Show Job Controls
Bid Cobra

WOOD FM 14 (0492-03-040)

Items: 52

County: WOOD
Length: N/A
Highway: FM 14
District: TYLER
Control Number: 0492-03-040
DBE Goal: N/A
Project: STP 2023(452)HES
Guaranty: N/A
Time: 72 WORKING DAYS
Engineer's Estimate: $2,407,434.60
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
LANCE POMYKAL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,407,434.60
$2,614,763.55
Over/Under Est: 8.61% $207,328.95
Over/Under Est: 36.17% $870,691.15
Amt Left: 25.37% $663,362.20
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 1.64% $45,328.16
TEX OP CONSTRUCTION, LP 1.49% $41,182.29
WITHERS CONSTRUCTION, LLC 1.33% $36,760.03
SOUTHWEST ENVIRONMENT SERVICES LLC 1.16% $32,061.38
KITECO PROPERTY SOLUTIONS INC. 0.94% $25,980.77
PANOLA SIGN & BARRICADE, INC. 0.52% $14,372.34
PROFESSIONAL TRAFFIC CONTROL LLC 0.30% $8,291.74
ISAACS CONSTRUCTION SERVICES LLC 0.15% $4,145.87
GROUND POUNDERS LLC 0.00% $0.00
Total: 7.53% $208,122.58

Bid Items & Bid Tabulations

52 Total 0 of 52
WOOD  |  FM 14  |  TYLER  |  0492-03-040  |  02/02/2023  |  $2,407,434.60  |  STP 2023(452)HES  |  HAZARD ELIM & SAFETY  |  72 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EAST TEXAS BRIDGE, INC.
BAKER & COMPANY CONSTRUCTION, LLC
PREPARING ROW
STA 100.000 $2,700.000 $1,500.000 $2,865.000
REMOVING CONC (MEDIANS)
SY 104.000 $20.000 $30.000 $67.000
REMOVING CONC (DRIVEWAYS)
SY 27.000 $20.120 $30.000 $205.000
REMOVING CONC (CURB AND GUTTER)
LF 414.000 $7.770 $15.000 $11.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 60.000 $20.240 $50.000 $72.750
BACKFILL (TY A)
STA 59.000 $230.000 $600.000 $512.000
BLADING
STA 59.000 $173.500 $350.000 $245.000
FURNISHING AND PLACING TOPSOIL (4")
SY 134.000 $1.070 $10.000 $28.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 15,789.000 $0.130 $0.150 $0.200
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 15,789.000 $0.520 $0.750 $0.900
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 15,789.000 $0.700 $0.700 $0.600
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 15,789.000 $0.690 $0.700 $0.600
VEGETATIVE WATERING
MG 174.000 $9.700 $10.000 $10.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,104.000 $56.670 $70.000 $110.000
PLANE ASPH CONC PAV (2")
SY 4,558.000 $4.990 $6.000 $6.600
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,370.000 $6.510 $8.000 $15.400
CL C CONC (COLLAR)
EA 2.000 $1,462.000 $2,000.000 $1,875.000
RC PIPE (CL III)(18 IN)
LF 2,064.000 $54.510 $60.000 $55.000
RC PIPE (CL III)(24 IN)
LF 196.000 $75.990 $77.000 $89.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 116.000 $871.000 $800.000 $904.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 2.000 $2,000.000 $1,100.000 $4,345.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $1,251.000 $1,300.000 $2,375.000
REMOV STR (DRIVEWAY CULVERT)
EA 71.000 $623.000 $400.000 $255.000
MOBILIZATION
LS 1.000 $216,405.000 $250,000.000 $391,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $4,000.000 $15,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $32.000 $40.000 $38.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $8.110 $11.000 $11.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 50.000 $72.000 $125.000 $112.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $2.900 $5.000 $4.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $0.650 $2.200 $2.200
DRIVEWAYS (ACP)
SY 4,085.000 $52.160 $40.000 $64.000
DRIVEWAYS (CONC) (HES)
SY 27.000 $99.200 $150.000 $275.000
RUMBLE STRIPS (SHOULDER)
LF 33,868.000 $0.320 $0.500 $0.300
RUMBLE STRIPS (CENTERLINE)
LF 16,934.000 $0.380 $0.500 $0.300
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 16.000 $150.000 $100.000 $72.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,972.000 $0.310 $1.650 $1.650
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,972.000 $0.320 $1.650 $1.650
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 2,022.000 $1.400 $2.000 $1.100
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 9,308.000 $1.020 $2.000 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 43,708.000 $0.540 $0.550 $0.550
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,524.000 $0.690 $1.100 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 21,729.000 $0.590 $0.550 $0.550
PREFAB PAV MRK TY B (W)(8")(SLD)
LF 360.000 $10.000 $5.500 $5.500
REFL PAV MRKR TY II-A-A
EA 595.000 $3.940 $4.500 $4.400
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 337.000 $204.000 $175.000 $400.000
SP MIXES SP-C SAC-A PG70-22
TON 501.000 $150.000 $185.000 $231.000
TACK COAT
GAL 456.000 $3.210 $6.000 $11.550
TBPFC (MEMBRANE)
GAL 5,406.000 $5.660 $5.000 $4.750
TBPFC PG76-22 SAC-A
TON 4,055.000 $217.910 $260.000 $299.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,050.000 $25,000.000 $21,250.000
TMA (STATIONARY)
DAY 52.000 $244.000 $250.000 $188.000
TMA (MOBILE OPERATION)
DAY 12.000 $419.000 $360.000 $500.000
Totals: $2,407,434.600 $2,614,763.550 $3,278,125.750