WILSON CR (0915-14-046)

Items: 58

County: WILSON
Length: N/A
Highway: CR
District: SAN ANTONIO
Control Number: 0915-14-046
DBE Goal: N/A
Project: BR 2021(062)
Guaranty: N/A
Time: 116 WORKING DAYS
Engineer's Estimate: $581,756.10
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$581,756.10
$522,735.85
Over/Under Est: -10.15% -$59,020.25
Over/Under Est: -10.03% -$58,355.56
Amt Left: 0.13% $664.69
Over/Under Est: -1.68% -$9,792.38
Amt Left: 9.42% $49,227.87
Delta: -9.28% -$48,563.18
$616,825.70
Over/Under Est: 6.03% $35,069.60
Amt Left: 18% $94,089.85
Delta: -7.84% -$44,861.98
Over/Under Est: 45.71% $265,922.90
Amt Left: 62.16% $324,943.15
Delta: -37.43% -$230,853.30

Bid Items & Bid Tabulations

58 Total 0 of 58
WILSON  |  CR  |  SAN ANTONIO  |  0915-14-046  |  07/02/2021  |  $581,756.10  |  BR 2021(062)  |  BRIDGE REPL  |  116 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TASCOSA BRIDGE CO., LC
ACME BRIDGE COMPANY, INC.
HARPER BROTHERS CONSTRUCTION LLC
CK NEWBERRY, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 3.500 $5,000.000 $2,000.000 $3,510.000 $5,500.000 $5,000.000 $1,768.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 440.000 $6.000 $12.000 $11.100 $15.000 $16.000 $13.890
EXCAVATION (ROADWAY)
CY 113.000 $15.000 $25.000 $35.600 $30.000 $30.000 $97.660
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 71.000 $25.000 $25.000 $41.400 $25.000 $50.000 $73.440
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 535.000 $2.500 $3.220 $1.600 $1.500 $2.000 $2.400
CELL FBR MLCH SEED(TEMP)(WARM)
SY 268.000 $2.500 $6.440 $3.200 $3.000 $3.500 $2.590
CELL FBR MLCH SEED(TEMP)(COOL)
SY 268.000 $2.500 $0.010 $3.200 $3.000 $3.500 $2.590
VEGETATIVE WATERING
MG 16.800 $25.000 $97.750 $81.800 $22.000 $30.000 $162.630
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 535.000 $3.500 $3.500 $3.200 $1.500 $3.500 $5.700
PROOF ROLLING
HR 2.000 $75.000 $500.000 $66.700 $50.000 $50.000 $98.460
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
CY 142.000 $90.000 $80.000 $123.000 $80.000 $110.000 $103.020
ASPH (RC-250)
GAL 128.000 $15.000 $14.260 $20.000 $19.000 $9.500 $14.010
AGGR(TY-B GR-5 SAC-B)
CY 5.000 $400.000 $1,446.180 $2,030.000 $2,000.000 $750.000 $827.910
AGGR(TY-PB GR-3 SAC-B)
CY 12.000 $450.000 $662.000 $930.000 $880.000 $375.000 $402.600
ASPH (AC-15P OR AC-10-2TR)
GAL 423.000 $15.000 $7.700 $10.800 $12.000 $5.500 $9.260
CEM STABIL BKFL
CY 34.000 $200.000 $200.000 $201.000 $150.000 $150.000 $230.680
TRENCH EXCAVATION PROTECTION
LF 46.000 $10.000 $50.000 $30.800 $1.000 $23.000 $113.930
TEMPORARY SPL SHORING
SF 1,300.000 $25.000 $25.000 $20.000 $19.000 $23.000 $25.020
DRILL SHAFT (24 IN)
LF 219.000 $230.000 $157.280 $147.000 $155.000 $575.000 $536.410
CL C CONC (ABUT)
CY 21.400 $1,400.000 $900.000 $1,230.000 $1,750.000 $1,300.000 $1,289.650
REINF CONC SLAB (SLAB BEAM)
SF 1,300.000 $27.500 $23.000 $27.000 $39.000 $21.000 $62.190
APPROACH SLAB
CY 39.000 $550.000 $550.000 $732.000 $750.000 $575.000 $668.060
PRESTR CONC SLAB BEAM (5SB15)
LF 247.110 $210.000 $267.560 $250.000 $350.000 $220.000 $225.580
RIPRAP (MOW STRIP)(4 IN)
CY 13.100 $500.000 $600.000 $926.000 $585.000 $325.000 $611.540
RAIL (TY T223)
LF 128.000 $150.000 $115.000 $94.700 $125.000 $125.000 $248.080
