County: WILLACY Highway: FM 1018 Date: 08/04/2021 (3 years ago) Engineer's Estimate: $14,854,432 Control Number: 1236-01-015
Project: F 2021(843) District: PHARR Time: 379 WORKING DAYS Type: RECONSTRUCT EXISTING ROADWAY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $14,854,432.24
FOREMOST PAVING, INC.   $12,441,758.70 1
-16.24% | -$2,412,673.54
IOC COMPANY LLC   $13,385,145.52 2
-9.89% | -$1,469,286.72
7.58% | $943,386.82
TEXAS CORDIA CONSTRUCTION, LLC   $13,586,176.66 3
-8.54% | -$1,268,255.58
9.2% | $1,144,417.96
1.50% | $201,031.14
ANDERSON COLUMBIA CO., INC.   $15,028,760.75 4
1.17% | $174,328.51
20.79% | $2,587,002.05
10.62% | $1,442,584.09
Subcontractor Percentage Amount
GP7 CONSTRUCTION INC. 6.65% $827,376.95
SOIL TECH ADVANCE INC. 4.30% $534,995.62
HIGHWAY BARRICADES AND SERVICES, LLC 3.08% $383,206.17
Total: 14.03% $1,745,578.74

Bid Items

Items: 114, 0 filtered
WILLACY FM 1018  |  PHARR  |  1236-01-015  |  08/04/2021  |  $14,854,432  |  F 2021(843)  |  RECON EXIST ROADWAY  |  379 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate FOREMOST PAVING, INC. IOC COMPANY LLC TEXAS CORDIA CONSTRUCTION, LLC ANDERSON COLUMBIA CO., INC.
100 6002 PREPARING ROW STA 654.000 $1,000.000 $1,475.000 $750.000 $650.000 $167.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 258.000 $29.650 $16.000 $25.000 $5.000 $17.000
104 6025 REMOVE CONC (WINGWALL) CY 4.000 $500.000 $52.000 $2,500.000 $934.000 $270.000
104 6044 REMOVING CONC (FLUME) SY 35.000 $15.290 $37.000 $60.000 $22.000 $26.000
110 6001 EXCAVATION (ROADWAY) CY 53,821.000 $12.000 $4.000 $4.000 $8.000 $12.000
110 6004 EXCAVATION (ROADWAY AND CHANNEL) CY 1,700.000 $27.930 $7.000 $11.000 $14.000 $17.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 43,905.000 $14.050 $4.000 $2.500 $3.000 $9.000
134 6001 BACKFILL (TY A) STA 654.000 $145.230 $150.000 $100.000 $134.000 $212.000
160 6005 FURNISHING AND PLACING TOPSOIL CY 50.000 $61.870 $60.000 $50.000 $31.000 $64.000
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 339,673.000 $0.420 $0.450 $0.330 $0.340 $0.300
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 339,673.000 $0.290 $0.400 $0.300 $0.310 $0.200
168 6001 VEGETATIVE WATERING MG 5,894.000 $30.500 $30.000 $25.000 $26.000 $37.000
204 6003 SPRINKLING (DUST CONTROL) MG 2,616.000 $12.800 $1.000 $0.100 $18.000 $32.000
247 6225 FL BS (RDWY DEL)(TY E GR 4)(FNAL POS) CY 45,276.000 $27.000 $28.000 $32.000 $31.000 $30.000
251 6094 REWRKING BS MTRL(TY B)(5")(DC)(ORG POS) CY 24,268.000 $8.500 $6.000 $10.000 $8.000 $12.000
260 6011 LIME TRT (EXST MATL) (12") SY 263,017.000 $2.200 $1.750 $2.000 $0.750 $2.500
260 6043 LIME (HYD, COM OR QK)(SLURRY) TON 3,907.000 $164.140 $130.000 $155.000 $259.000 $147.000
275 6001 CEMENT TON 2,348.000 $181.870 $150.000 $160.000 $164.000 $168.000
275 6061 CEM TRT (MX EXT MTL/NW BASE)(DC)(10") SY 250,358.000 $2.000 $2.500 $1.300 $0.750 $3.300
305 6018 SALV,HAUL & STKPL RCL APH PV (2") SY 174,733.000 $1.160 $1.700 $1.000 $1.500 $2.300
310 6009 PRIME COAT (MC-30) GAL 47,278.000 $3.750 $3.400 $4.500 $4.000 $4.200
316 6005 ASPH (TIER II) GAL 70,917.000 $4.250 $3.750 $4.500 $4.000 $5.250
316 6486 AGGR (TY-D GR-4P)(SAC-B) CY 1,970.000 $80.000 $40.000 $100.000 $83.000 $58.000
354 6119 PLAN & TEXT ASPH CONC PAV (1.5") SY 441.000 $31.000 $12.000 $10.000 $2.000 $26.000
400 6005 CEM STABIL BKFL CY 527.000 $139.000 $39.000 $95.000 $58.000 $41.000
400 6008 CUT & RESTORE ASPH PAVING SY 510.000 $102.360 $46.000 $75.000 $72.000 $22.000
400 6010 STRUCT EXCAV (SPECIAL) CY 535.000 $59.000 $34.000 $100.000 $59.000 $35.000
400 6011 SAND BACKFILL CY 475.000 $31.000 $25.000 $75.000 $25.000 $25.000
400 6012 CUT AND RESTORE PAV (FLEX BASE) SY 76.000 $60.000 $54.000 $70.000 $68.000 $17.000
402 6001 TRENCH EXCAVATION PROTECTION LF 601.000 $26.000 $4.000 $1.000 $7.000 $4.000
432 6003 RIPRAP (CONC)(6 IN) CY 71.000 $497.370 $335.000 $425.000 $470.000 $340.000
