County: WILLIAMSON Highway: VA Date: 04/07/2021 (3 years ago) Engineer's Estimate: $286,294 Control Number: 0914-05-209
Project: C 914-5-209 District: AUSTIN Time: 32 WORKING DAYS Type: LANDSCAPE DEVELOPMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $286,294.00
TIGHT LINE CONSTRUCTION, LLC   $288,957.00 1
0.93% | $2,663.00
ENCINO LANDSCAPE, INC.   $299,527.10 2
4.62% | $13,233.10
3.66% | $10,570.10
APEX LANDSCAPE & IRRIGATION, LLC   $307,823.25 3
7.52% | $21,529.25
6.53% | $18,866.25
2.77% | $8,296.15
SEFBO PIPELINE BRIDGE, INCORPORATED   $663,287.12 4
131.68% | $376,993.12
129.55% | $374,330.12
115.48% | $355,463.87

Bid Items

Items: 28, 0 filtered
WILLIAMSON VA  |  AUSTIN  |  0914-05-209  |  04/07/2021  |  $286,294  |  C 914-5-209  |  LANDSCAPE DEVELOPMENT  |  32 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TIGHT LINE CONSTRUCTION, LLC ENCINO LANDSCAPE, INC. APEX LANDSCAPE & IRRIGATION, LLC SEFBO PIPELINE BRIDGE, INCORPORATED
161 6022 GENERAL USE COMPOST (4") SY 4,269.000 $4.000 $3.000 $3.000 $2.250 $4.430
170 6001 IRRIGATION SYSTEM LS 1.000 $27,000.000 $30,000.000 $30,000.000 $50,000.000 $114,324.950
180 6001 WILDFLOWER SEEDING AC 35.000 $1,500.000 $1,250.000 $1,000.000 $1,750.000 $1,006.250
192 6002 PLANT MATERIAL (1-GAL) EA 1,109.000 $15.000 $13.000 $8.000 $8.000 $16.100
192 6004 PLANT MATERIAL (5-GAL) EA 1,863.000 $30.000 $33.000 $30.000 $30.000 $33.350
192 6005 PLANT MATERIAL (15-GAL) EA 20.000 $130.000 $150.000 $125.000 $125.000 $132.250
192 6006 PLANT MATERIAL (30-GAL) EA 12.000 $215.000 $250.000 $250.000 $275.000 $845.250
192 6013 MULCH SY 4,269.000 $4.000 $4.000 $3.000 $2.000 $5.460
192 6016 PLANT BED PREPARATION SY 4,269.000 $3.000 $2.000 $1.000 $2.000 $6.840
193 6001 PLANT MAINTENANCE MO 24.000 $250.000 $750.000 $1,000.000 $1,250.000 $5,175.000
193 6003 PLANT REPLACEMENT (1-GAL) EA 100.000 $15.000 $6.000 $0.010 $1.000 $10.350
193 6005 PLANT REPLACEMENT (5-GAL) EA 140.000 $30.000 $12.000 $0.010 $1.000 $24.150
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 24.000 $150.000 $750.000 $500.000 $650.000 $4,025.000
193 6009 PLANT REPLACEMENT (15 GAL) EA 3.000 $130.000 $150.000 $0.010 $1.000 $109.250
193 6010 PLANT REPLACEMENT (30 GAL) EA 3.000 $215.000 $250.000 $0.010 $1.000 $603.750
402 6001 TRENCH EXCAVATION PROTECTION LF 50.000 $10.000 $1.000 $0.010 $1.000 $3.500
403 6001 TEMPORARY SPL SHORING SF 50.000 $10.000 $1.000 $0.010 $1.000 $15.120
432 6002 RIPRAP (CONC)(5 IN) CY 5.000 $550.000 $50.000 $1,000.000 $1.000 $449.920
500 6001 MOBILIZATION LS 1.000 $24,845.000 $28,000.000 $60,000.000 $25,000.000 $37,375.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 $1,500.000 $4,000.000 $3,000.000 $5,000.000 $4,025.000
506 6035 SANDBAGS FOR EROSION CONTROL EA 50.000 $5.000 $5.000 $0.010 $1.000 $11.500
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 200.000 $2.500 $7.000 $0.010 $1.000 $3.740
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 200.000 $1.000 $3.000 $0.010 $1.000 $0.860
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3,380.000 $4.000 $3.500 $8.000 $1.800 $6.900
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,380.000 $1.000 $1.000 $0.010 $0.250 $2.300
1004 6001 TREE PROTECTION EA 3.000 $250.000 $200.000 $100.000 $200.000 $402.500
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $5,000.000 $100.000 $0.010 $2,000.000 $14,375.000
6185 6002 TMA (STATIONARY) DAY 32.000 $175.000 $25.000 $0.010 $200.000 $345.000
Totals: $286,294.00 $288,957.00 $299,527.10 $307,823.25 $663,287.12