Bid Cobra

WISE US 81 (0013-06-047)

Items: 66

County: WISE
Length: N/A
Highway: US 81
District: FORT WORTH
Control Number: 0013-06-047
DBE Goal: N/A
Project: STP 2021(494)HES
Guaranty: N/A
Time: 171 WORKING DAYS
Engineer's Estimate: $3,078,934.05
Date: 04/08/2021 (5 years ago)
Contract Number: N/A
Type: INSTALL TRAFFIC SIGNAL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$3,078,934.05
$2,749,994.21
Over/Under Est: -10.68% -$328,939.84
Over/Under Est: -10.22% -$314,716.00
Amt Left: 0.52% $14,223.84
$2,821,436.65
Over/Under Est: -8.36% -$257,497.40
Amt Left: 2.6% $71,442.44
Delta: -2.07% -$57,218.60
Over/Under Est: -3.05% -$93,953.38
Amt Left: 8.54% $234,986.46
Delta: -5.80% -$163,544.02
Over/Under Est: -0.85% -$26,036.85
Amt Left: 11.01% $302,902.99
Delta: -2.28% -$67,916.53
Over/Under Est: 3.21% $98,868.34
Amt Left: 15.56% $427,808.18
Delta: -4.09% -$124,905.19

Bid Items & Bid Tabulations

66 Total 0 of 66
WISE  |  US 81  |  FORT WORTH  |  0013-06-047  |  04/08/2021  |  $3,078,934.05  |  STP 2021(494)HES  |  INSTL TRAF SIGNAL  |  171 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
FOUTSCO PAVING COMPANY, LLC
JAGOE-PUBLIC COMPANY
PEACHTREE CONSTRUCTION, LTD.
O. TREVINO CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 15.380 $3,900.000 $7,961.750 $250.000 $130.000 $1,500.000 $6,148.000 $4,200.000
REMOVING CONC (MISC)
CY 19.970 $35.000 $295.120 $100.000 $130.000 $550.000 $67.000 $367.500
EXCAVATION (ROADWAY)
CY 3,332.000 $6.500 $12.240 $15.000 $13.500 $19.500 $12.500 $13.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 72.080 $9.000 $40.120 $50.000 $22.000 $110.000 $72.000 $52.500
COMPOST MANUF TOPSOIL (2")
SY 4,733.720 $5.000 $3.660 $3.500 $4.680 $2.400 $2.550 $2.500
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 4,733.720 $0.380 $1.350 $0.900 $0.470 $0.840 $1.000 $1.000
VEGETATIVE WATERING
MG 165.650 $20.000 $55.000 $40.000 $35.000 $75.000 $175.000 $165.650
LIME (HYDRATED LIME (SLURRY))
TON 54.000 $175.000 $190.560 $165.000 $190.000 $210.000 $200.000 $200.000
LIME TRT (EXST MATL)(8")
SY 3,419.060 $3.450 $12.240 $5.000 $6.000 $7.500 $6.500 $3.150
SALV,HAUL & STKPL RCL APH PV (2" TO 3")
SY 120,521.620 $1.460 $0.790 $0.500 $1.000 $1.100 $1.040 $1.500
PRIME COAT (MC-30)
GAL 637.990 $5.000 $4.590 $4.000 $4.000 $6.000 $5.500 $6.300
CONC PVMT (CONT REINF - CRCP) (8")
SY 3,077.160 $50.000 $64.290 $60.000 $58.000 $120.000 $65.000 $69.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 2.670 $200.000 $1,005.620 $300.000 $1,900.000 $430.000 $685.000 $735.000
RIPRAP (MOW STRIP)(4 IN)
CY 415.950 $450.000 $563.400 $500.000 $710.000 $580.000 $685.000 $525.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,000.000 $1,719.920 $1,000.000 $1,200.000 $1,625.000 $1,400.000 $2,100.000
MOBILIZATION
LS 1.000 $281,266.740 $274,174.430 $206,000.000 $74,000.000 $175,000.000 $300,000.000 $285,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $9,000.000 $8,111.080 $2,000.000 $2,500.000 $7,500.000 $2,500.000 $13,650.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 580.000 $2.500 $2.350 $3.000 $2.500 $5.000 $5.250 $5.180
TEMP SEDMT CONT FENCE (REMOVE)
LF 580.000 $0.600 $1.000 $1.000 $1.050 $1.000 $1.000 $0.870
RUMBLE STRIPS (SHOULDER)
LF 42,363.810 $0.160 $0.100 $0.100 $0.280 $0.250 $0.110 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 5,500.000 $21.000 $17.500 $17.500 $18.500 $19.000 $19.000 $18.550
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,850.000 $1,420.000 $1,420.000 $2,700.000 $1,520.000 $2,100.000 $2,970.970
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,350.000 $900.000 $900.000 $1,000.000 $950.000 $1,000.000 $954.000
MTL BM GD FEN TRANS (NON - SYM)
EA 12.000 $1,035.000 $500.000 $500.000 $525.000 $530.000 $550.000 $530.000
REMOVE METAL BEAM GUARD FENCE
LF 5,375.000 $3.250 $2.000 $2.000 $2.150 $2.200 $2.250 $2.120
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $235.000 $125.000 $125.000 $135.000 $135.000 $135.000 $132.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $325.000 $175.000 $175.000 $190.000 $185.000 $190.000 $185.500
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,600.000 $2,200.000 $2,200.000 $2,300.000 $2,350.000 $2,400.000 $2,332.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $230.000 $230.000 $230.000 $245.000 $245.000 $250.000 $243.800
