PREPARING ROW
|
STA
|
654.000
|
$1,000.000
|
$1,475.000
|
$750.000
|
$650.000
|
$167.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
258.000
|
$29.650
|
$16.000
|
$25.000
|
$5.000
|
$17.000
|
|
|
REMOVE CONC (WINGWALL)
|
CY
|
4.000
|
$500.000
|
$52.000
|
$2,500.000
|
$934.000
|
$270.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
35.000
|
$15.290
|
$37.000
|
$60.000
|
$22.000
|
$26.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
53,821.000
|
$12.000
|
$4.000
|
$4.000
|
$8.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY AND CHANNEL)
|
CY
|
1,700.000
|
$27.930
|
$7.000
|
$11.000
|
$14.000
|
$17.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
43,905.000
|
$14.050
|
$4.000
|
$2.500
|
$3.000
|
$9.000
|
|
|
BACKFILL (TY A)
|
STA
|
654.000
|
$145.230
|
$150.000
|
$100.000
|
$134.000
|
$212.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$61.870
|
$60.000
|
$50.000
|
$31.000
|
$64.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
339,673.000
|
$0.420
|
$0.450
|
$0.330
|
$0.340
|
$0.300
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
339,673.000
|
$0.290
|
$0.400
|
$0.300
|
$0.310
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
5,894.000
|
$30.500
|
$30.000
|
$25.000
|
$26.000
|
$37.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
2,616.000
|
$12.800
|
$1.000
|
$0.100
|
$18.000
|
$32.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
45,276.000
|
$27.000
|
$28.000
|
$32.000
|
$31.000
|
$30.000
|
|
|
REWRKING BS MTRL(TY B)(5")(DC)(ORG POS)
|
CY
|
24,268.000
|
$8.500
|
$6.000
|
$10.000
|
$8.000
|
$12.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
263,017.000
|
$2.200
|
$1.750
|
$2.000
|
$0.750
|
$2.500
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
3,907.000
|
$164.140
|
$130.000
|
$155.000
|
$259.000
|
$147.000
|
|
|
CEMENT
|
TON
|
2,348.000
|
$181.870
|
$150.000
|
$160.000
|
$164.000
|
$168.000
|
|
|
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
|
SY
|
250,358.000
|
$2.000
|
$2.500
|
$1.300
|
$0.750
|
$3.300
|
|
|
SALV,HAUL & STKPL RCL APH PV (2")
|
SY
|
174,733.000
|
$1.160
|
$1.700
|
$1.000
|
$1.500
|
$2.300
|
|
|
PRIME COAT (MC-30)
|
GAL
|
47,278.000
|
$3.750
|
$3.400
|
$4.500
|
$4.000
|
$4.200
|
|
|
ASPH (TIER II)
|
GAL
|
70,917.000
|
$4.250
|
$3.750
|
$4.500
|
$4.000
|
$5.250
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
1,970.000
|
$80.000
|
$40.000
|
$100.000
|
$83.000
|
$58.000
|
|
|
PLAN & TEXT ASPH CONC PAV (1.5")
|
SY
|
441.000
|
$31.000
|
$12.000
|
$10.000
|
$2.000
|
$26.000
|
|
|
CEM STABIL BKFL
|
CY
|
527.000
|
$139.000
|
$39.000
|
$95.000
|
$58.000
|
$41.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
510.000
|
$102.360
|
$46.000
|
$75.000
|
$72.000
|
$22.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
535.000
|
$59.000
|
$34.000
|
$100.000
|
$59.000
|
$35.000
|
|
|
SAND BACKFILL
|
CY
|
475.000
|
$31.000
|
$25.000
|
$75.000
|
$25.000
|
$25.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
76.000
|
$60.000
|
$54.000
|
$70.000
|
$68.000
|
$17.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
601.000
|
$26.000
|
$4.000
|
$1.000
|
$7.000
|
$4.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
71.000
|
$497.370
|
$335.000
|
$425.000
|
$470.000
|
$340.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
385.000
|
$372.220
|
$330.000
|
$440.000
|
$444.000
|
$340.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
17.000
|
$426.480
|
$405.000
|
$575.000
|
$521.000
|
$420.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
224.000
|
$481.630
|
$295.000
|
$400.000
|
$376.000
|
$310.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,608.000
|
$40.000
|
$35.000
|
$53.000
|
$38.000
|
$36.000
|
|
|
RC PIPE (CL III)(18 IN)(SPL)
|
LF
|
1,308.000
|
$60.000
|
$37.000
|
$63.000
|
$39.000
|
$38.000
|
|
|
RC PIPE (CL III)(30 IN)(SPL)
|
LF
|
48.000
|
$100.000
|
$70.000
|
$105.000
|
$101.000
|
$72.000
|
|
|
RC PIPE (CL III)(36 IN)(SPL)
|
LF
|
488.000
|
$110.000
|
