Show Job Controls
Bid Cobra

WISE US 81 (0013-08-140)

Items: 125

County: WISE
Length: N/A
Highway: US 81
District: FORT WORTH
Control Number: 0013-08-140
DBE Goal: N/A
Project: C 13-8-140
Guaranty: N/A
Time: 406 WORKING DAYS
Engineer's Estimate: $29,552,471.21
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
EDREAN CHENG
OSCAR R CHAVEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$29,552,471.21
$25,723,015.35
Over/Under Est: -12.96% -$3,829,455.86
Over/Under Est: -2.82% -$832,842.15
Amt Left: 11.65% $2,996,613.71
Over/Under Est: 3.72% $1,099,850.97
Amt Left: 19.16% $4,929,306.83
Delta: -6.73% -$1,932,693.12
Over/Under Est: 12.62% $3,728,599.27
Amt Left: 29.38% $7,558,055.13
Delta: -8.58% -$2,628,748.30
Subcontractor Percentage Amount
IBCTX, LLC 6.93% $1,845,936.37
PEACHTREE CONSTRUCTION, LTD. 6.06% $1,614,195.44
JR WEST TEXAS CONCRETE LLC 4.83% $1,286,561.71
G J SEEDING, LLC 2.61% $695,222.79
TEXOP CONSTRUCTION 1.83% $487,455.06
STRIPING TECHNOLOGY, L.P. 1.61% $428,853.90
ACT SAW CUTTING & REMOVAL 1.17% $311,651.60
DUSTIN ALLEN, INC. 0.89% $237,068.31
SYNERGY SIGNS & SERVICES LLC 0.47% $125,193.38
FC TRAFFIC CONTROL, INC. 0.14% $37,291.64
SURFACE PREPARATION TECHNOLOGIES, LLC 0.08% $21,309.51
TORO BRAVO CONSTRUCTION, LLC 0.07% $18,645.82
Total: 26.69% $7,109,385.53

Bid Items & Bid Tabulations

125 Total 0 of 125
WISE  |  US 81  |  FORT WORTH  |  0013-08-140  |  02/02/2023  |  $29,552,471.21  |  C 13-8-140  |  RESURF ROADWAY  |  406 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
AUSTIN BRIDGE & ROAD SERVICES, LP
TEXAS MATERIALS GROUP, INC.
EUROVIA ATLANTIC COAST LLC
PREPARING ROW
STA 425.500 $1,828.500 $500.000 $6,305.500 $525.000 $150.000
REMOVING CONC (PAV)
SY 6,074.000 $15.500 $15.000 $14.630 $22.400 $30.000
REMOVING CONC (RIPRAP)
SY 2,923.000 $32.500 $30.750 $13.110 $17.000 $26.000
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 3,859.000 $6.500 $5.000 $11.240 $10.500 $15.000
REMOVE STAB BASE & ASPH PAV (24"-38")
SY 1,382.000 $45.000 $9.500 $19.980 $10.500 $26.250
EXCAVATION (ROADWAY)
CY 26,425.000 $16.500 $18.000 $20.420 $22.000 $41.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 15,730.000 $16.800 $9.000 $5.550 $18.750 $45.000
BACKFILL (TY A OR B)
STA 425.500 $195.500 $1.600 $112.620 $475.000 $800.000
COMPOST MANUF TOPSOIL (4")
SY 190,851.000 $1.750 $4.500 $5.070 $2.750 $7.350
BROADCAST SEED (TEMP) (WARM)
SY 95,426.000 $0.750 $0.300 $0.180 $0.200 $0.160
BROADCAST SEED (TEMP) (COOL)
SY 95,426.000 $0.750 $0.300 $0.200 $0.200 $0.160
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 190,851.000 $0.750 $0.600 $0.390 $0.390 $0.560
VEGETATIVE WATERING
MG 6,680.000 $41.750 $45.000 $34.000 $42.000 $70.000
PROOF ROLLING
HR 48.000 $262.500 $65.000 $101.130 $350.000 $215.000
LIME (HYDRATED LIME (SLURRY))
TON 244.000 $294.500 $250.000 $284.080 $300.000 $400.000
LIME TRT (SUBGRADE)(8")
SY 14,679.000 $8.500 $6.900 $6.820 $5.500 $18.500
CEMENT
TON 497.000 $240.000 $310.000 $324.840 $350.000 $460.000
CEMENT TREAT (EXIST MATL) (6")
SY 47,781.000 $2.500 $1.600 $3.760 $4.000 $5.250
SALV, HAUL & STKPL RCL APH PV (3")
SY 101,608.000 $2.800 $2.400 $1.910 $2.600 $2.000
PRIME COAT (MC-30 OR EC-30)
GAL 16,329.000 $21.000 $4.100 $5.220 $6.300 $6.000
ASPH (AC-20-5TR)