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $520.000 $475.000 $475.000 $400.000 $405.000 $514.000 $503.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $600.000 $530.000 $530.000 $610.000 $630.000 $575.000 $561.800
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 14.000 $605.000 $675.000 $675.000 $700.000 $710.000 $730.000 $715.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,000.000 $705.000 $705.000 $780.000 $810.000 $763.000 $747.300
REMOVE SM RD SN SUP&AM
EA 2.000 $110.000 $150.000 $150.000 $130.000 $135.000 $162.000 $159.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 26.000 $22.500 $15.000 $60.000 $19.000 $19.000 $19.500 $19.080
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 20.000 $24.000 $15.000 $15.000 $19.000 $19.000 $19.500 $19.080
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 38.000 $58.000 $30.000 $60.000 $26.000 $26.500 $27.000 $26.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 9.000 $28.000 $30.000 $15.000 $26.000 $26.500 $27.000 $26.500
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 32.000 $45.000 $60.000 $30.000 $26.000 $43.000 $44.000 $42.400
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 51.000 $60.000 $60.000 $30.000 $42.000 $43.000 $44.000 $42.400
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,836.000 $0.500 $0.300 $0.300 $0.320 $1.100 $0.400 $1.060
WK ZN PAV MRK NON-REMOV (W)8"(BRK)
LF 413.000 $1.000 $0.600 $0.600 $0.630 $1.100 $0.800 $1.060
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,869.690 $0.750 $0.600 $0.600 $0.630 $1.100 $0.800 $1.060
WK ZN PAV MRK REMOV (REFL) TY I-A
LF 6,148.020 $3.000 $0.850 $0.850 $0.900 $1.000 $1.100 $0.950
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 8,353.380 $1.460 $0.850 $0.850 $0.900 $1.000 $1.100 $0.950
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 8,353.380 $1.770 $0.850 $0.850 $0.900 $1.000 $1.100 $0.950
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 6,148.020 $0.970 $0.850 $0.850 $0.900 $1.000 $1.100 $0.950
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,675.000 $1.290 $1.510 $1.000 $1.250 $2.000 $1.100 $2.490
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 413.000 $1.250 $0.680 $0.680 $0.720 $1.100 $0.900 $1.060
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,869.690 $0.800 $0.680 $0.680 $0.720 $1.100 $0.900 $1.060
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,836.000 $0.450 $0.340 $0.340 $0.360 $0.580 $0.450 $0.580
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 27,244.000 $0.400 $0.340 $0.340 $0.360 $0.480 $0.450 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 27,244.000 $0.400 $0.340 $0.340 $0.360 $0.480 $0.450 $0.480
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 179.000 $12.000 $16.000 $16.000 $17.000 $13.750 $21.000 $13.780
PREFAB PAV MRK TY C (W) (ARROW)
EA 22.000 $270.000 $225.000 $225.000 $235.000 $195.000 $293.000 $190.800
PREFAB PAV MRK TY C (W) (WORD)
EA 22.000 $360.000 $300.000 $300.000 $315.000 $235.000 $390.000 $233.200
REFL PAV MRKR TY II-C-R
EA 592.000 $3.600 $3.500 $3.500 $3.700 $3.800 $4.750 $3.710
ELIM EXT PAV MRK & MRKS (4")
LF 12,368.040 $0.320 $0.750 $0.750 $0.750 $0.260 $1.000 $0.260
ELIM EXT PAV MRK & MRKS (8")
LF 1,084.380 $0.850 $1.000 $1.000 $1.000 $0.540 $1.290 $0.530
D-GR HMA TY-B SAC-B PG64-22
TON 733.960 $92.000 $89.010 $100.000 $75.000 $72.500 $102.000 $75.000
SP MIXES SP-C SAC-A PG70-28
TON 14,480.980 $102.000 $81.100 $105.000 $100.000 $92.300 $92.000 $99.950
TACK COAT
GAL 27,818.520 $2.000 $0.100 $0.010 $3.150 $0.750 $1.150 $0.750
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $60.000 $73.180 $200.000 $75.000 $75.000 $175.000 $210.000
TMA (STATIONARY)
DAY 116.000 $200.000 $191.320 $200.000 $175.000 $150.000 $250.000 $210.000
TMA (MOBILE OPERATION)
HR 224.000 $50.000 $20.910 $1.000 $25.000 $35.000 $56.000 $52.500
SOLAR POWERED LED ROADSIDE SIGN
EA 6.000 $3,000.000 $3,150.000 $3,000.000 $3,500.000 $3,900.000 $3,400.000 $3,339.000
Totals: $3,078,934.048 $2,749,994.322 $2,764,218.097 $2,821,436.714 $2,984,980.715 $3,052,897.256 $3,177,802.448