WINKLER SH 302 (0479-04-050)

Items: 135

County: WINKLER
Length: N/A
Highway: SH 302
District: ODESSA
Control Number: 0479-04-050
DBE Goal: N/A
Project: STP 2020(864)
Guaranty: N/A
Time: 493 WORKING DAYS
Engineer's Estimate: $48,971,162.84
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT GRADE SEPARATIONS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$48,971,162.84
$54,467,578.56
Over/Under Est: 11.22% $5,496,415.72
Over/Under Est: 12.09% $5,921,919.61
Amt Left: 0.78% $425,503.89
$57,021,506.44
Over/Under Est: 16.44% $8,050,343.60
Amt Left: 4.69% $2,553,927.88
Delta: -3.88% -$2,128,423.99
$61,995,742.85
Over/Under Est: 26.6% $13,024,580.01
Amt Left: 13.82% $7,528,164.29
Delta: -8.72% -$4,974,236.41

Bid Items & Bid Tabulations

135 Total 0 of 135
WINKLER  |  SH 302  |  ODESSA  |  0479-04-050  |  08/06/2020  |  $48,971,162.84  |  STP 2020(864)  |  CONSTRUCT GRADE SEPARATIONS  |  493 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KIEWIT INFRASTRUCTURE SOUTH CO.
PULICE CONSTRUCTION, INC.
WEBBER, LLC
FNF CONSTRUCTION, INC.
PREPARING ROW
STA 113.460 $1,200.000 $26,121.970 $15,000.000 $72,477.710 $9,000.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 9.000 $700.000 $260.000 $663.680 $799.640 $2,000.000
REMOVING CONC (RIPRAP)
SY 66.000 $40.000 $66.000 $25.000 $24.460 $40.000
REMOVING CONC (MEDIANS)
SY 412.000 $20.000 $85.000 $50.000 $24.720 $50.000
REMOVING CONC (DRIVEWAYS)
SY 765.000 $11.480 $18.000 $10.500 $15.760 $29.000
REMOVING CONC (CURB AND GUTTER)
LF 1,868.000 $8.000 $3.000 $8.230 $7.390 $11.000
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 1,918.000 $3.200 $0.010 $6.660 $7.500 $9.500
EXCAVATION (ROADWAY)
CY 65,901.000 $8.000 $10.000 $12.000 $4.620 $19.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 153,764.000 $10.000 $45.000 $15.900 $4.460 $33.000
BLADING
HR 100.000 $250.000 $141.000 $200.000 $349.900 $164.000
FURNISHING AND PLACING TOPSOIL
CY 13.000 $50.000 $200.000 $28.100 $539.760 $67.000
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
SY 59,556.000 $0.510 $0.600 $0.520 $0.390 $0.450
PROOF ROLLING
HR 100.000 $120.000 $110.000 $200.000 $301.100 $100.000
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 85,572.000 $15.000 $16.500 $13.000 $13.810 $19.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 22,940.000 $1.130 $7.700 $8.800 $3.320 $4.500
PRIME COAT (MC-30)
GAL 21,877.000 $4.000 $4.000 $5.500 $4.870 $7.000
AGGR(TY-PB GR-4S SAC-A)
CY 1,281.000 $100.000 $100.000 $110.000 $105.000 $130.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 14,300.000 $135.000 $115.000 $135.000 $122.000 $115.000
PLANE ASPH CONC PAV (1.5")
SY 8,280.000 $2.000 $2.300 $5.500 $4.990 $5.250
PLANE ASPH CONC PAV (2")
SY 4,054.000 $10.000 $2.900 $10.000 $5.660 $6.000
STRUCT EXCAV (PIPE)
CY 1,956.000 $15.000 $4.000 $14.780 $12.880 $17.000
CEM STABIL BKFL
CY 2,239.000 $200.000 $91.000 $64.760 $114.760 $195.000
TEMPORARY SPL SHORING
SF 8,146.000 $30.000 $0.010 $46.900 $34.980 $9.000
DRILL SHAFT (24 IN)
LF 148.000 $200.000 $144.000 $162.490 $197.380 $305.980
DRILL SHAFT (42 IN)
LF 936.000 $350.000 $343.000 $267.030 $315.250 $490.000
DRILL SHAFT (54 IN)
LF 2,496.000 $300.000 $570.000 $473.330 $435.800 $460.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 170.000 $450.000 $300.000 $336.480 $275.000 $384.000