GAL 156,826.000 $6.000 $5.000 $4.950 $4.950 $4.950
AGGR(TY-B GR-4 SAC-A)
CY 3,645.000 $525.000 $195.000 $203.980 $195.800 $195.800
CONC PVMT (CONT REINF - CRCP) (8")
SY 7,401.000 $66.000 $120.000 $95.860 $74.750 $115.000
FULL - DEPTH REPAIR CRCP (8")
SY 5,457.000 $288.750 $210.000 $162.680 $204.780 $200.000
FULL - DEPTH REPAIR CRCP (12")
SY 113.000 $335.500 $240.000 $202.840 $230.370 $225.000
CUT & RESTORING PAV
SY 25.000 $136.500 $79.000 $81.000 $85.000 $350.000
RIPRAP (CONC)(5 IN)
CY 480.000 $661.500 $610.000 $636.650 $575.000 $658.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 225.000 $155.500 $360.000 $150.000 $300.000 $380.000
RIPRAP (MOW STRIP)(4 IN)
CY 431.000 $740.750 $610.000 $626.400 $580.000 $705.000
CLEANING AND SEALING EXISTING JOINTS
LF 166,860.000 $4.000 $1.900 $1.800 $5.090 $1.800
CONC BOX CULV (4 FT X 3 FT)
LF 9.000 $431.500 $2,100.000 $2,201.670 $2,300.000 $2,000.000
RC PIPE (CL III)(18 IN)
LF 111.000 $74.000 $110.000 $122.640 $100.000 $100.000
RC PIPE (CL III)(24 IN)
LF 641.000 $112.000 $130.000 $151.580 $125.000 $125.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $9,050.000 $11,300.000 $11,556.000 $11,000.000 $10,700.000
HEADWALL (CH - FW - 45) (DIA= 60 IN)
EA 1.000 $14,000.000 $73,300.000 $77,570.770 $69,200.000 $69,200.000
WINGWALL (FW - S) (HW=7 FT)
EA 1.000 $16,720.000 $57,200.000 $61,154.770 $54,000.000 $54,000.000
SET (PIPE RUNNER ASSEMBLY)
EA 1.000 $4,500.000 $4,200.000 $4,320.000 $4,000.000 $4,000.000
SET (PIPE RUNNER)
EA 2.000 $2,000.000 $3,200.000 $3,240.000 $3,400.000 $3,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $13,125.000 $9,000.000 $9,180.000 $10,000.000 $8,500.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $10,740.000 $20,100.000 $20,520.000 $19,000.000 $19,000.000
SET (TY I)(S= 7 FT)(HW= 8 FT)(4:1) (C)
EA 1.000 $34,650.000 $41,300.000 $42,120.000 $39,000.000 $39,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 6.000 $1,748.000 $1,300.000 $1,296.000 $1,200.000 $1,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 22.000 $2,168.000 $1,500.000 $1,512.000 $1,400.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $4,961.250 $1,800.000 $1,836.000 $1,700.000 $1,700.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 2.000 $4,818.000 $9,500.000 $9,720.000 $9,000.000 $9,000.000
SET (TY II) (42 IN) (RCP) (6: 1) (C)
EA 1.000 $8,864.000 $12,700.000 $12,960.000 $12,000.000 $12,000.000
SET (TY II) (54 IN) (RCP) (6: 1) (C)
EA 1.000 $19,795.000 $23,300.000 $23,760.000 $22,000.000 $22,000.000
CLEAN EXIST CULVERTS
EA 43.000 $2,700.000 $2,600.000 $2,114.680 $2,500.000 $2,500.000
REMOV STR (SET)
EA 15.000 $443.000 $420.000 $540.000 $400.000 $400.000
REMOV STR (PIPE)
LF 501.000 $21.000 $26.500 $27.000 $25.000 $25.000
MOBILIZATION
LS 1.000 $2,656,263.660 $2,400,000.000 $2,871,962.900 $2,933,000.000 $2,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $11,000.000 $20,000.000 $35,245.540 $21,500.000 $64,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 740.000 $98.250 $81.000 $85.000 $105.400 $105.400
ROCK FILTER DAMS (REMOVE)
LF 740.000 $17.000 $42.250 $19.000 $28.920 $28.920
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 315.000 $27.000 $46.000 $25.000 $34.110 $34.110
CONSTRUCTION EXITS (REMOVE)
SY 315.000 $12.250 $31.750 $17.000 $12.160 $12.160
