WOOD US0080 (6330-92-001)

Items: 49

County: WOOD
Length: N/A
Highway: US0080
District: TYLER
Control Number: 6330-92-001
DBE Goal: N/A
Project: RMC - 633092001
Guaranty: N/A
Time: 730 W
Engineer's Estimate: $240,879.90
Date: 06/12/2018 (7 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$240,879.90
1
$189,884.00
Over/Under Est: -21.17% -$50,995.90
$263,964.00
Over/Under Est: 9.58% $23,084.10
Amt Left: 39.01% $74,080.00
Over/Under Est: 19.05% $45,886.10
Amt Left: 51.02% $96,882.00
Delta: -8.64% -$22,802.00

Bid Items & Bid Tabulations

49 Total 0 of 49
WOOD  |  US0080  |  TYLER  |  6330-92-001  |  06/12/2018  |  $240,879.90  |  RMC - 633092001  |  GUARDRAIL REPAIR  |  730 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
IIPL USA LLC
TALBRAN ENTERPRISES LLC
CONC STR REPAIR (STANDARD)
SF 20.000 $150.000 $100.000 $100.000 $150.000
MOBILIZATION (CALLOUT)
EA 48.000 $200.000 $75.000 $1,000.000 $1,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $16.000 $20.000 $10.000 $25.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 50.000 $25.500 $1.000 $15.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,250.000 $500.000 $500.000 $1,250.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $862.000 $100.000 $1.000 $862.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 250.000 $4.800 $3.000 $1.000 $5.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 50.000 $4.000 $1.000 $3.000 $5.000
TRANSITION ADJUSTMENT
EA 2.000 $131.500 $1.000 $10.000 $136.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,175.000 $200.000 $500.000 $1,175.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $16.250 $1.000 $5.000 $20.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $21.750 $1.000 $20.000 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $5.000 $8.000 $3.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $190.000 $100.000 $50.000 $300.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $283.500 $25.000 $100.000 $285.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 4.000 $2,150.000 $100.000 $200.000 $2,300.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,181.000 $100.000 $100.000 $1,185.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,350.000 $40.000 $35.000 $50.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $15.000 $30.000 $30.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 10.000 $20.000 $35.000 $100.000 $30.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 40.000 $50.000 $100.000 $60.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 4.000 $50.000 $100.000 $100.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 4.000 $174.500 $100.000 $100.000 $200.000
REALIGN POSTS
EA 80.000 $22.000 $25.000 $50.000 $30.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 20.000 $10.000 $40.000 $50.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 32.000 $10.000 $40.000 $50.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 350.000 $24.000 $35.000 $50.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 24.000 $50.000 $100.000 $80.000 $60.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $100.000 $1.000 $1.000 $60.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 14.000 $2,650.000 $4,000.000 $4,000.000 $2,550.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 6.000 $1,000.000 $1,300.000 $1,000.000 $900.000
REM & RESET SGT IMPACT HEAD
EA 16.000 $90.000 $300.000 $100.000 $60.000
REPLACE SGT CABLE ASSEMBLY
EA 4.000 $150.000 $60.000 $50.000 $200.000
REPLACE SGT CABLE ANCHOR
EA 4.000 $150.000 $60.000 $50.000 $200.000
REPLACE SGT STRUT
EA 2.000 $150.000 $20.000 $50.000 $200.000
REPLACE SGT OBJECT MARKER
EA 4.000 $15.000 $20.000 $30.000 $25.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 50.000 $10.000 $16.000 $40.000 $15.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $3,920.500 $1,000.000 $2,000.000 $5,600.000
REPAIR (TRACC)
EA 2.000 $578.500 $1,000.000 $1,000.000 $1,700.000
REPAIR (WIDE TRACC)
EA 2.000 $1,385.750 $1,000.000 $500.000 $1,300.000
REPAIR (NARROW QUAD)
EA 2.000 $1,046.000 $500.000 $500.000 $1,150.000
REPAIR (QUAD) (N) (BAY)
EA 4.000 $566.000 $600.000 $500.000 $500.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $4,956.700 $1,500.000 $4,000.000 $4,700.000
REPAIR (FASTRACC) (BAY)
EA 4.000 $540.500 $500.000 $500.000 $450.000
QUAD(N)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 10.000 $800.000 $500.000 $800.000 $800.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 50.000 $95.000 $30.000 $40.000 $100.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 10.000 $48.000 $25.000 $30.000 $35.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 150.000 $60.000 $30.000 $10.000 $35.000
TMA (STATIONARY)
DAY 96.000 $370.000 $100.000 $100.000 $370.000
Totals: $240,879.900 $189,884.000 $263,964.000 $286,766.000