PREPARING ROW
|
STA
|
160.000
|
$3,000.000
|
$350.000
|
$1,140.850
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
35.000
|
$18.500
|
$48.000
|
$44.500
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
58.000
|
$8.000
|
$16.000
|
$26.260
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
207.000
|
$8.000
|
$10.000
|
$8.500
|
|
|
REMOVING CONC (MISC)
|
SY
|
92.000
|
$18.000
|
$41.000
|
$32.400
|
|
|
REMOVING STAB BASE & ASPH PAV(16")
|
SY
|
5,337.000
|
$8.500
|
$13.000
|
$20.260
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
16,360.000
|
$9.000
|
$20.000
|
$18.440
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
7,339.000
|
$12.000
|
$10.000
|
$27.670
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
44,410.000
|
$1.200
|
$1.400
|
$1.250
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
44,410.000
|
$0.200
|
$0.300
|
$0.190
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
22,205.000
|
$0.100
|
$0.300
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
22,205.000
|
$0.100
|
$0.300
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
812.000
|
$19.500
|
$35.000
|
$39.130
|
|
|
PROOF ROLLING
|
HR
|
53.000
|
$198.000
|
$118.000
|
$205.390
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
11,757.000
|
$39.000
|
$67.000
|
$47.350
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
8,531.000
|
$3.500
|
$4.200
|
$5.480
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
441.000
|
$115.000
|
$117.000
|
$153.360
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
6,661.000
|
$122.000
|
$117.000
|
$153.360
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
12,423.000
|
$45.000
|
$46.000
|
$60.250
|
|
|
CUT & RESTORING PAV
|
SY
|
319.000
|
$95.000
|
$225.000
|
$140.900
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
351.000
|
$5.000
|
$7.000
|
$5.920
|
|
|
TEMPORARY SPL SHORING
|
SF
|
30.000
|
$40.000
|
$350.000
|
$51.480
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
34.000
|
$490.000
|
$802.000
|
$586.290
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
588.000
|
$415.000
|
$544.000
|
$427.590
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
264.000
|
$180.000
|
$220.000
|
$120.660
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
158.000
|
$490.000
|
$540.000
|
$427.590
|
|
|
RAIL (TY SSTR)
|
LF
|
240.000
|
$45.000
|
$88.000
|
$81.710
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
400.000
|
$250.000
|
$330.000
|
$325.750
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
162.000
|
$300.000
|
$390.000
|
$381.730
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
121.000
|
$660.000
|
$560.000
|
$764.990
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
335.000
|
$56.000
|
$85.000
|
$73.610
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,163.000
|
$75.000
|
$107.000
|
$90.040
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
418.000
|
$100.000
|
$140.000
|
$121.840
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$5,500.000
|
$9,000.000
|
$7,001.960
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
4.000
|
$5,500.000
|
$11,600.000
|
$4,919.390
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
4.000
|
$14,000.000
|
$13,500.000
|
$10,191.700
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$16,000.000
|
$15,800.000
|
$11,230.800
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$18,000.000
|
$22,400.000
|
$12,634.030
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$1,600.000
|
$1,550.000
|
$1,369.260
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
13.000
|
$1,700.000
|
$1,670.000
|
$1,069.880
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
38.000
|
$1,900.000
|
$1,860.000
|
$1,282.100
|
|
|
REMOV STR (SET)
|
EA
|
31.000
|
$450.000
|
$360.000
|
$470.850
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,500.000
|
$1,300.000
|
$941.700
|
|
|
REMOV STR (PIPE)
|
LF
|
1,055.000
|
$18.000
|
$19.000
|
$7.580
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
133.000
|
$65.000
|
$90.000
|
$55.180
|
|
|
REMOV STR (RET WALL)
|
LF
|
18.000
|
$54.000
|
$1,100.000
|
$193.680
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$580,000.000
|
$400,000.000
|
$801,018.840
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$10,000.000
|
$2,000.000
|
$20,538.940
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$28.000
|
$34.000
|
$34.490
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$8.000
|
$29.000
|
$10.270
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,065.000
|
$3.250
|
$4.600
|
$2.820
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,065.000
|
$0.600
|
$1.150
|
$1.310
|
|
|
CONSTRUCTING DETOURS
|
SY
|
198.000
|
$53.000
|
$90.000
|
$61.390
|
|
|
DRIVEWAYS (CONC)
|
SY
|
36.000
|
$75.000
|
$134.000
|
$128.720
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,177.000
|
$34.000
|
$90.000
|
$111.250
|
|
|
TURNOUTS (ACP)
|
SY
|
135.000
|
$58.000
|
$92.000
|
$75.310
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,100.000
|
$28.000
|
$33.000
|
$27.620
|
|
|
SHORT RADIUS
|
LF
|
181.250
|
$35.000
|
$214.000