TEMP SEDMT CONT FENCE (INSTALL)
LF 15,412.000 $3.250 $2.800 $1.900 $3.490 $3.490
TEMP SEDMT CONT FENCE (REMOVE)
LF 15,412.000 $1.000 $1.300 $0.840 $0.910 $0.910
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,040.000 $7.250 $5.200 $4.900 $5.470 $5.470
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,040.000 $1.500 $1.200 $4.000 $0.910 $0.910
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
LF 19,530.000 $27.750 $30.750 $53.720 $30.000 $36.000
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
LF 73,440.000 $6.000 $11.750 $7.390 $12.000 $11.000
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
LF 19,530.000 $7.750 $13.750 $7.530 $14.000 $13.000
INTERSECTIONS (ACP)
SY 1,207.000 $21.000 $19.000 $58.060 $65.120 $90.000
DRIVEWAYS (CONC)
SY 350.000 $101.000 $150.000 $142.380 $128.000 $150.000
DRIVEWAYS (ACP)
SY 2,767.000 $53.500 $52.000 $50.400 $75.000 $58.000
RUMBLE STRIPS (SHOULDER)
LF 166,482.000 $0.250 $0.200 $0.100 $0.200 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 8,506.000 $31.000 $20.000 $18.790 $26.000 $23.800
TERMINAL ANCHOR SECTION
EA 1.000 $690.000 $1,200.000 $1,109.000 $1,600.000 $1,335.000
SHORT RADIUS
LF 125.000 $63.000 $43.000 $40.600 $50.000 $50.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,575.000 $1,200.000 $1,101.000 $1,150.000 $1,150.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 16.000 $1,254.000 $1,500.000 $1,390.000 $1,625.000 $1,625.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 3.000 $735.000 $750.000 $709.000 $800.000 $800.000
REMOVE METAL BEAM GUARD FENCE
LF 2,458.000 $3.500 $2.100 $2.000 $3.000 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $155.000 $210.000 $200.000 $200.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $3,360.000 $2,900.000 $2,747.000 $2,800.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $330.750 $210.000 $200.000 $250.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 38.000 $1,730.000 $1,600.000 $1,500.000 $1,500.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $893.000 $1,100.000 $1,500.000 $1,000.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 10.000 $9,152.000 $10,600.000 $8,400.000 $10,000.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 77.000 $770.500 $710.000 $675.000 $750.000 $680.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 12.000 $982.000 $950.000 $895.000 $1,000.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 41.000 $964.500 $770.000 $725.000 $850.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $1,123.500 $840.000 $795.000 $900.000 $890.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 8.000 $1,123.000 $1,000.000 $965.000 $1,100.000 $990.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,676.750 $1,100.000 $1,000.000 $1,000.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 79.000 $134.500 $79.000 $75.000 $100.000 $100.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 198.000 $68.000 $51.000 $48.000 $55.000 $75.000
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
EA 8.000 $84.750 $53.000 $50.000 $55.000 $90.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 83.000 $115.500 $54.000 $51.000 $55.000 $90.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 42.000 $43.750 $32.750 $27.000 $55.000 $45.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 4.000 $52.250 $32.750 $27.000 $55.000 $45.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,571.000 $1.250 $0.550 $0.500 $0.500 $0.450
