WILLIAMSON FM 1466 (1200-04-016)

Items: 115

County: WILLIAMSON
Length: N/A
Highway: FM 1466
District: AUSTIN
Control Number: 1200-04-016
DBE Goal: N/A
Project: BR 2024(026)
Guaranty: N/A
Time: 154 WORKING DAYS
Engineer's Estimate: $3,834,660.84
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,834,660.84
$5,546,235.00
Over/Under Est: 44.63% $1,711,574.16
Over/Under Est: 63.33% $2,428,633.34
Amt Left: 12.93% $717,059.18
Over/Under Est: 71.15% $2,728,546.36
Amt Left: 18.34% $1,016,972.20
Delta: -4.79% -$299,913.02
Over/Under Est: 85.6% $3,282,384.36
Amt Left: 28.32% $1,570,810.20
Delta: -8.44% -$553,838.00
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 24.62% $1,469,528.84
ENVIRONMENTAL SAFETY SERVICES, INC. 19.16% $1,143,630.08
TRP CONSTRUCTION GROUP, LLC 5.72% $341,417.75
TEXAS HIGHWAY WALLS 4.61% $275,163.60
D. I. J. CONSTRUCTION, INC. 2.95% $176,080.83
WYLIE DRILLING & DRAINAGE, INC. 1.48% $88,338.86
BUYERS BARRICADES AUSTIN, LLC 1.20% $71,626.10
GK CONSTRUCTION, LLC 0.10% $5,968.84
Total: 59.84% $3,571,754.90

Bid Items & Bid Tabulations

115 Total 0 of 115
WILLIAMSON  |  FM 1466  |  AUSTIN  |  1200-04-016  |  09/07/2023  |  $3,834,660.84  |  BR 2024(026)  |  BRIDGE REPL  |  154 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOE BLAND CONSTRUCTION, L.P.
AUSTIN ENGINEERING CO., INC.
CAPITAL EXCAVATION COMPANY
AARON CONCRETE CONTRACTORS, LLC
PREPARING ROW
STA 38.000 $1,000.000 $1,500.000 $2,000.000 $1,550.000 $3,000.000
REMOVING CONC (RIPRAP)
CY 42.000 $50.000 $60.000 $50.000 $150.000 $260.000
EXCAVATION (ROADWAY)
CY 1,699.000 $15.000 $42.000 $26.000 $42.300 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 3,835.000 $15.000 $50.000 $23.000 $120.000 $75.000
BACKFILL (TY A)
STA 320.000 $200.000 $200.000 $85.000 $132.000 $180.000
FURNISHING AND PLACING TOPSOIL (4")
SY 9,831.000 $1.500 $4.000 $1.000 $5.500 $4.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 9,831.000 $0.500 $0.510 $1.000 $0.850 $0.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 9,831.000 $0.200 $0.290 $0.500 $0.650 $0.300
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 9,831.000 $0.200 $0.310 $0.500 $0.550 $0.300
VEGETATIVE WATERING
MG 165.000 $20.000 $62.000 $84.000 $40.400 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 527.000 $1.000 $1.600 $2.000 $2.250 $1.600
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 9,304.000 $1.500 $5.550 $2.000 $2.300 $5.700
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 1,490.000 $60.000 $75.000 $158.000 $191.000 $85.000
FL BS (RDWY DEL)(TY A GR 5)
TON 458.000 $32.000 $30.000 $75.000 $52.100 $85.000
REWORK BS MTL (TY B) (6") (ORD COMP)
SY 1,153.000 $10.000 $32.000 $34.000 $14.750 $6.000
CEMENT
TON 23.000 $225.000 $445.000 $297.000 $340.000 $250.000
CEMENT TREAT (NEW BASE) (6")
SY 986.000 $2.750 $35.000 $27.000 $53.300 $8.000
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 1,153.000 $2.500 $35.000 $26.000 $45.600 $7.000
PRIME COAT (MULTI OPTION)
GAL 1,462.000 $4.150 $5.750 $5.000 $7.050 $8.800
ASPH (TIER I)
GAL 34,141.000 $3.750 $5.450 $5.000 $5.150 $6.500
ASPH (RC-250)
GAL 316.000 $5.000 $5.750 $5.000 $76.500 $95.000
AGGR(TY-D GR-5 SAC-B)
CY 6.000 $150.000 $155.290 $160.000 $1,240.000 $1,550.000
AGGR(TY-PD GR-4 SAC-B)
CY 751.000 $160.000 $220.000 $243.000 $197.000 $245.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,500.000 $48.340 $79.000 $136.000 $70.800 $88.000
CEM STABIL BKFL
CY 252.000 $85.000 $200.000 $185.000 $280.000 $350.000
CUT & RESTORING PAV
SY 17.000 $115.000 $442.000 $204.000 $670.000 $664.000
TRENCH EXCAVATION PROTECTION
LF 50.000 $5.000 $183.190 $30.000 $20.400 $13.000
TEMPORARY SPL SHORING
SF 3,278.000 $25.000 $36.000 $24.000 $49.300 $13.000
DRILL SHAFT (24 IN)
LF 270.000 $400.000 $247.500 $237.380 $192.000 $220.000
DRILL SHAFT (36 IN)
