WILLIAMSON FM 112 (0334-01-048)

Items: 82

County: WILLIAMSON
Length: 0.0000 MILES
Highway: FM 112
District: AUSTIN
Control Number: 0334-01-048
DBE Goal: 0.0%
Project: C 334-1-48
Guaranty: $100,000.00
Time: 215 WORKING DAYS
Engineer's Estimate: $5,142,433.61
Date: 11/05/2025 (7 months ago)
Contract Number: 11253010
Type: WIDEN ROAD - ADD SHOULDERS
Project ID: A00135331
Project Description: WIDEN OF 2 LANE RURAL ROADWAY AND ADD 4' SHOULDERS
Mail/Deliver Bids To: N/A
KYLE RUSSELL
JEREMY MIKES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (10)
E
Engineer's Estimate
$5,142,433.61
$4,482,346.63
Over/Under Est: -12.84% -$660,086.98
Over/Under Est: -12.03% -$618,816.05
Amt Left: 0.92% $41,270.93
Over/Under Est: -10.27% -$528,009.86
Amt Left: 2.95% $132,077.12
Delta: -2.01% -$90,806.19
$4,844,488.00
Over/Under Est: -5.79% -$297,945.61
Amt Left: 8.08% $362,141.37
Delta: -4.99% -$230,064.25
$5,117,874.79
Over/Under Est: -0.48% -$24,558.82
Amt Left: 14.18% $635,528.16
Delta: -5.64% -$273,386.79
Over/Under Est: 0.44% $22,801.40
Amt Left: 15.24% $682,888.38
Delta: -0.93% -$47,360.22
Over/Under Est: 1.39% $71,387.20
Amt Left: 16.32% $731,474.18
Delta: -0.94% -$48,585.80
$5,301,386.50
Over/Under Est: 3.09% $158,952.89
Amt Left: 18.27% $819,039.87
Delta: -1.68% -$87,565.69
Over/Under Est: 8.48% $435,978.88
Amt Left: 24.45% $1,096,065.86
Delta: -5.23% -$277,025.99
Over/Under Est: 12.54% $644,681.89
Amt Left: 29.11% $1,304,768.87
Delta: -3.74% -$208,703.01
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 22.92% $1,030,470.97
JE CASEY, LLC 4.06% $182,535.43
THE LEVY COMPANY, LLC 3.94% $177,140.30
CASTILLO BUILDERS L.L.C. 2.34% $105,205.15
D. I. J. CONSTRUCTION, INC. 2.23% $100,259.61
MURRAY CONSTRUCTION 0.71% $31,921.22
SUPERIOR TRAFFIC CONTROL, LLC 0.34% $15,286.22
Total: 36.54% $1,642,818.90

Bid Items & Bid Tabulations

82 Total 0 of 82
WILLIAMSON  |  FM 112  |  AUSTIN  |  0334-01-048  |  11/05/2025  |  $5,142,433.61  |  C 334-1-48  |  WIDEN ROAD - ADD SHOULDERS  |  215 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
POSILLICO CIVIL, INC.
HUNTER INDUSTRIES, LTD.
JOE BLAND CONSTRUCTION LLC
CHASCO CONSTRUCTORS
STX CIVIL
AARON CONCRETE CONTRACTORS, LLC
TEXAS MATERIALS GROUP, INC.
PATIN CONSTRUCTION LLC
KNIFE RIVER CORPORATION - SOUTH
GREY SKY CONSTRUCTION LLC
PREPARING ROW
STA 120.000 $3,000.000 $1,200.000 $519.200 $1,000.000 $400.000 $369.000 $300.000 $500.000 $1,500.000 $1,000.000 $4,000.000
EXCAV (ROADWAY)
CY 10,612.000 $21.000 $6.000 $15.400 $12.000 $20.000 $36.000 $16.000 $15.000 $20.000 $20.000 $20.000
EMBANK (FNL)(OC)(TY B)
CY 9,488.000 $22.500 $12.000 $15.400 $10.000 $35.000 $38.000 $36.000 $15.000 $10.000 $20.000 $50.000
BACKFILL (TY A)
STA 24.000 $150.000 $600.000 $151.800 $1,275.000 $210.000 $251.000 $2,600.000 $745.000 $500.000 $400.000 $450.000
FURN & PLACE TOPSOIL (4")
SY 27,363.000 $2.250 $1.000 $1.150 $2.000 $1.500 $0.500 $2.000 $0.780 $3.000 $1.000 $10.000
BROADCAST SEED (TEMP_WARM)
SY 27,363.000 $0.220 $0.140 $0.140 $0.250 $0.500 $0.500 $0.350 $0.250 $1.000 $0.280 $1.000
VEGETATIVE WATERING
TGL 462.000 $35.000 $30.000 $26.400 $40.000 $25.000 $100.000 $32.000 $62.000 $20.000 $30.000 $50.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 8,168.000 $80.000 $65.000 $72.120 $108.000 $65.000 $75.000 $75.000 $95.000 $87.000 $75.000 $60.000
PRIME COAT (AE-P)
GAL 4,303.000 $5.500 $3.000 $4.510 $4.000 $3.500 $4.000 $4.000 $4.000 $5.000 $7.500 $6.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 17,374.000 $4.750 $3.000 $3.740 $3.500 $3.500 $4.000 $4.000 $5.050 $5.000 $4.400 $6.000