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 55,654.000 $0.750 $0.550 $0.500 $0.500 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 71,924.000 $0.750 $0.550 $0.500 $0.500 $0.350
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 4,359.000 $1.250 $1.100 $1.000 $1.000 $1.650
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 71,063.000 $1.250 $0.900 $0.850 $0.850 $1.150
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 5,156.000 $2.250 $1.400 $1.300 $1.300 $2.000
WK ZN PAV MRK REMOV (W)12"(LNDP)
LF 3,579.000 $1.750 $6.400 $6.000 $6.000 $3.650
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 468.000 $15.000 $7.400 $7.000 $7.000 $7.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 88,887.000 $1.250 $0.900 $0.850 $0.850 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 13,926.000 $1.850 $5.300 $1.250 $0.810 $2.400
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 6,094.000 $1.850 $5.300 $1.250 $0.810 $2.650
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 2,634.000 $4.000 $1.100 $1.000 $1.200 $1.550
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 14,052.000 $2.000 $1.100 $1.000 $1.200 $1.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 20,704.000 $1.200 $0.650 $0.600 $0.600 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 83,598.000 $0.750 $0.650 $0.600 $0.600 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 82,666.000 $0.850 $0.650 $0.600 $0.600 $0.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 522.000 $15.500 $14.250 $13.350 $13.350 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 44.000 $276.000 $220.000 $208.750 $250.000 $265.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 3.000 $475.000 $280.000 $268.500 $275.000 $475.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 3.000 $548.000 $320.000 $300.350 $300.000 $425.000
PREFAB PAV MRK TY C (W) (WORD)
EA 39.000 $313.500 $250.000 $238.500 $250.000 $335.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 52.000 $29.000 $42.250 $40.000 $40.000 $65.000
REFL PAV MRKR TY II-C-R
EA 1,791.000 $5.000 $3.800 $3.600 $3.600 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 86,700.000 $0.500 $0.300 $0.300 $0.300 $0.510
CAM (ASPHALT) PG(76-22)
TON 1,289.000 $158.000 $150.000 $155.650 $200.000 $210.000
CAM (AGGREGATE)
TON 17,128.000 $158.000 $150.000 $154.590 $200.000 $210.000
D-GR HMA TY-B SAC-B PG64-22
TON 21,217.000 $101.000 $85.000 $99.000 $125.000 $127.500
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 2,175.000 $106.750 $90.000 $131.890 $119.790 $165.000
SP MIXES SP-C SAC-A PG70-28
TON 49,132.000 $156.250 $130.000 $127.140 $158.000 $170.000
TACK COAT
GAL 67,228.000 $2.500 $2.000 $0.130 $0.010 $3.850
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $13,527.000 $25,300.000 $15,425.630 $20,000.000 $18,500.000
TMA (STATIONARY)
DAY 300.000 $133.000 $250.000 $404.680 $3,000.000 $325.000
TMA (MOBILE OPERATION)
DAY 75.000 $212.000 $250.000 $930.320 $800.000 $900.000
Totals: $29,552,471.210 $25,723,015.350 $28,719,629.060 $30,652,322.180 $33,281,070.480