Job Info for 0134-07-075

County: WISE Highway: US 380 Date: 08/02/2023 (1 year ago) Engineer's Estimate: $5,685,273 Control Number: 0134-07-075
Project: STP 2B23(142)HES District: FORT WORTH Time: 342 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $5,685,273.08
SILVER CREEK CONSTRUCTION, INC.   $5,064,956.34 1
-10.91% | -$620,316.74
HJC FARMS, INC.   $6,089,027.55 2
7.1% | $403,754.47
20.22% | $1,024,071.21
ROADWAY SPECIALTIES, INC.   $6,607,813.70 3
16.23% | $922,540.62
30.46% | $1,542,857.36
8.52% | $518,786.15
SCR CIVIL CONSTRUCTION, LLC   $6,647,963.15 4
16.93% | $962,690.07
31.25% | $1,583,006.81
0.61% | $40,149.45
VANN/ELLI, INC.   $8,660,909.44 5
52.34% | $2,975,636.36
71% | $3,595,953.10
30.28% | $2,012,946.29
Subcontractor Percentage Amount
J. H. ODEN CONTRACTING COMPANY 6.35% $321,624.73
TEX OP CONSTRUCTION, LP 0.76% $38,493.67
BARRICADES UNLIMITED 0.63% $31,909.22
MAXON DRILLING LLC 0.49% $24,818.29
DATAPOINT SURVEYING AND MAPPING II, LLC 0.19% $9,623.42
Total: 8.42% $426,469.33

Bid Items

Items: 17, 0 filtered
WISE US 380  |  FORT WORTH  |  0134-07-075  |  08/02/2023  |  $5,685,273  |  STP 2B23(142)HES  |  HAZARD ELIM & SAFETY  |  342 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate SILVER CREEK CONSTRUCTION, INC. HJC FARMS, INC. ROADWAY SPECIALTIES, INC. SCR CIVIL CONSTRUCTION, LLC VANN/ELLI, INC.
100 6001 PREPARING ROW AC 51.330 $2,950.000 $4,000.000 $10,000.000 $1,169.260 $1,800.000 $15,000.000
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 282,008.000 $1.000 $0.440 $0.500 $0.680 $0.530 $0.530
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 141,002.000 $0.500 $0.400 $0.350 $0.590 $0.320 $0.530
164 6031 CELL FBR MLCH SEED(TEMP)(COOL) SY 141,002.000 $0.500 $0.400 $0.350 $0.590 $0.320 $0.530
168 6001 VEGETATIVE WATERING MG 19,738.690 $30.000 $10.000 $35.000 $30.000 $37.000 $60.000
432 6046 RIPRAP (MOW STRIP)(5 IN) CY 4,663.360 $360.000 $412.000 $450.000 $524.680 $680.000 $640.000
500 6001 MOBILIZATION LS 1.000 $313,308.280 $506,000.000 $300,000.000 $1,353,532.690 $272,000.000 $500,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 $9,385.000 $15,000.000 $3,000.000 $1,517.570 $7,000.000 $12,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1,350.000 $43.000 $37.000 $30.000 $28.000 $40.500 $45.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,350.000 $15.500 $12.000 $10.000 $26.630 $11.450 $18.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 2,680.000 $6.500 $6.000 $5.000 $4.220 $5.100 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,680.000 $1.500 $1.000 $1.000 $2.580 $1.400 $2.000
543 6002 CABLE BARRIER SYSTEM (TL-4) LF 96,284.000 $16.500 $12.500 $14.000 $13.430 $14.700 $18.420
543 6020 CABLE BARRIER TERMINAL SECTION (TL-4) EA 146.000 $4,000.000 $2,500.000 $4,500.000 $2,081.890 $2,200.000 $4,200.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $12,800.000 $10,000.000 $15,000.000 $6,825.000 $13,000.000 $20,000.000
6185 6002 TMA (STATIONARY) DAY 384.000 $125.000 $150.000 $150.000 $68.250 $355.000 $300.000
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $205.000 $350.000 $300.000 $1,518.450 $900.000 $1,200.000
Totals: $5,685,273.08 $5,064,956.34 $6,089,027.55 $6,607,813.71 $6,647,963.15 $8,660,909.44