$0.340
|
$0.360
|
$0.320
|
$0.200
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
35.000
|
$0.500
|
$2.400
|
$2.700
|
$12.560
|
$13.610
|
$12.000
|
$2.450
|
$2.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
2.000
|
$20.000
|
$30.000
|
$34.380
|
$209.390
|
$226.800
|
$200.000
|
$31.500
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
7,436.000
|
$0.250
|
$0.100
|
$0.110
|
$0.170
|
$0.180
|
$0.160
|
$0.100
|
$0.100
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
395,820.000
|
$0.250
|
$0.100
|
$0.110
|
$0.170
|
$0.180
|
$0.160
|
$0.100
|
$0.100
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,735.000
|
$5.200
|
$4.400
|
$5.030
|
$3.140
|
$3.400
|
$3.000
|
$4.600
|
$4.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
30,028.000
|
$0.850
|
$1.500
|
$0.500
|
$0.950
|
$2.270
|
$1.000
|
$1.100
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
18,035.000
|
$0.850
|
$1.500
|
$0.500
|
$0.980
|
$2.270
|
$1.000
|
$1.100
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
3,483.000
|
$1.000
|
$0.650
|
$0.740
|
$0.570
|
$0.610
|
$0.540
|
$0.670
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,647.000
|
$1.000
|
$0.750
|
$0.860
|
$0.750
|
$0.820
|
$0.720
|
$0.790
|
$0.750
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
6.000
|
$1.000
|
$25.000
|
$28.550
|
$31.410
|
$34.020
|
$30.000
|
$26.000
|
$24.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
352,788.000
|
$1.000
|
$0.400
|
$0.440
|
$0.380
|
$0.410
|
$0.360
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
36,572.000
|
$1.250
|
$0.650
|
$0.740
|
$0.570
|
$0.610
|
$0.540
|
$0.670
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
7,306.000
|
$1.000
|
$0.400
|
$0.440
|
$0.380
|
$0.410
|
$0.360
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
316,900.000
|
$1.000
|
$0.400
|
$0.440
|
$0.380
|
$0.410
|
$0.360
|
$0.400
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
74.000
|
$5.000
|
$25.000
|
$28.240
|
$28.270
|
$30.620
|
$27.000
|
$26.000
|
$24.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
25.000
|
$15.000
|
$200.000
|
$227.130
|
$863.730
|
$935.550
|
$825.000
|
$210.000
|
$190.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,889.000
|
$3.000
|
$2.900
|
$3.310
|
$3.140
|
$3.400
|
$3.000
|
$3.050
|
$2.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,375.000
|
$3.000
|
$2.900
|
$3.310
|
$3.140
|
$3.400
|
$3.000
|
$3.050
|
$2.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
78,411.000
|
$0.600
|
$0.350
|
$0.390
|
$0.690
|
$1.130
|
$1.000
|
$0.940
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
120.000
|
$0.800
|
$0.700
|
$0.790
|
$6.470
|
$1.080
|
$1.000
|
$1.250
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
24.000
|
$1.000
|
$22.000
|
$25.170
|
$30.120
|
$3.310
|
$5.000
|
$1.450
|
$21.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$50.000
|
$160.000
|
$181.090
|
$953.060
|
$39.430
|
$42.000
|
$135.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
74.000
|
$5.000
|
$9.000
|
$10.560
|
$5.230
|
$5.670
|
$8.600
|
$9.650
|
$9.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
25.000
|
$20.000
|
$35.000
|
$39.900
|
$43.970
|
$47.630
|
$42.000
|
$36.500
|
$33.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
4.000
|
$240.000
|
$300.000
|
$370.000
|
$287.910
|
$396.900
|
$275.000
|
$310.000
|
$280.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
6.000
|
$1,000.000
|
$2,700.000
|
$4,500.000
|
$2,617.380
|
$4,536.000
|
$2,500.000
|
$2,800.000
|
$2,600.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$6,000.000
|
$5,400.000
|
$7,400.000
|
$5,234.760
|
$7,938.000
|
$5,000.000
|
$5,600.000
|
$51,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$3,000.000
|
$21,500.000
|
$12,000.000
|
$18,203.500
|
$8,766.820
|
$15,900.000
|
$8,900.000
|
$12,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$2,000.000
|
$8,700.000
|
$11,000.000
|
$3,297.260
|
$4,895.480
|
$10,300.000
|
$7,000.000
|
$5,000.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
124,300.000
|
$5.000
|
$2.300
|
$5.000
|
$9.930
|
$5.500
|
$1.000
|
$10.500
|
$9.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
7,700.000
|
$386.000
|
$300.000
|
$325.000
|
$386.000
|
$280.000
|
$118.000
|
$394.000
|
$281.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
713,961.000
|
$4.000
|
$5.300
|
$5.000
|
$4.920
|
$5.580
|
$6.000
|
$5.100
|
$5.400
|
|
|
ASPH FOR REINF FAB (AC-20-5TR)
|
GAL
|
142,792.000
|
$2.500
|
$3.500
|
$3.500
|
$4.900
|
$3.640
|
$4.000
|
$4.150
|
$5.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$13,000.000
|
$17,000.000
|
$7,500.000
|
$19,121.520
|
$20,412.000
|
$22,500.000
|
$17,000.000
|
$25,000.000
|
|
|
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
|
EA
|
1.000
|
$34,153.000
|
$32,500.000
|
$45,000.000
|
$31,408.530
|
$47,628.000
|
$30,000.000
|
$33,500.000
|
$31,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$8,000.000
|
$60,000.000
|
$15,000.000
|
$68,051.820
|
$27,326.930
|
$60,000.000
|
$39,500.000
|
$69,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
123.000
|
$250.000
|
$1,000.000
|
$500.000
|
$1,070.650
|
$749.560
|
$950.000
|
$940.000
|
$475.000
|
|
Totals: |
$39,566,145.740
|
$39,748,230.890
|
$43,321,246.050
|
$46,016,404.895
|
$46,093,074.896
|
$46,217,460.270
|
$46,302,729.710
|
$46,458,236.500
|