CL C CONC (ABUT)
CY 416.800 $900.000 $800.000 $800.000 $1,432.120 $1,100.000
CL C CONC (CAP)(MASS)
CY 689.600 $800.000 $1,200.000 $1,300.000 $1,331.090 $1,500.000
CL C CONC (COLUMN)(MASS)
CY 418.800 $800.000 $1,200.000 $1,200.000 $1,199.000 $1,500.000
CL C CONC (FOOTING)
CY 6.000 $425.000 $560.000 $600.000 $1,554.690 $2,200.000
CL C CONC (FOOTING)(MASS)
CY 748.800 $600.000 $560.000 $700.000 $697.750 $930.000
REINF CONC SLAB (HPC)
SF 105,600.000 $20.000 $20.000 $18.000 $24.330 $35.500
APPROACH SLAB (HPC)
CY 256.800 $200.000 $680.000 $600.000 $690.400 $900.000
RETAINING WALL (MSE)
SF 127,317.000 $44.000 $33.000 $58.000 $59.910 $42.250
RETAINING WALL (TEMP WALL)
SF 65,960.000 $16.000 $0.010 $10.000 $3.110 $12.000
PRESTR CONC GIRDER (TX70)
LF 4,410.100 $280.000 $250.000 $174.150 $165.360 $400.000
RIPRAP (CONC)(4 IN)
CY 160.000 $480.000 $640.000 $607.890 $621.930 $825.000
RIPRAP (CONC)(5 IN)
CY 72.000 $500.000 $580.000 $607.890 $655.970 $760.000
RIPRAP (CONC)(CL B)
CY 6.000 $1,000.000 $1,000.000 $657.620 $1,408.290 $1,500.000
RIPRAP (CONC)(CL B)(5 IN)
CY 29.000 $511.610 $580.000 $652.100 $1,476.310 $730.000
ELASTOMERIC BEARING (EE7)
EA 10.000 $3,000.000 $2,180.000 $1,422.270 $1,882.360 $1,800.000
SLIDING ELASTOMERIC BEARING (ES 7)
EA 10.000 $4,000.000 $2,860.000 $2,320.230 $2,862.820 $4,200.000
ELASTOMERIC BEARING(F10)
EA 10.000 $4,500.000 $4,250.000 $3,239.330 $3,691.060 $4,200.000
ELASTOMERIC BEARING(E10)
EA 10.000 $4,500.000 $4,240.000 $3,239.330 $3,970.870 $3,000.000
STR STEEL (PLATE GIRDER)
LB 7,142,806.000 $1.300 $1.120 $1.460 $1.280 $1.650
STR STEEL (DIAPHRAGM & STIFFENER)
LB 1,558,262.000 $1.700 $1.120 $1.200 $1.310 $1.000
RAIL (TY SSTR)
LF 7,953.000 $40.000 $62.000 $79.230 $47.350 $75.000
RAIL (TY SSTR)(HPC)
LF 5,453.000 $105.000 $70.000 $90.320 $66.370 $75.000
RAIL (TY SSTR)(MOD)
LF 7,737.000 $42.850 $74.000 $79.230 $61.330 $94.000
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 320.000 $140.000 $138.000 $123.890 $188.680 $220.000
CONC BOX CULV (4 FT X 2 FT)
LF 483.000 $260.000 $255.000 $350.000 $189.910 $440.000
RC PIPE (CL III)(18 IN)
LF 242.000 $80.000 $85.000 $100.000 $84.350 $150.000
RC PIPE (CL IV)(24 IN)
LF 2,492.000 $85.000 $106.000 $160.000 $93.830 $170.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 16.000 $2,500.000 $3,970.000 $3,500.000 $4,011.550 $9,000.000
INLET (COMPL)(PSL)(SH)(3FTX3FT-3FTX3FT)
EA 10.000 $3,500.000 $5,450.000 $5,000.000 $5,490.810 $8,000.000
INLET (COMPL)(RWI)(TY I)
EA 16.000 $3,500.000 $5,370.000 $3,000.000 $4,054.290 $4,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $9,000.000 $8,760.000 $15,000.000 $7,847.860 $9,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 26.000 $2,500.000 $1,950.000 $2,000.000 $2,249.230 $1,700.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 42.000 $1,500.000 $1,950.000 $2,000.000 $2,249.280 $1,700.000
REMOV STR (SET)
EA 16.000 $2,900.000 $650.000 $500.000 $697.200 $1,600.000
REMOV STR (PIPE)
LF 478.000 $15.000 $21.000 $25.000 $26.260 $27.000
MOBILIZATION
LS 1.000 $4,450,324.820 $4,865,000.000 $5,489,308.240 $5,750,000.000 $6,140,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $8,000.000 $75,000.000 $5,000.000 $30,000.000 $74,000.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 780.000 $40.000 $41.000 $65.070 $55.000 $44.000