|
$34.990
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$806.000
|
$990.000
|
$901.420
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
14.000
|
$1,200.000
|
$1,400.000
|
$1,619.750
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
650.000
|
$23.000
|
$35.000
|
$27.610
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,800.000
|
$3,800.000
|
$2,764.590
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
12.000
|
$180.000
|
$242.000
|
$245.710
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$226.000
|
$284.000
|
$225.160
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
4.000
|
$390.000
|
$550.000
|
$389.910
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
9.000
|
$35.000
|
$40.000
|
$57.510
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
43.000
|
$550.000
|
$685.000
|
$618.530
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$660.000
|
$775.000
|
$757.610
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$850.000
|
$845.000
|
$1,367.700
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$750.000
|
$1,115.000
|
$1,014.720
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
33.000
|
$90.000
|
$114.000
|
$108.940
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
3.000
|
$16.000
|
$22.000
|
$24.550
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
46.000
|
$23.000
|
$23.000
|
$30.120
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
26.000
|
$66.000
|
$75.000
|
$71.840
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
31,902.000
|
$0.200
|
$0.300
|
$0.380
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,578.000
|
$0.200
|
$0.300
|
$0.380
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
32,237.000
|
$0.200
|
$0.300
|
$0.380
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
3,720.000
|
$3.000
|
$1.150
|
$3.420
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,965.000
|
$1.000
|
$1.800
|
$1.880
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,965.000
|
$0.920
|
$1.150
|
$1.010
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
221.000
|
$8.000
|
$7.400
|
$9.580
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
30.000
|
$130.000
|
$177.000
|
$205.390
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
12.000
|
$170.000
|
$210.000
|
$205.390
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
7,810.000
|
$0.250
|
$0.200
|
$0.210
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
30,891.000
|
$0.250
|
$0.200
|
$0.180
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,965.000
|
$0.500
|
$0.400
|
$0.510
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
221.000
|
$2.760
|
$3.400
|
$4.110
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
30.000
|
$60.000
|
$63.000
|
$68.460
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
12.000
|
$65.000
|
$85.000
|
$68.460
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
5,860.000
|
$0.200
|
$0.200
|
$0.210
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
34,589.000
|
$0.200
|
$0.200
|
$0.180
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,810.000
|
$0.500
|
$0.450
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,860.000
|
$0.500
|
$0.450
|
$0.600
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
30,891.000
|
$0.500
|
$0.800
|
$0.930
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
34,589.000
|
$0.500
|
$0.800
|
$0.930
|
|
REFL PAV MRKR TY I-C
|
EA
|
490.000
|
$4.000
|
$5.700
|
$5.070
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,089.000
|
$4.000
|
$5.700
|
$5.070
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
92,075.000
|
$0.300
|
$0.400
|
$0.640
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
940.000
|
$1.500
|
$1.200
|
$2.050
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
220.000
|
$2.000
|
$1.200
|
$4.110
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$75.000
|
$29.000
|
$75.310
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$85.000
|
$29.000
|
$75.310
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$7,500.000
|
$9,400.000
|
$13,692.630
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$500.000
|
$875.000
|
$684.630
|
|
|
RELOC MONUMENT SIGN AND DECORATIVE ROCK
|
LS
|
1.000
|
$15,000.000
|
$4,000.000
|
$16,431.160
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
10,725.000
|
$75.000
|
$71.000
|
$93.110
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
44.100
|
$96.000
|
$135.000
|
$178.000
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
3,583.000
|
$80.000
|
$99.000
|
$130.080
|
|
|
BONDING COURSE
|
GAL
|
6,927.000
|
$2.800
|
$4.200
|
$5.480
|
|
|
UNDERSEAL COURSE
|
GAL
|
24,851.000
|
$2.900
|
$4.000
|
$5.130
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$12,500.000
|
$4,792.420
|
|
|
TMA (STATIONARY)
|
DAY
|
60.000
|
$200.000
|
$285.000
|
$164.310
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
150.000
|
$145.000
|
$85.000
|
$61.620
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
14.000
|
$2,500.000
|
$1,300.000
|
$6,846.310
|
|
Totals: |
$6,315,388.810
|
$6,654,421.800
|
$8,045,054.957
|