432 6010 RIPRAP (CONC)(CL B)(5 IN) CY 385.000 $372.220 $330.000 $440.000 $444.000 $340.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 17.000 $426.480 $405.000 $575.000 $521.000 $420.000
462 6009 CONC BOX CULV (5 FT X 5 FT) LF 224.000 $481.630 $295.000 $400.000 $376.000 $310.000
464 6003 RC PIPE (CL III)(18 IN) LF 2,608.000 $40.000 $35.000 $53.000 $38.000 $36.000
464 6038 RC PIPE (CL III)(18 IN)(SPL) LF 1,308.000 $60.000 $37.000 $63.000 $39.000 $38.000
464 6040 RC PIPE (CL III)(30 IN)(SPL) LF 48.000 $100.000 $70.000 $105.000 $101.000 $72.000
464 6041 RC PIPE (CL III)(36 IN)(SPL) LF 488.000 $110.000 $95.000 $128.000 $117.000 $98.000
465 6147 INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT) EA 4.000 $5,238.760 $4,100.000 $5,200.000 $4,410.000 $4,200.000
466 6013 HEADWALL (CH - FW - 0) (DIA= 60 IN) EA 2.000 $9,000.000 $9,000.000 $17,500.000 $14,419.000 $9,000.000
466 6179 WINGWALL (PW - 1) (HW=4 FT) EA 1.000 $9,635.780 $10,000.000 $17,000.000 $11,065.000 $10,300.000
466 6180 WINGWALL (PW - 1) (HW=5 FT) EA 1.000 $12,798.300 $11,400.000 $20,000.000 $11,065.000 $11,800.000
467 6357 SET (TY II) (18 IN) (RCP) (3: 1) (P) EA 34.000 $1,000.000 $850.000 $1,200.000 $894.000 $865.000
467 6359 SET (TY II) (18 IN) (RCP) (4: 1) (P) EA 16.000 $1,194.920 $850.000 $1,200.000 $894.000 $865.000
467 6362 SET (TY II) (18 IN) (RCP) (6: 1) (C) EA 4.000 $1,322.350 $925.000 $1,300.000 $992.000 $950.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 178.000 $1,100.000 $865.000 $1,300.000 $992.000 $890.000
467 6418 SET (TY II) (30 IN) (RCP) (3: 1) (P) EA 2.000 $4,000.000 $1,875.000 $2,300.000 $1,599.000 $1,942.000
480 6001 CLEAN EXIST CULVERTS EA 5.000 $433.850 $1,700.000 $1,500.000 $596.000 $1,570.000
496 6004 REMOV STR (SET) EA 58.000 $487.760 $200.000 $350.000 $203.000 $158.000
496 6007 REMOV STR (PIPE) LF 4,552.000 $12.000 $6.000 $10.000 $11.000 $5.500
496 6016 REMOV STR (PIPE) EA 5.000 $467.290 $600.000 $1,000.000 $947.000 $525.000
500 6001 MOBILIZATION LS 1.000 $1,000,000.000 $950,000.000 $1,200,000.000 $1,001,500.000 $1,500,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 25.000 $6,000.000 $3,450.000 $5,000.000 $9,369.000 $5,600.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 576.000 $31.980 $50.000 $35.000 $18.000 $26.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 576.000 $27.950 $20.000 $10.000 $5.000 $16.000
506 6018 TEMP PAVED FLUME (INSTALL) SY 35.000 $33.820 $50.000 $225.000 $100.000 $42.000
506 6021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 936.000 $38.330 $15.000 $114.160 $12.000 $37.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 936.000 $11.520 $8.000 $24.960 $5.960 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,765.000 $3.880 $4.000 $3.330 $3.000 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,765.000 $1.070 $1.500 $0.600 $0.500 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 7,608.000 $4.000 $5.000 $5.470 $6.000 $5.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 7,608.000 $1.180 $1.000 $0.600 $0.500 $1.000
530 6004 DRIVEWAYS (CONC) SY 234.000 $70.000 $55.000 $115.000 $87.000 $70.000
530 6005 DRIVEWAYS (ACP) SY 5,034.000 $40.000 $35.000 $40.000 $27.000 $52.000
530 6009 TURNOUTS (SURF TREAT) SY 655.000 $33.670 $110.000 $75.000 $27.000 $135.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 250.000 $22.050 $39.000 $37.500 $30.000 $40.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $2,297.830 $1,400.000 $1,400.000 $1,600.000 $1,470.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 $2,989.200 $3,000.000 $2,900.000 $3,000.000 $3,050.000
560 6014 MAILBOX INSTALL-S (TWG-POST) TY 4 EA 38.000 $292.400 $200.000 $195.000 $232.000 $205.000
560 6022 MAILBOX INSTALL-D (TWG-POST) TY 4 EA 4.000 $290.000 $225.000 $215.000 $314.000 $225.000
560 6023 MAILBOX INSTALL-M (TWG-POST) TY 4 EA 1.000 $391.890 $300.000 $300.000 $715.000 $315.000