AGGR (TY-PD, GR-4)(SAC-B)
CY 381.000 $175.000 $189.000 $136.050 $200.000 $198.000 $200.000 $235.000 $236.750 $325.000 $200.000 $250.000
D-GR HMA TY-C PG76-22
TON 3,994.000 $125.000 $122.000 $101.200 $130.000 $128.000 $132.000 $145.000 $130.500 $150.000 $145.000 $180.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 2,767.000 $130.000 $115.000 $103.400 $125.000 $121.000 $125.000 $142.000 $128.600 $140.000 $155.000 $20.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,533.000 $65.000 $65.000 $46.230 $51.000 $80.000 $55.000 $71.000 $52.800 $75.000 $69.000 $60.000
FLOWABLE BACKFILL
CY 76.000 $300.000 $275.000 $150.000 $220.000 $215.000 $227.000 $255.000 $425.000 $500.000 $500.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 60.000 $25.000 $10.000 $25.000 $4.000 $25.000 $13.000 $15.000 $15.000 $50.000 $17.000 $10.000
TEMPORARY SPL SHORING
SF 160.000 $35.000 $175.000 $10.000 $125.000 $25.000 $23.000 $35.000 $75.000 $50.000 $85.000 $85.000
RIPRAP (CONC)(5 IN)
CY 399.820 $600.000 $650.000 $750.000 $575.000 $650.000 $606.000 $688.000 $850.000 $700.000 $850.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 117.500 $565.000 $750.000 $815.000 $740.000 $775.000 $875.000 $890.000 $750.000 $600.000 $850.000 $550.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 19.300 $175.000 $115.000 $150.000 $235.000 $280.000 $227.000 $442.000 $150.000 $250.000 $175.000 $100.000
RIRRAP (STONE COMMON)(DRY)(15 IN)
CY 17.000 $275.000 $175.000 $175.000 $245.000 $290.000 $227.000 $492.000 $175.000 $250.000 $200.000 $185.000
CONC BOX CULV (6 FT X 6 FT)
LF 56.000 $875.000 $1,600.000 $1,200.000 $925.000 $830.000 $725.000 $1,012.000 $1,000.000 $900.000 $1,100.000 $850.000
CONC BOX CULV (11 FT X 9 FT)
LF 47.000 $2,500.000 $3,200.000 $2,200.000 $1,950.000 $2,100.000 $2,315.000 $2,348.000 $3,000.000 $2,175.000 $3,250.000 $1,500.000
RC PIPE (CL III)(18 IN)
LF 468.000 $100.000 $68.000 $120.000 $95.000 $80.000 $67.000 $125.000 $65.000 $75.000 $75.000 $85.000
RC PIPE (CL III)(24 IN)
LF 40.000 $140.000 $91.000 $122.000 $165.000 $110.000 $82.000 $220.000 $150.000 $100.000 $175.000 $110.000
RC PIPE (CL III)(30 IN)
LF 148.000 $150.000 $226.000 $100.000 $170.000 $120.000 $105.000 $260.000 $200.000 $125.000 $235.000 $125.000
RC PIPE (CL III)(36 IN)
LF 73.000 $220.000 $170.000 $430.000 $295.000 $250.000 $145.000 $430.000 $250.000 $200.000 $290.000 $150.000
RC PIPE (CL III)(42 IN)
LF 58.000 $250.000 $221.000 $380.000 $415.000 $350.000 $194.000 $425.000 $300.000 $300.000 $350.000 $250.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $14,500.000 $16,000.000 $17,500.000 $12,500.000 $11,000.000 $19,415.000 $20,000.000 $13,000.000 $12,500.000 $15,000.000 $11,500.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $30,000.000 $35,000.000 $33,500.000 $22,250.000 $26,000.000 $30,000.000 $28,000.000 $18,000.000 $66,000.000 $21,000.000 $20,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 1.000 $60,000.000 $95,000.000 $62,500.000 $41,750.000 $48,000.000 $73,500.000 $53,000.000 $35,000.000 $90,000.000 $40,000.000 $25,000.000
WINGWALL (PW - 1) (HW=12 FT)