$95.000
|
$128.000
|
$117.000
|
$98.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
4.000
|
$5,238.760
|
$4,100.000
|
$5,200.000
|
$4,410.000
|
$4,200.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 60 IN)
|
EA
|
2.000
|
$9,000.000
|
$9,000.000
|
$17,500.000
|
$14,419.000
|
$9,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$9,635.780
|
$10,000.000
|
$17,000.000
|
$11,065.000
|
$10,300.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$12,798.300
|
$11,400.000
|
$20,000.000
|
$11,065.000
|
$11,800.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
34.000
|
$1,000.000
|
$850.000
|
$1,200.000
|
$894.000
|
$865.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
16.000
|
$1,194.920
|
$850.000
|
$1,200.000
|
$894.000
|
$865.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$1,322.350
|
$925.000
|
$1,300.000
|
$992.000
|
$950.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
178.000
|
$1,100.000
|
$865.000
|
$1,300.000
|
$992.000
|
$890.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$1,875.000
|
$2,300.000
|
$1,599.000
|
$1,942.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$433.850
|
$1,700.000
|
$1,500.000
|
$596.000
|
$1,570.000
|
|
|
REMOV STR (SET)
|
EA
|
58.000
|
$487.760
|
$200.000
|
$350.000
|
$203.000
|
$158.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4,552.000
|
$12.000
|
$6.000
|
$10.000
|
$11.000
|
$5.500
|
|
|
REMOV STR (PIPE)
|
EA
|
5.000
|
$467.290
|
$600.000
|
$1,000.000
|
$947.000
|
$525.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$950,000.000
|
$1,200,000.000
|
$1,001,500.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$6,000.000
|
$3,450.000
|
$5,000.000
|
$9,369.000
|
$5,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
576.000
|
$31.980
|
$50.000
|
$35.000
|
$18.000
|
$26.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
576.000
|
$27.950
|
$20.000
|
$10.000
|
$5.000
|
$16.000
|
|
|
TEMP PAVED FLUME (INSTALL)
|
SY
|
35.000
|
$33.820
|
$50.000
|
$225.000
|
$100.000
|
$42.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
936.000
|
$38.330
|
$15.000
|
$114.160
|
$12.000
|
$37.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
936.000
|
$11.520
|
$8.000
|
$24.960
|
$5.960
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,765.000
|
$3.880
|
$4.000
|
$3.330
|
$3.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,765.000
|
$1.070
|
$1.500
|
$0.600
|
$0.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
7,608.000
|
$4.000
|
$5.000
|
$5.470
|
$6.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,608.000
|
$1.180
|
$1.000
|
$0.600
|
$0.500
|
$1.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
234.000
|
$70.000
|
$55.000
|
$115.000
|
$87.000
|
$70.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,034.000
|
$40.000
|
$35.000
|
$40.000
|
$27.000
|
$52.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
655.000
|
$33.670
|
$110.000
|
$75.000
|
$27.000
|
$135.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$22.050
|
$39.000
|
$37.500
|
$30.000
|
$40.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$2,297.830
|
$1,400.000
|
$1,400.000
|
$1,600.000
|
$1,470.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,989.200
|
$3,000.000
|
$2,900.000
|
$3,000.000
|
$3,050.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
38.000
|
$292.400
|
$200.000
|
$195.000
|
$232.000
|
$205.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
4.000
|
$290.000
|
$225.000
|
$215.000
|
$314.000
|
$225.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
1.000
|
$391.890
|
$300.000
|
$300.000
|
$715.000
|
$315.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
917.000
|
$30.140
|
$16.000
|
$16.000
|
$35.000
|
$17.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
104.000
|
$656.000
|
$500.000
|
$495.000
|
$768.000
|
$520.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$850.000
|
$825.000
|
$800.000
|
$842.000
|
$840.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$986.440
