Show Job Controls
Bid Cobra

WILSON CR (0915-14-047)

Items: 60

County: WILSON
Length: N/A
Highway: CR
District: SAN ANTONIO
Control Number: 0915-14-047
DBE Goal: N/A
Project: BR 2021(063)
Guaranty: N/A
Time: 115 WORKING DAYS
Engineer's Estimate: $661,914.75
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$661,914.75
Over/Under Est: -12.82% -$84,844.55
$698,759.75
Over/Under Est: 5.57% $36,845.00
Amt Left: 21.09% $121,689.55
Over/Under Est: 6.96% $46,089.01
Amt Left: 22.69% $130,933.56
Delta: -1.32% -$9,244.01
Over/Under Est: 11.6% $76,799.55
Amt Left: 28.01% $161,644.10
Delta: -4.34% -$30,710.54
Over/Under Est: 30.91% $204,610.45
Amt Left: 50.16% $289,455.00
Delta: -17.30% -$127,810.90

Bid Items & Bid Tabulations

60 Total 0 of 60
WILSON  |  CR  |  SAN ANTONIO  |  0915-14-047  |  07/02/2021  |  $661,914.75  |  BR 2021(063)  |  BRIDGE REPL  |  115 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HARPER BROTHERS CONSTRUCTION LLC
CK NEWBERRY, LLC
HILL COUNTRY BRIDGE, INC.
TASCOSA BRIDGE CO., LC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 3.450 $7,000.000 $6,100.000 $5,000.000 $4,800.000 $6,000.000 $1,793.620
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 1.000 $7,500.000 $3,000.000 $2,500.000 $3,190.000 $2,500.000 $3,094.000
REMOVING CONC (RIPRAP)
SY 155.000 $30.000 $10.000 $20.000 $26.550 $60.000 $25.880
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 759.000 $6.000 $10.000 $12.000 $15.950 $25.000 $7.440
EXCAVATION (ROADWAY)
CY 125.000 $15.000 $50.000 $27.000 $107.000 $25.000 $88.280
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 5.000 $25.000 $135.000 $65.000 $225.000 $200.000 $521.430
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 146.000 $2.500 $5.000 $5.500 $5.300 $3.220 $22.720
CELL FBR MLCH SEED(TEMP)(WARM)
SY 73.000 $2.500 $5.000 $5.500 $5.300 $6.440 $6.940
CELL FBR MLCH SEED(TEMP)(COOL)
SY 73.000 $2.500 $5.000 $5.500 $5.300 $0.010 $28.960
VEGETATIVE WATERING
MG 4.600 $25.000 $22.000 $20.000 $78.000 $45.000 $157.450
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 146.000 $3.500 $6.000 $7.000 $6.400 $3.500 $17.220
PROOF ROLLING
HR 2.000 $75.000 $50.000 $50.000 $410.000 $500.000 $143.950
AGGR(TY-PB GR-3 SAC-B)
CY 7.000 $450.000 $850.000 $775.000 $850.000 $826.050 $667.370
ASPH (AC-15P OR AC-10-2TR)
GAL 211.000 $15.000 $9.000 $9.500 $10.650 $8.740 $8.480
CEM STABIL BKFL
CY 34.000 $200.000 $175.000 $150.000 $206.000 $200.000 $230.680
TRENCH EXCAVATION PROTECTION
LF 102.000 $10.000 $1.000 $25.000 $18.000 $50.000 $51.380
TEMPORARY SPL SHORING
SF 820.000 $30.000 $19.000 $27.000 $16.850 $25.000 $23.710
DRILL SHAFT (24 IN)
LF 183.000 $250.000 $225.000 $675.000 $294.750 $205.000 $632.380
CL C CONC (ABUT)
CY 18.400 $1,400.000 $2,000.000 $1,200.000 $1,145.000 $850.000 $1,445.710
CL C CONC (RAIL FOUNDATION)
CY 7.500 $550.000 $800.000 $750.000 $739.000 $685.000 $2,249.570
REINF CONC SLAB (SLAB BEAM)
SF 1,170.000 $30.000 $39.000 $21.000 $31.650 $23.850 $67.640
APPROACH SLAB
CY 39.000 $600.000 $750.000 $550.000 $778.000 $500.000 $668.060
PRESTR CONC SLAB BEAM (5SB15)
LF 222.500 $225.000 $336.000 $300.000 $271.500 $303.630 $223.630
RIPRAP (CONC)(4 IN)
CY 11.200 $550.000 $650.000 $550.000 $946.000 $500.000 $709.750
RIPRAP (MOW STRIP)(4 IN)
CY 13.500 $500.000 $550.000 $600.000 $957.000 $550.000 $593.420
RAIL (TY T223)
LF 167.000 $200.000 $150.000 $125.000 $118.800 $120.000 $253.620
