Show Job Controls
Bid Cobra

WILLACY SH 186 (0433-02-052)

Items: 168

County: WILLACY
Length: N/A
Highway: SH 186
District: PHARR
Control Number: 0433-02-052
DBE Goal: N/A
Project: C 433-2-52
Guaranty: N/A
Time: 560 WORKING DAYS
Engineer's Estimate: $22,069,390.53
Date: 08/07/2018 (7 years ago)
Contract Number: N/A
Type: REHABILITATE ROADWAY (SUPER 2)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$22,069,390.53
1
Awarded
$20,899,927.85
Over/Under Est: -5.3% -$1,169,462.68
$22,574,349.98
Over/Under Est: 2.29% $504,959.45
Amt Left: 8.01% $1,674,422.13
$22,879,489.64
Over/Under Est: 3.67% $810,099.11
Amt Left: 9.47% $1,979,561.79
Delta: -1.35% -$305,139.66
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 3.42% $791,046.10
GULF COAST CONTRACTORS, INC. 0.66% $152,658.02
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.48% $111,024.01
Total: 4.56% $1,054,728.13

Bid Items & Bid Tabulations

168 Total 0 of 168
WILLACY  |  SH 186  |  PHARR  |  0433-02-052  |  08/07/2018  |  $22,069,390.53  |  C 433-2-52  |  REHAB ROADWAY (SUPER 2)  |  560 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ASAGO, LLC
FOREMOST PAVING, INC.
TEXAS SAI, INC.
PREPARING ROW
STA 688.730 $250.000 $200.000 $210.000 $400.000
REMOVING CONC (PAV)
SY 70,752.000 $4.000 $2.500 $2.000 $7.000
REMOVING CONC (RIPRAP)
SY 79.000 $40.000 $15.000 $30.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 648.000 $9.340 $11.000 $20.000 $15.000
REMOVE STAB BASE & ASPH (8")
CY 32,489.000 $5.000 $2.700 $7.000 $8.000
OBLITERATING ABANDONED ROAD
SY 13,013.000 $3.000 $1.500 $0.500 $2.500
EXCAVATION (ROADWAY)
CY 54,498.000 $4.000 $2.000 $6.000 $9.250
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 133,884.000 $3.500 $3.000 $7.500 $8.150
FURNISHING AND PLACING TOPSOIL
CY 50.000 $32.500 $30.000 $20.000 $33.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 378,731.000 $0.330 $0.160 $0.200 $0.140
DRILL SEEDING (TEMP) (WARM)
SY 378,731.000 $0.230 $0.160 $0.170 $0.140
VEGETATIVE WATERING
MG 6,350.000 $22.500 $1.000 $25.000 $5.000
SPRINKLING (DUST CONTROL)
MG 5,208.000 $13.400 $1.000 $1.000 $5.000
PROOF ROLLING
HR 69.000 $75.000 $25.000 $13.000 $80.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 51,782.000 $20.000 $18.000 $16.000 $28.000
RWRK BS MTL(TY B)(8")(DEN CNT)(ORG POS)
CY 35,505.000 $5.500 $4.500 $5.000 $14.000
REWORK BS MATL (TY B)(10")(DC)(ORG POS)
CY 29,433.000 $5.500 $5.500 $5.000 $4.250
LIME TRT (EXST MATL) (12")
SY 79,995.000 $1.750 $1.000 $2.100 $1.600
LIME (HYD, COM OR QK)(SLURRY)
TON 1,584.000 $150.000 $210.000 $127.000 $200.000
CEMENT
TON 9,067.000 $155.000 $160.000 $150.000 $130.000
CEMENT TREAT (EXIST MATL)(12")
SY 348,527.000 $1.750 $1.000 $2.400 $1.500
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
SY 415,273.000 $1.750 $1.000 $1.670 $0.500
ASPHALT STAB BASE (GR 4)(PG 64)
TON 1,771.000 $75.000 $65.000 $72.000 $75.000
SALV, HAUL & STKPL RCL APH PV (4 TO 6")
SY 302,797.000 $2.250 $1.250 $2.400 $1.750
SALV, HAUL & STKPL RCL APH PV (3")
SY 105,928.000 $2.000 $1.000 $1.300 $0.900
PRIME COAT (MC-30)
GAL 83,480.000 $3.200 $3.500 $3.100 $4.250
ASPH (TIER II)
GAL 122,768.000 $3.000 $3.000 $3.700 $3.000
AGGR (GR 4P)
CY 3,410.000 $60.000 $65.000 $43.000 $72.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
TON 70,664.000 $69.750 $81.000 $80.000 $80.000
PLAN & TEXT ASPH CONC PAV (1.5")
SY 13,877.000 $2.500 $2.500 $2.700 $4.000
PAV JT UNDERSEAL (24")
LF 151.000 $38.000 $40.000 $38.000 $20.000