CONSTRUCTION EXITS (REMOVE)
SY 780.000 $10.000 $13.000 $8.680 $15.000 $12.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,905.000 $10.000 $9.000 $8.680 $6.500 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,905.000 $3.000 $2.000 $1.920 $1.000 $1.000
CONSTRUCTING DETOURS
SY 16,289.000 $60.000 $58.000 $82.030 $65.070 $100.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 21,452.000 $30.000 $10.000 $21.250 $33.210 $42.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 11,908.000 $7.000 $4.800 $2.150 $12.000 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 21,452.000 $10.000 $4.600 $9.150 $16.940 $8.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 5,875.000 $120.000 $200.000 $79.230 $66.280 $90.000
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 140.000 $500.000 $206.000 $80.360 $200.950 $275.000
LANDSCAPE PAVERS
SY 6,912.000 $75.000 $77.000 $49.110 $72.560 $55.000
CONC CURB (TY II)
LF 2,360.000 $25.000 $40.000 $33.160 $38.770 $35.000
CONC CURB & GUTTER (TY II)
LF 1,482.000 $25.000 $43.000 $38.680 $28.370 $42.000
CONC CURB (DOWEL)(SLOTTED)
LF 2,160.000 $40.000 $43.000 $44.210 $35.380 $27.000
DRIVEWAYS (CONC)
SY 227.000 $125.000 $112.000 $110.520 $129.830 $195.000
DRIVEWAYS (ACP)
SY 4,436.000 $75.000 $59.000 $64.000 $35.140 $93.000
RUMBLE STRIPS (SHOULDER)
LF 8,936.000 $0.200 $0.300 $0.220 $0.780 $0.650
RUMBLE STRIPS (CENTERLINE)
LF 11,728.000 $0.200 $0.250 $0.220 $0.930 $0.600
CRASH CUSH ATTEN (MOVE & RESET)
EA 42.000 $1,700.000 $1,100.000 $1,308.920 $3,650.000 $800.000
CRASH CUSH ATTEN (REMOVE)
EA 11.000 $1,000.000 $1,100.000 $840.020 $1,500.000 $400.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 11.000 $20,000.000 $15,000.000 $25,000.000 $27,000.000 $20,000.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $627.360 $227.000 $252.220 $190.000 $200.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 8.000 $2,300.000 $2,300.000 $2,083.500 $2,100.000 $2,200.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 8.000 $2,300.000 $2,400.000 $2,472.500 $2,200.000 $2,300.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 17.000 $4,000.000 $5,200.000 $3,481.280 $4,775.000 $4,900.000
CONDT (PVC) (SCH 80) (3/4")
LF 80.000 $50.000 $33.000 $9.970 $30.000 $31.000
CONDT (PVC) (SCH 80) (2")
LF 3,255.000 $10.000 $13.000 $6.450 $11.500 $12.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 415.000 $40.000 $35.000 $25.800 $32.000 $33.000
CONDT (RM) (3/4")
LF 795.000 $25.000 $27.000 $38.500 $25.000 $26.000
ELEC CONDR (NO.12) BARE
LF 4,775.000 $1.100 $1.100 $0.920 $1.000 $1.000
ELEC CONDR (NO.12) INSULATED
LF 9,550.000 $1.200 $1.600 $1.160 $1.500 $1.500
GROUND BOX TY A (122311)W/APRON
EA 16.000 $1,200.000 $1,367.000 $1,339.020 $1,250.000 $1,300.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 5.000 $6,500.000 $7,435.000 $6,400.000 $6,800.000 $7,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 47.000 $700.000 $930.000 $847.830 $775.000 $790.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 20.000 $1,200.000 $1,040.000 $983.610 $865.000 $890.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,000.000 $1,265.000 $1,243.970 $1,056.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 68.000 $130.000 $90.000 $106.660 $110.480 $32.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)SRF