636 6001 ALUMINUM SIGNS (TY A) SF 917.000 $30.140 $16.000 $16.000 $35.000 $17.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 104.000 $656.000 $500.000 $495.000 $768.000 $520.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 1.000 $850.000 $825.000 $800.000 $842.000 $840.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $986.440 $1,200.000 $1,150.000 $1,201.000 $1,200.000
644 6076 REMOVE SM RD SN SUP&AM EA 105.000 $147.660 $100.000 $65.000 $76.000 $68.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 38.000 $20.010 $75.000 $15.000 $41.000 $16.000
658 6093 INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND(BI) EA 229.000 $25.000 $50.000 $45.000 $111.000 $48.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 44.000 $150.000 $53.000 $52.500 $115.000 $55.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 71,257.000 $0.520 $0.600 $0.600 $0.500 $0.600
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 232.000 $1.100 $1.200 $1.200 $1.000 $1.250
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 291.000 $20.000 $14.000 $14.000 $14.000 $15.000
662 6017 WK ZN PAV MRK NON-REMOV (W)(ARROW) EA 4.000 $58.120 $200.000 $200.000 $200.000 $210.000
662 6029 WK ZN PAV MRK NON-REMOV(W)(WORD) EA 4.000 $65.020 $275.000 $275.000 $275.000 $290.000
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 8,880.000 $0.250 $0.500 $0.450 $0.500 $0.500
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 99,073.000 $0.490 $0.400 $0.400 $0.500 $0.500
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 525.000 $0.740 $0.700 $0.650 $0.750 $0.700
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 32.000 $10.000 $12.000 $12.000 $12.000 $13.000
662 6093 WK ZN PAV MRK REMOV (Y)4"(BRK) LF 20.000 $0.910 $0.700 $0.650 $0.750 $0.700
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 36,336.000 $0.840 $0.500 $0.500 $0.500 $0.500
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 31.000 $1.210 $1.000 $3.000 $3.000 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 5,279.000 $1.370 $1.000 $3.000 $3.000 $1.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 606.000 $1.180 $1.000 $1.000 $1.000 $1.000
666 6047 REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 396.000 $6.570 $6.000 $6.000 $6.000 $6.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 386.000 $6.660 $6.000 $6.000 $6.000 $6.000
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 15,200.000 $0.580 $0.800 $0.750 $0.750 $0.800
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 15,386.000 $0.670 $0.800 $0.750 $0.750 $0.800
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 125,921.000 $0.600 $0.650 $0.650 $0.650 $0.700
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 6.000 $209.430 $190.000 $185.000 $185.000 $200.000
668 6078 PREFAB PAV MRK TY C (W) (DBL ARROW) EA 2.000 $375.000 $400.000 $375.000 $375.000 $400.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 8.000 $245.220 $300.000 $275.000 $275.000 $290.000
672 6007 REFL PAV MRKR TY I-C EA 32.000 $4.900 $8.000 $8.000 $8.000 $9.000
672 6009 REFL PAV MRKR TY II-A-A EA 1,348.000 $4.500 $5.500 $5.000 $5.000 $5.250
672 6017 TRAFFIC BUTTON TY Y EA 2,956.000 $3.320 $1.000 $0.750 $0.750 $0.800
672 6018 TRAFFIC BUTTON TY B EA 22,002.000 $3.000 $1.300 $1.250 $1.000 $1.300
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 37,451.000 $0.730 $0.500 $0.500 $0.500 $0.500
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 16.000 $4.500 $5.000 $5.000 $5.000 $5.250
700 6001 POTHOLE REPAIR (STANDARD) SY 400.000 $66.870 $90.000 $50.000 $20.000 $126.000
1007 6001 IRRIGATION GATE (18") EA 4.000 $6,000.000 $6,600.000 $10,000.000 $7,451.000 $6,800.000
3076 6049 D-GR HMA TY-D SAC-A PG76-22 TON 40,460.000 $108.000 $88.000 $100.000 $114.000 $105.000
3084 6001 BONDING COURSE GAL 16,547.000 $3.550 $2.500 $4.000 $5.000 $3.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $10,159.270 $6,500.000 $250.000 $4,564.000 $33,900.000
6185 6002 TMA (STATIONARY) DAY 758.000 $273.320 $15.000 $10.000 $75.000 $180.000
6185 6005 TMA (MOBILE OPERATION) DAY 40.000 $414.550 $1.000 $500.000 $125.000 $620.000
Totals: $14,854,432.24 $12,441,758.70 $13,385,145.52 $13,586,176.66 $15,028,760.75