EA 1.000 $71,000.000 $100,000.000 $72,000.000 $49,800.000 $51,000.000 $75,000.000 $56,000.000 $36,500.000 $95,000.000 $42,000.000 $30,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $1,700.000 $1,200.000 $2,250.000 $4,150.000 $2,300.000 $1,650.000 $1,100.000 $1,000.000 $3,000.000 $1,150.000 $1,850.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,750.000 $1,725.000 $2,600.000 $4,150.000 $2,700.000 $1,850.000 $1,200.000 $1,000.000 $3,000.000 $1,150.000 $1,850.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 19.000 $1,800.000 $2,500.000 $3,100.000 $3,000.000 $3,000.000 $2,000.000 $1,400.000 $1,200.000 $3,000.000 $1,400.000 $1,850.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 6.000 $3,750.000 $4,300.000 $5,200.000 $5,500.000 $6,500.000 $4,500.000 $3,200.000 $4,500.000 $7,500.000 $5,000.000 $3,500.000
REMOV STR (SET)
EA 23.000 $500.000 $250.000 $300.000 $575.000 $500.000 $675.000 $690.000 $850.000 $500.000 $1,000.000 $500.000
REMOV STR (WINGWALL)
EA 13.000 $1,750.000 $1,500.000 $3,500.000 $500.000 $1,000.000 $3,000.000 $1,600.000 $1,500.000 $2,500.000 $1,750.000 $2,500.000
REMOV STR (HEADWALL)
EA 6.000 $2,750.000 $1,632.400 $750.000 $1,000.000 $750.000 $1,500.000 $1,800.000 $1,500.000 $2,500.000 $1,750.000 $5,000.000
REMOV STR (PIPE)
LF 431.000 $35.000 $30.060 $20.000 $30.000 $35.000 $39.000 $63.000 $50.000 $40.000 $55.000 $50.000
REMOV STR (BOX CULVERT)
LF 60.000 $150.000 $290.960 $300.000 $75.000 $80.000 $125.000 $186.000 $400.000 $100.000 $450.000 $500.000
MOBILIZATION
LS 1.000 $378,600.000 $400,000.000 $446,573.920 $150,000.000 $418,776.000 $400,000.000 $392,000.000 $513,500.000 $85,000.000 $555,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $10,000.000 $1,100.000 $8,250.000 $7,500.000 $5,000.000 $1,500.000 $1,200.000 $4,000.000 $5,000.000 $19,500.000 $12,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $20,000.000 $5,105.850 $23,950.000 $7,000.000 $5,000.000 $10,000.000 $12,500.000 $20,000.000 $30,000.000 $20,000.000
TMA (STATIONARY)
DAY 279.000 $225.000 $75.000 $153.180 $210.000 $355.000 $120.000 $175.000 $324.750 $250.000 $100.000 $250.000
TMA (MOBILE OPERATION)
DAY 24.000 $250.000 $300.000 $255.290 $105.000 $865.000 $300.000 $762.000 $974.250 $1,000.000 $100.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 800.000 $45.000 $35.000 $50.000 $40.000 $30.000 $55.000 $35.000 $65.000 $50.000 $55.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 800.000 $15.000 $10.000 $12.000 $20.000 $11.000 $5.000 $18.000 $12.000 $10.000 $20.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,645.000 $3.500 $3.500 $3.300 $5.000 $4.000 $4.000 $3.400 $4.250 $4.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,645.000 $1.000 $1.000 $1.000 $1.000 $0.500 $0.500 $0.800 $1.000 $1.000 $0.750 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,000.000 $7.250 $4.000 $4.000 $6.000 $5.000 $5.500 $5.800 $6.000 $10.000 $5.500 $12.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 5.000 $5,500.000 $6,000.000 $18,278.590 $7,500.000 $4,700.000 $5,770.000 $18,000.000 $8,972.310 $9,000.000 $7,500.000 $8,500.000
INTERSECTIONS (ACP)
SY 408.000 $95.000 $75.000 $48.400 $50.000 $90.000 $52.000 $57.000 $250.800 $57.000 $89.000 $50.000
DRIVEWAYS (ACP)
SY 988.000 $60.000 $60.000 $48.400 $40.000 $55.000 $40.000 $43.000 $157.000 $45.000 $83.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,125.000 $28.000 $21.000 $21.000 $27.000 $22.000 $26.000 $32.000 $22.370 $35.000 $25.000 $23.000
MTL W-BEAM GD FEN (STEEL POST)
LF 587.500 $40.000 $23.000 $31.000 $32.000 $33.000 $29.500 $37.000 $25.170 $45.000 $36.000 $35.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,500.000 $2,540.000 $3,000.000 $3,500.000 $3,150.000 $3,135.000 $4,200.000 $2,681.880 $5,500.000 $3,300.000 $2,850.000
WIRE FENCE (TY A)
LF 1,325.000 $25.000 $12.500 $15.500 $7.000 $24.000 $25.000 $25.000 $30.950 $15.000 $29.000 $4.000