LF 320.000 $280.000 $304.000 $350.180 $280.000 $325.000
CL C CONC (ABUT)
CY 67.000 $1,200.000 $1,301.000 $1,319.390 $1,220.000 $1,600.000
REINF CONC SLAB
SF 2,800.000 $20.000 $21.000 $40.000 $32.050 $44.000
REINF CONC SLAB (SLAB BEAM)
SF 1,808.000 $22.000 $35.000 $31.000 $26.150 $33.000
APPROACH SLAB
CY 115.900 $600.000 $743.000 $853.000 $780.000 $880.000
RETAINING WALL (MSE)
SF 3,005.000 $55.000 $132.000 $74.000 $131.000 $106.000
PRESTR CONC SLAB BEAM (4SB15)
LF 445.500 $200.000 $265.000 $302.000 $217.000 $245.000
PRESTR CONC GIRDER (TX28)
LF 347.500 $200.000 $263.000 $376.000 $250.000 $308.000
RIPRAP (CONC)(5 IN)
CY 120.000 $490.000 $790.000 $834.000 $670.000 $1,000.000
RIRRAP (STONE COMMON)(DRY)(15 IN)
CY 8.000 $160.000 $519.590 $541.000 $580.000 $535.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 220.000 $300.000 $210.000 $219.000 $350.000 $220.000
RIPRAP (STONE PROTECTION)(21 IN)
CY 615.000 $180.000 $235.000 $262.000 $350.000 $1,300.000
RIPRAP (MOW STRIP)(4 IN)
CY 114.000 $550.000 $629.000 $655.000 $800.000 $650.000
RAIL (TY T223)
LF 296.000 $150.000 $240.000 $388.000 $145.000 $260.000
ARMOR JOINT (SEALED)
LF 137.000 $150.000 $166.000 $160.000 $143.000 $180.000
CONC BOX CULV (3 FT X 2 FT)
LF 94.000 $280.000 $630.000 $475.000 $570.000 $1,100.000
RC PIPE (CL III)(18 IN)
LF 40.000 $95.000 $158.000 $155.000 $109.000 $145.000
RC PIPE (CL III)(24 IN)
LF 308.000 $100.000 $151.000 $152.000 $121.000 $138.000
RC PIPE (CL III)(30 IN)
LF 100.000 $150.000 $227.000 $174.000 $161.000 $162.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $12,000.000 $20,500.000 $14,000.000 $12,400.000 $20,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 1.000 $9,000.000 $13,463.000 $16,000.000 $14,400.000 $21,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $2,207.000 $4,500.000 $2,730.000 $2,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,500.000 $1,912.000 $5,400.000 $3,030.000 $2,900.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,700.000 $3,611.000 $8,000.000 $4,520.000 $4,100.000
ADJUSTING MANHOLES
EA 1.000 $1,000.000 $1,500.000 $1,500.000 $2,590.000 $2,100.000
REMOV STR (HEADWALL)
EA 1.000 $1,400.000 $1,936.000 $2,500.000 $1,340.000 $8,800.000
REMOV STR (BOX CULVERT)
LF 92.000 $75.000 $112.000 $327.000 $92.300 $310.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $25,000.000 $54,000.000 $38,000.000 $23,200.000 $20,000.000
MOBILIZATION
LS 1.000 $327,075.000 $300,000.400 $300,000.000 $590,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $5,000.000 $6,000.000 $15,000.000 $9,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 195.000 $35.000 $49.170 $44.000 $43.050 $50.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 325.000 $75.000 $118.900 $90.000 $86.100 $120.000
ROCK FILTER DAMS (REMOVE)
LF 520.000 $10.000 $43.220 $32.000 $31.550 $44.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $25.000 $43.090 $31.000 $20.100 $44.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $8.000 $28.550 $2.000 $13.200 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,709.000 $3.500 $4.570 $4.000 $4.000 $4.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,709.000 $0.750 $1.140 $0.600 $0.550 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,709.000 $4.500 $4.570 $6.000 $6.300 $4.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,709.000 $1.800 $1.140 $1.000 $1.150 $1.000
CONSTRUCTING DETOURS
SY 1,030.000 $65.000 $38.000 $234.000 $330.000 $350.000
CONC CURB (TY II)
LF 200.000 $25.000 $115.000 $48.000 $44.700 $45.000
DRIVEWAYS (CONC)
SY 89.000 $90.000 $330.000 $189.000 $175.000 $120.000
DRIVEWAYS (ACP)
SY 1,319.000 $85.000 $69.020 $131.000 $97.100 $58.000
DRIVEWAYS (SURF TREAT)
SY 1,319.000 $35.000 $18.410 $19.000 $14.050 $18.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,436.000 $28.000 $31.350 $32.000 $30.000 $32.000
