PREPARING ROW
|
STA
|
2.000
|
$800.000
|
$10,000.000
|
$2,800.000
|
$1,400.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
213.000
|
$20.000
|
$20.000
|
$25.000
|
$18.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
40.000
|
$15.000
|
$20.000
|
$35.000
|
$18.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
211.640
|
$300.000
|
$450.000
|
$235.000
|
$220.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
6,997.000
|
$35.000
|
$20.000
|
$18.000
|
$24.000
|
|
|
BACKFILL (TY A)
|
STA
|
271.140
|
$250.000
|
$150.000
|
$275.000
|
$246.000
|
|
|
BLADING
|
STA
|
210.000
|
$300.000
|
$150.000
|
$205.000
|
$0.010
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
36,434.000
|
$1.500
|
$1.350
|
$2.250
|
$1.050
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
18,076.000
|
$0.200
|
$0.160
|
$0.170
|
$0.100
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
36,152.000
|
$0.850
|
$0.700
|
$0.700
|
$0.790
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
18,076.000
|
$0.650
|
$0.680
|
$0.700
|
$0.690
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
18,076.000
|
$0.650
|
$0.680
|
$0.700
|
$0.690
|
|
|
VEGETATIVE WATERING
|
MG
|
994.000
|
$11.500
|
$7.000
|
$1.000
|
$25.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
27,118.000
|
$3.050
|
$3.000
|
$3.500
|
$3.000
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
611.000
|
$185.000
|
$175.000
|
$185.000
|
$166.000
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
9,559.000
|
$185.000
|
$175.000
|
$185.000
|
$166.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,500.000
|
$55.000
|
$55.000
|
$55.000
|
$52.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
4,265.000
|
$3.000
|
$6.000
|
$3.000
|
$3.450
|
|
|
CL C CONC (COLLAR)
|
EA
|
5.000
|
$800.000
|
$1,200.000
|
$1,200.000
|
$900.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
143.000
|
$460.000
|
$450.000
|
$510.000
|
$620.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
1,625.000
|
$110.000
|
$82.000
|
$82.000
|
$90.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,652.000
|
$40.000
|
$45.000
|
$53.500
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
666.000
|
$55.000
|
$60.000
|
$70.000
|
$75.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
4.000
|
$175.000
|
$400.000
|
$255.000
|
$475.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$3,600.000
|
$6,000.000
|
$6,000.000
|
$5,700.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
120.000
|
$600.000
|
$625.000
|
$660.000
|
$1,350.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$800.000
|
$800.000
|
$825.000
|
$1,430.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
42.000
|
$875.000
|
$1,000.000
|
$1,050.000
|
$1,725.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,500.000
|
$7,000.000
|
$4,300.000
|
$8,250.000
|
|
|
REMOV STR (PIPE)
|
EA
|
68.000
|
$312.000
|
$500.000
|
$475.000
|
$335.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$312,000.000
|
$400,000.000
|
$420,000.000
|
$455,835.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$5,000.000
|
$20,000.000
|
$5,000.000
|
$39,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,000.000
|
$30.000
|
$28.000
|
$27.500
|
$29.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,095.000
|
$31.000
|
$30.000
|
$31.000
|
$31.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,095.000
|
$9.000
|
$7.000
|
$7.700
|
$8.250
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
150.000
|
$23.000
|
$30.000
|
$35.000
|
$12.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$75.000
|
$75.000
|
$275.000
|
$86.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,610.000
|
$3.250
|
$3.000
|
$3.050
|
$2.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,610.000
|
$1.100
|
$0.500
|
$0.550
|
$0.550
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$102.000
|
$125.000
|
$275.000
|
$0.010
|
|
|
INTERSECTIONS (ACP)
|
SY
|
3,920.000
|
$55.000
|
$40.000
|
$46.000
|
$35.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,025.000
|
$35.000
|
$30.000
|
$40.000
|
$40.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
213.000
|
$100.000
|
$100.000
|
$125.000
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
54,204.000
|
$0.200
|
$0.250
|
$0.180
|
$0.080
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
27,102.000
|
$0.200
|
$0.400
|
$0.140
|
$0.080
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,275.000
|
$30.000
|
$30.000
|
$30.000
|
$32.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,250.000
|
$4.000
|
$3.000
|
$2.200
|
$3.050
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,215.000
|
$3,200.000
|
$3,025.000
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$220.000
|
$300.000
|
$220.000
|
$265.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
38.000
|
$275.000
|
$300.000
|
$415.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
6.000
|
$300.000
|
$400.000
|
$565.000
|
$325.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
36.000
|
$27.000
|
$35.000
|
$27.500
|
$47.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
18.000
|
$21.000
|
$35.000
|
$27.500
|
$47.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
30.000
|
$48.000
|
$55.000
|
$44.000
|
$67.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
54,226.000
|
$0.200
|
$0.140
|
$0.140
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
868.000
|
$0.200
|
$0.550
|
$0.550
|
$0.520
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
40.000
|
$1.600
|
$5.000
|
$4.400
|
$4.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
11,176.000
|
$0.200
|
$0.140
|
$0.140
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
41,720.000
|
$0.200
|
$0.140
|
$0.140
|
$0.140
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
195.000
|
$1.500
|
$2.000
|
$1.200
|
$1.090
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
6,293.000
|
$1.250
|
$2.000
|
$1.400
|
$1.090
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
868.000
|
$0.850
|
$1.100
|
$1.100
|
$1.050
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
300.000
|
$3.450
|
$7.000
|
$6.600
|
$6.250
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
1,624.000
|
$0.120
|
$0.550
|
$0.550
|
$0.540
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
203.000
|
$0.120
|
$0.550
|
$0.550
|
$0.540
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
57,706.000
|
$0.450
|
$0.440
|
$0.440
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,385.000
|
$0.450
|
$0.550
|
$0.550
|
$0.540
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
26,790.000
|
$0.450
|
$0.440
|
$0.440
|
$0.420
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$180.000
|
$220.000
|
$220.000
|
$215.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$250.000
|
$270.000
|
$275.000
|
$260.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
66.000
|
$3.150
|
$6.000
|
$5.500
|
$5.300
|
|
REFL PAV MRKR TY I-C
|
EA
|
44.000
|
$3.000
|
$6.000
|
$5.500
|
$5.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,048.000
|
$3.500
|
$4.000
|
$3.850
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,827.000
|
$0.450
|
$1.100
|
$1.100
|
$1.070
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
2,131.000
|
$110.000
|
$120.000
|
$130.000
|
$135.000
|
|
|
SP MIXES SP-D PG64-22 (LEVEL-UP)
|
TON
|
484.000
|
$112.000
|
$130.000
|
$148.000
|
$120.000
|
|
|
TACK COAT
|
GAL
|
939.000
|
$3.160
|
$5.000
|
$3.900
|
$0.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,500.000
|
$40,000.000
|
$18,000.000
|
$6,400.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$350.000
|
$300.000
|
$200.000
|
$285.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$550.000
|
$300.000
|
$200.000
|
$0.010
|
|
Totals: |
$4,596,702.330
|
$4,577,457.440
|
$4,671,302.540
|
$4,718,765.120
|