ARMOR JOINT (SEALED)
LF 50.400 $100.000 $150.000 $175.000 $103.000 $120.000 $139.590
GABIONS (GALV)
CY 232.700 $225.000 $160.000 $180.000 $345.450 $603.000 $275.450
GABION MATTRESSES (GALV)(12 IN)
SY 111.600 $105.000 $65.000 $75.000 $115.450 $250.000 $55.940
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $80,000.000 $40,000.000 $45,000.000 $84,765.000 $57,000.000 $22,754.220
MOBILIZATION
LS 1.000 $61,000.000 $43,000.000 $100,000.000 $71,000.000 $94,500.000 $147,641.330
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $4,000.000 $1,500.000 $1,000.000 $2,845.000 $2,214.000 $1,099.940
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 225.000 $20.000 $13.000 $15.000 $27.650 $20.700 $62.070
CONSTRUCTION EXITS (REMOVE)
SY 225.000 $10.000 $2.000 $3.000 $16.350 $6.900 $11.470
TEMP SEDMT CONT FENCE (INSTALL)
LF 137.000 $3.500 $4.000 $5.000 $7.700 $3.000 $9.570
TEMP SEDMT CONT FENCE (REMOVE)
LF 137.000 $2.000 $2.500 $3.000 $3.000 $1.000 $2.970
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $30.000 $28.000 $32.000 $30.000 $45.000 $139.500
SHORT RADIUS
LF 37.500 $50.000 $47.000 $52.000 $49.000 $59.000 $259.100
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,563.000 $1,700.000 $1,660.000 $1,645.000 $715.600
MTL THRIE-BEAM GD FEN (TIM POST)
EA 3.000 $1,750.000 $1,888.000 $2,100.000 $2,637.000 $2,373.000 $2,111.830
REMOVE METAL BEAM GUARD FENCE
LF 189.000 $25.000 $2.000 $2.250 $10.650 $4.000 $48.960
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,000.000 $2,750.000 $3,100.000 $2,925.000 $3,513.000 $2,630.950
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $450.000 $575.000 $800.000 $611.000 $862.500 $524.530
IN SM RD SN SUP&AM TYFRP(1)UA(P)
EA 2.000 $750.000 $650.000 $650.000 $691.000 $862.500 $443.050
REMOVE SM RD SN SUP&AM
EA 2.000 $200.000 $120.000 $150.000 $165.750 $150.000 $547.550
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $35.000 $25.000 $28.000 $26.550 $23.000 $397.020
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $35.000 $25.000 $56.000 $26.550 $57.500 $281.540
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
EA 5.000 $35.000 $85.000 $120.000 $90.300 $57.500 $411.520
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 31.000 $15.000 $9.000 $17.000 $6.800 $6.000 $17.690
PAVEMENT SEALER 4"
LF 732.000 $0.500 $1.000 $6.000 $0.640 $0.230 $24.340
PAVEMENT SEALER 12"
LF 31.000 $1.500 $7.000 $17.000 $2.000 $0.570 $27.590
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 42.000 $10.000 $5.000 $6.000 $3.000 $4.600 $112.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 690.000 $10.000 $4.000 $6.000 $3.000 $3.000 $8.950
REFL PAV MRKR TY II-A-A
EA 9.000 $60.000 $88.000 $17.000 $9.350 $50.000 $304.280
PAV SURF PREP FOR MRK (4")
LF 732.000 $0.250 $2.000 $3.500 $0.320 $1.150 $7.840
PAV SURF PREP FOR MRK (12")
LF 31.000 $0.250 $4.000 $11.000 $1.060 $2.300 $19.890
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 289.000 $120.000 $133.000 $200.000 $127.600 $135.460 $138.130
TACK COAT
GAL 14.000 $5.000 $17.000 $30.000 $9.550 $16.450 $52.910
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $500.000 $200.000 $1,500.000 $515.000 $57.500 $547.550
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $7,500.000 $5,000.000 $8,630.000 $7,500.000 $6,102.550
Totals: $661,914.750 $577,070.200 $698,759.750 $708,003.765 $738,714.305 $866,525.238