MTL W-BEAM GD FEN (STEEL POST)
LF 75.000 $36.000 $98.870 $103.000 $105.000 $102.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,300.000 $2,715.020 $3,000.000 $2,890.000 $2,800.000
SHORT RADIUS
LF 100.000 $75.000 $95.280 $98.000 $101.000 $98.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 4.000 $1,125.000 $2,014.680 $1,191.000 $1,200.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 470.000 $3.000 $7.950 $8.000 $8.450 $8.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,500.000 $4,285.050 $4,400.000 $4,560.000 $4,400.000
PIPE UNDERDRAINS (TY 6) (6")
LF 389.000 $30.000 $100.010 $44.000 $60.450 $35.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 5.000 $200.000 $388.850 $595.000 $171.000 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $500.000 $800.570 $841.000 $710.000 $835.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $750.000 $888.630 $2,423.000 $860.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $950.000 $1,212.290 $1,208.000 $910.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,200.000 $888.630 $1,300.000 $1,030.000 $1,310.000
REMOVE SM RD SN SUP&AM
EA 22.000 $85.000 $131.520 $113.000 $114.000 $112.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 18.000 $70.000 $124.880 $297.000 $133.000 $130.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $35.000 $49.960 $129.000 $53.100 $52.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,200.000 $0.850 $0.760 $0.770 $1.050 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,850.000 $0.750 $0.760 $0.770 $1.050 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,190.000 $1.300 $1.170 $4.000 $1.750 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 80.000 $10.000 $35.210 $35.760 $13.750 $35.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 2.000 $655.000 $880.230 $893.000 $770.000 $880.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 69,850.000 $0.360 $0.260 $0.250 $0.680 $0.300
REFL PAV MRK TY II (W) 24" (SLD)
LF 80.000 $6.000 $5.870 $5.000 $5.750 $5.900
REFL PAV MRK TY II (W) (RR XING)
EA 2.000 $300.000 $352.090 $357.000 $400.000 $350.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 12,468.000 $0.160 $0.200 $0.200 $0.700 $0.200
REFL PAV MRK TY II (Y) 6" (SLD)
LF 49,039.000 $0.350 $0.420 $0.400 $0.700 $0.400
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 69,850.000 $0.650 $1.090 $1.000 $0.940 $1.100
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 12,478.000 $0.970 $0.620 $1.000 $0.950 $0.600
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 49,039.000 $0.650 $1.090 $1.250 $0.950 $1.100
REFL PAV MRKR TY II-A-A
EA 873.000 $4.500 $8.510 $8.000 $5.000 $8.500
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 1,106.000 $105.000 $201.000 $208.000 $169.000 $200.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 2,002.000 $135.850 $196.000 $202.000 $202.000 $230.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 1,045.000 $105.000 $230.060 $238.000 $213.000 $245.000
D-GR HMA TY-C PG76-22 (EXEMPT)
TON 156.000 $105.000 $483.130 $500.000 $280.000 $325.000
UNDERSEAL COURSE
GAL 2,589.000 $3.500 $5.750 $5.000 $10.100 $13.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $94.940 $62.000 $300.000 $36.350 $83.000
TMA (STATIONARY)
DAY 171.000 $175.000 $171.000 $300.000 $200.000 $206.000
TMA (MOBILE OPERATION)
HR 86.000 $125.000 $18.000 $500.000 $106.000 $95.000
LCS SYSTEM
EA 2.000 $4,500.000 $4,500.000 $36,000.000 $100.000 $5,000.000
LCS SYSTEM (RELOCATE)
EA 5.000 $1,100.000 $1,500.000 $6,000.000 $100.000 $2,700.000
LCS SYSTEM (REMOVE)
EA 2.000 $4,400.000 $2,500.000 $600.000 $100.000 $560.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 16.000 $2,000.000 $1,200.000 $2,800.000 $2,050.000 $1,000.000
Totals: $3,834,660.840 $5,546,235.000 $6,263,294.180 $6,563,207.200 $7,117,045.200