EA 2.000 $100.000 $113.000 $98.710 $94.000 $100.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 28.000 $100.000 $102.000 $139.340 $85.000 $90.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 939.000 $4.500 $5.000 $4.780 $4.520 $3.250
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 503.000 $1.000 $0.350 $0.330 $0.310 $0.900
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 225.000 $4,500.000 $0.350 $0.330 $0.310 $2.250
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 101,722.000 $1.000 $0.350 $0.330 $0.310 $0.800
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 31,775.000 $1.150 $0.650 $0.650 $0.610 $1.300
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 150.000 $8.000 $4.400 $4.250 $4.020 $9.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 134,953.000 $0.800 $0.350 $0.330 $0.310 $0.800
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 2,274.000 $1.000 $1.000 $0.960 $0.900 $0.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,676.000 $1.250 $1.000 $0.960 $0.900 $0.900
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,335.000 $3.500 $4.500 $4.250 $4.020 $3.350
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 301.000 $1,000.000 $8.750 $8.500 $8.040 $7.100
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $180.000 $142.000 $138.090 $130.570 $160.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 5.000 $350.000 $383.000 $371.790 $351.540 $310.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $300.000 $219.000 $212.450 $200.880 $155.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 36.000 $25.000 $22.000 $21.250 $20.090 $26.000
PAVEMENT SEALER 4"
LF 6,121.000 $0.210 $0.500 $0.510 $0.480 $0.160
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 14,531.000 $0.500 $0.500 $0.480 $0.450 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 38,697.000 $0.600 $0.500 $0.480 $0.450 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,213.000 $0.500 $0.500 $0.480 $0.450 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 37,098.000 $0.450 $0.500 $0.480 $0.450 $0.350
REFL PAV MRKR TY I-C
EA 190.000 $4.000 $6.000 $5.840 $5.520 $3.600
REFL PAV MRKR TY II-A-A
EA 300.000 $5.000 $6.000 $5.840 $5.520 $3.600
REFL PAV MRKR TY II-C-R
EA 330.000 $3.500 $6.000 $5.840 $5.520 $3.600
ELIM EXT PAV MRK & MRKS (4")
LF 11,048.000 $0.450 $0.800 $0.800 $0.750 $0.500
REMOVAL OF CONDUIT
LF 989.000 $6.500 $1.100 $8.180 $1.000 $5.000
REMOVE LUMINAIRE POLE
EA 4.000 $1,500.000 $547.000 $600.000 $500.000 $1,000.000
SP MIXES SP-B SAC-B PG70-22
TON 42,774.000 $100.000 $115.000 $131.000 $84.000 $80.000
TACK COAT
GAL 26,259.000 $5.000 $3.000 $4.500 $3.250 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $24,800.000 $12,000.000 $15,350.000 $30,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 1.000 $14,000.000 $9,150.000 $8,750.000 $8,750.000 $20,000.000
TMA (STATIONARY)
DAY 180.000 $220.000 $273.000 $300.000 $346.500 $300.000
TMA (MOBILE OPERATION)
HR 272.000 $70.000 $109.000 $95.000 $90.000 $80.000
Totals: $48,971,162.840 $54,467,578.566 $54,893,082.455 $57,021,506.463 $61,995,742.850