|
$1,200.000
|
$1,150.000
|
$1,201.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
105.000
|
$147.660
|
$100.000
|
$65.000
|
$76.000
|
$68.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
38.000
|
$20.010
|
$75.000
|
$15.000
|
$41.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND(BI)
|
EA
|
229.000
|
$25.000
|
$50.000
|
$45.000
|
$111.000
|
$48.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
44.000
|
$150.000
|
$53.000
|
$52.500
|
$115.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
71,257.000
|
$0.520
|
$0.600
|
$0.600
|
$0.500
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
232.000
|
$1.100
|
$1.200
|
$1.200
|
$1.000
|
$1.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
291.000
|
$20.000
|
$14.000
|
$14.000
|
$14.000
|
$15.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$58.120
|
$200.000
|
$200.000
|
$200.000
|
$210.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
4.000
|
$65.020
|
$275.000
|
$275.000
|
$275.000
|
$290.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
8,880.000
|
$0.250
|
$0.500
|
$0.450
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
99,073.000
|
$0.490
|
$0.400
|
$0.400
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
525.000
|
$0.740
|
$0.700
|
$0.650
|
$0.750
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
32.000
|
$10.000
|
$12.000
|
$12.000
|
$12.000
|
$13.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
20.000
|
$0.910
|
$0.700
|
$0.650
|
$0.750
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
36,336.000
|
$0.840
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
31.000
|
$1.210
|
$1.000
|
$3.000
|
$3.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,279.000
|
$1.370
|
$1.000
|
$3.000
|
$3.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
606.000
|
$1.180
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
396.000
|
$6.570
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
386.000
|
$6.660
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
15,200.000
|
$0.580
|
$0.800
|
$0.750
|
$0.750
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
15,386.000
|
$0.670
|
$0.800
|
$0.750
|
$0.750
|
$0.800
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
125,921.000
|
$0.600
|
$0.650
|
$0.650
|
$0.650
|
$0.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$209.430
|
$190.000
|
$185.000
|
$185.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$375.000
|
$400.000
|
$375.000
|
$375.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$245.220
|
$300.000
|
$275.000
|
$275.000
|
$290.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
32.000
|
$4.900
|
$8.000
|
$8.000
|
$8.000
|
$9.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,348.000
|
$4.500
|
$5.500
|
$5.000
|
$5.000
|
$5.250
|
|
TRAFFIC BUTTON TY Y
|
EA
|
2,956.000
|
$3.320
|
$1.000
|
$0.750
|
$0.750
|
$0.800
|
|
TRAFFIC BUTTON TY B
|
EA
|
22,002.000
|
$3.000
|
$1.300
|
$1.250
|
$1.000
|
$1.300
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
37,451.000
|
$0.730
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
16.000
|
$4.500
|
$5.000
|
$5.000
|
$5.000
|
$5.250
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
400.000
|
$66.870
|
$90.000
|
$50.000
|
$20.000
|
$126.000
|
|
|
IRRIGATION GATE (18")
|
EA
|
4.000
|
$6,000.000
|
$6,600.000
|
$10,000.000
|
$7,451.000
|
$6,800.000
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
40,460.000
|
$108.000
|
$88.000
|
$100.000
|
$114.000
|
$105.000
|
|
|
BONDING COURSE
|
GAL
|
16,547.000
|
$3.550
|
$2.500
|
$4.000
|
$5.000
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,159.270
|
$6,500.000
|
$250.000
|
$4,564.000
|
$33,900.000
|
|
|
TMA (STATIONARY)
|
DAY
|
758.000
|
$273.320
|
$15.000
|
$10.000
|
$75.000
|
$180.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$414.550
|
$1.000
|
$500.000
|
$125.000
|
$620.000
|
|
Totals: |
$14,854,432.240
|
$12,441,758.700
|
$13,385,145.520
|
$13,586,176.660
|
$15,028,760.750
|