ARMOR JOINT (SEALED)
LF 57.800 $100.000 $110.000 $135.000 $120.000 $175.000 $206.250
GABIONS (GALV)
CY 251.900 $225.000 $224.700 $202.000 $168.000 $200.000 $275.420
GABION MATTRESSES (GALV)(12 IN)
SY 168.000 $105.000 $88.550 $78.300 $67.000 $75.000 $61.130
CMP (GAL STL 12 IN)
LF 8.000 $100.000 $100.000 $96.300 $220.000 $100.000 $288.350
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $10,500.000 $13,500.000 $35,000.000 $35,000.000 $22,754.220
REMOV STR (SMALL FENCE)
LF 25.000 $10.000 $25.000 $6.000 $16.000 $15.000 $15.620
MOBILIZATION
LS 1.000 $53,000.000 $72,500.000 $41,000.000 $41,000.000 $65,000.000 $147,276.210
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $4,000.000 $1,536.630 $3,220.000 $1,750.000 $1,000.000 $1,388.140
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 160.000 $20.000 $20.700 $13.800 $13.000 $15.000 $55.660
CONSTRUCTION EXITS (REMOVE)
SY 160.000 $10.000 $6.900 $2.150 $2.000 $3.000 $11.660
TEMP SEDMT CONT FENCE (INSTALL)
LF 517.000 $3.500 $2.300 $2.300 $2.150 $2.500 $16.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 517.000 $2.000 $1.000 $1.050 $1.000 $1.500 $3.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 96.000 $10.000 $5.180 $8.500 $8.000 $10.000 $20.890
BIODEG EROSN CONT LOGS (REMOVE)
LF 96.000 $2.000 $2.000 $2.650 $2.500 $3.000 $4.390
DRIVEWAYS (SURF TREAT)
SY 148.000 $60.000 $50.000 $74.000 $56.530 $25.000 $65.460
MTL W-BEAM GD FEN (TIM POST)
LF 37.500 $30.000 $50.540 $36.100 $44.000 $40.000 $112.800
SHORT RADIUS
LF 31.000 $50.000 $65.000 $49.100 $60.000 $55.000 $278.390
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $1,000.000 $862.500 $1,530.000 $750.000 $1,700.000 $490.100
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,339.750 $1,660.000 $1,165.000 $1,800.000 $987.550
MTL THRIE-BEAM GD FEN (TIM POST)
EA 3.000 $1,750.000 $2,081.500 $2,000.000 $1,810.000 $2,200.000 $2,785.030
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 1.000 $1,750.000 $2,081.500 $1,960.000 $1,810.000 $2,100.000 $5,055.100
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,000.000 $3,461.500 $2,920.000 $3,100.000 $3,200.000 $2,855.100
REMOVE AND INSTALL EXISTING GATE
EA 1.000 $3,500.000 $450.000 $1,060.000 $250.000 $1,200.000 $6,155.100
WIRE FENCE (TY C)
LF 25.000 $25.000 $15.000 $26.600 $50.000 $30.000 $53.700
REMOVE SM RD SN SUP&AM
EA 2.000 $200.000 $150.000 $532.000 $100.000 $125.000 $602.550
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $35.000 $17.250 $16.000 $15.000 $35.000 $292.520
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $35.000 $34.500 $31.900 $30.000 $35.000 $285.510
PAVEMENT SEALER 4"
LF 700.000 $0.500 $1.550 $2.450 $2.320 $6.000 $4.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 700.000 $10.000 $11.000 $3.650 $3.430 $6.000 $5.650
REFL PAV MRKR TY II-A-A
EA 9.000 $60.000 $57.500 $91.200 $85.770 $20.000 $286.680
PAV SURF PREP FOR MRK (4")
LF 700.000 $0.250 $1.150 $1.800 $1.720 $3.500 $5.650
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $500.000 $57.500 $121.000 $200.000 $1,500.000 $980.680
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $5,560.000 $3,700.000 $7,500.000 $4,500.000 $9,402.550
Totals: $581,756.100 $522,735.852 $523,400.540 $571,963.720 $616,825.700 $847,679.020