WIRE FENCE (REMOVE)
LF 1,325.000 $3.500 $3.000 $4.650 $3.000 $2.500 $5.000 $3.500 $11.720 $3.000 $5.000 $2.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $650.000 $550.000 $550.000 $550.000 $575.000 $760.000 $640.000 $550.000 $600.000 $650.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 41.000 $750.000 $625.000 $625.000 $825.000 $650.000 $750.000 $730.000 $625.000 $1,250.000 $735.000 $1,150.000
REMOVE SM RD SN SUP&AM
EA 41.000 $100.000 $100.000 $100.000 $135.000 $110.000 $135.000 $116.000 $100.000 $150.000 $115.000 $500.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 24,000.000 $0.400 $0.250 $0.250 $0.250 $0.260 $0.690 $0.700 $0.250 $0.500 $0.290 $1.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 24.000 $10.000 $12.000 $12.000 $13.250 $12.500 $3.390 $3.400 $12.000 $7.000 $14.000 $20.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 22,800.000 $0.400 $0.250 $0.250 $0.250 $0.260 $0.690 $0.700 $0.250 $0.500 $0.290 $1.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 200.000 $0.900 $2.100 $2.150 $2.500 $2.250 $0.890 $0.900 $2.150 $5.000 $2.500 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,200.000 $2.000 $5.000 $1.630 $1.250 $3.100 $2.500 $1.250 $1.000 $5.000 $1.850 $6.000
RE PM TY II (W) 6" (SLD)
LF 24,000.000 $0.400 $0.300 $0.300 $0.500 $0.350 $0.370 $0.400 $0.300 $0.500 $0.350 $1.000
RE PM TY II (W) 24" (SLD)
LF 48.000 $10.000 $12.000 $12.000 $14.000 $12.500 $0.670 $0.700 $12.000 $7.000 $14.000 $20.000
RE PM TY II (Y) 6" (SLD)
LF 22,800.000 $0.400 $0.320 $0.320 $0.500 $0.350 $0.260 $0.300 $0.320 $0.500 $0.380 $1.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 24,000.000 $1.250 $0.870 $0.870 $1.000 $0.900 $0.690 $0.700 $0.870 $1.500 $1.000 $1.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 24,000.000 $1.250 $0.870 $0.870 $1.000 $0.900 $0.690 $0.700 $0.870 $1.500 $1.000 $1.000
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 2,400.000 $5.000 $3.100 $3.150 $3.500 $3.300 $1.250 $1.250 $3.150 $8.000 $3.700 $1.000
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
LF 4,800.000 $5.000 $3.100 $3.150 $3.500 $3.300 $1.250 $1.250 $3.150 $7.000 $3.700 $1.000
REFL PAV MRKR TY II-A-A
EA 600.000 $5.000 $6.000 $6.000 $4.000 $6.500 $6.240 $6.250 $6.000 $10.000 $6.500 $6.000
ELIM EXT PM & MRKS (4")
LF 24,000.000 $0.600 $0.200 $0.200 $0.250 $0.250 $0.250 $0.250 $0.200 $1.500 $0.240 $1.000
BONDING COURSE
GAL 1,937.000 $5.000 $3.350 $3.080 $4.000 $3.500 $4.000 $4.000 $4.500 $6.000 $3.500 $6.000
TEMP SOLAR RD IL (FUR & INST)
EA 6.000 $10,000.000 $24,350.000 $24,350.000 $25,000.000 $26,000.000 $28,470.000 $30,285.000 $25,900.860 $29,000.000 $24,350.000 $30,000.000
TEMP SOLAR RD IL (MOVE)
EA 6.000 $2,000.000 $2,650.000 $2,650.000 $3,000.000 $3,000.000 $30,100.000 $3,296.000 $2,818.780 $3,000.000 $2,650.000 $6,500.000
TEMP SOLAR RD IL (REMOVE)
EA 6.000 $1,000.000 $1,000.000 $1,000.000 $1,100.000 $1,050.000 $1,170.000 $1,244.000 $1,063.690 $1,250.000 $1,000.000 $2,500.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $1,200.000 $3,000.000 $1,499.520 $1,800.000 $2,550.000 $1,550.000 $885.000 $1,000.000 $1,500.000 $1,750.000 $2,500.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 2.000 $2,700.000 $1,500.000 $1,499.520 $3,000.000 $4,100.000 $2,500.000 $2,100.000 $2,400.000 $2,500.000 $3,000.000 $2,500.000
Totals: $5,142,433.610 $4,482,346.630 $4,523,617.560 $4,614,423.750 $4,844,488.000 $5,117,874.790 $5,165,235.010 $5,213,820.805 $5,301,386.500 $5,578,412.490 $5,787,115.500