CEM STABIL BKFL
CY 1,759.000 $45.000 $40.000 $46.000 $55.000
CUT & RESTORE ASPH PAVING
SY 2,597.000 $23.000 $27.000 $40.000 $70.000
STRUCT EXCAV (SPECIAL)
CY 806.000 $36.000 $55.000 $33.000 $68.000
TRENCH EXCAVATION PROTECTION
LF 2,096.000 $2.500 $1.000 $3.850 $5.150
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $140.000 $200.000 $185.000 $270.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 56.000 $265.000 $320.000 $320.000 $320.000
RIPRAP (CONC) (CL B) (4")
CY 195.000 $350.000 $320.000 $320.000 $410.000
RIPRAP (CONC)(CL B)(5 IN)
CY 8.000 $390.000 $600.000 $350.000 $435.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $378.000 $440.000 $350.000 $435.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 151.000 $57.000 $20.000 $40.000 $20.000
CONC BOX CULV (7 FT X 5 FT)(MOD)
LF 140.000 $400.000 $400.000 $360.000 $879.000
RC PIPE (CL III)(18 IN)
LF 4,844.000 $40.000 $40.000 $27.000 $36.000
RC PIPE (CL III)(24 IN)
LF 1,566.000 $50.000 $45.000 $36.000 $43.000
RC PIPE (CL III)(30 IN)
LF 86.000 $105.000 $65.000 $51.000 $60.000
RC PIPE (CL III)(36 IN)
LF 292.000 $109.000 $80.000 $69.000 $79.000
RC PIPE (CL III)(18 IN)(SPL)
LF 27.000 $31.000 $40.000 $29.000 $65.000
RC PIPE (CL III)(24 IN)(SPL)
LF 32.000 $40.000 $47.000 $42.000 $65.000
RC PIPE (CL III)(36 IN)(SPL)
LF 452.000 $75.000 $83.000 $73.000 $77.000
RC PIPE (CL III)(54 IN)(SPL)
LF 168.000 $135.000 $135.000 $133.000 $146.000
RC PIPE (CL IV) (24 IN) (SPL)
LF 656.000 $49.000 $50.000 $45.000 $44.000
RC PIPE (CL IV) (30 IN) (SPL)
LF 1,588.000 $75.000 $65.000 $59.000 $57.000
RC PIPE (CL IV) (36 IN) (SPL)
LF 432.000 $110.000 $90.000 $77.000 $77.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 4.000 $3,900.000 $3,500.000 $2,850.000 $3,504.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 4.000 $4,250.000 $4,000.000 $3,270.000 $4,102.000
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX3FT)
EA 2.000 $5,250.000 $4,800.000 $4,530.000 $5,366.000
WINGWALL (FW-0)(HW=9 FT)(MOD)
EA 1.000 $19,000.000 $15,000.000 $10,650.000 $14,150.000
WINGWALL (FW-0)(HW=10 FT)(MOD)
EA 1.000 $19,500.000 $16,000.000 $11,650.000 $15,025.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 326.000 $650.000 $1,000.000 $800.000 $921.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 18.000 $1,100.000 $1,100.000 $900.000 $1,161.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 36.000 $1,015.000 $1,100.000 $900.000 $1,161.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $1,100.000 $1,100.000 $1,000.000 $1,326.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 38.000 $1,500.000 $1,300.000 $1,450.000 $1,573.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 12.000 $2,000.000 $1,600.000 $1,850.000 $1,917.000
REMOV STR (INLET)
EA 3.000 $700.000 $250.000 $350.000 $753.000
REMOV STR (SET)
EA 64.000 $140.000 $100.000 $185.000 $194.000
REMOV STR (HEADWALL)
EA 8.000 $300.000 $300.000 $900.000 $1,819.000
REMOV STR (PIPE)
LF 8,345.000 $6.500 $3.750 $7.000 $4.000
REMOV STR (BOX CULVERT)
LF 183.000 $26.000 $23.000 $75.000 $78.000
MOBILIZATION
LS 1.000 $1,248,000.000 $1,443,000.000 $1,900,000.000 $1,257,676.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $7,000.000 $2,750.000 $3,500.000 $3,753.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 57.000 $47.750 $60.000 $70.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 57.000 $14.250 $10.000 $22.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 2,808.000 $16.600 $8.000 $17.000 $27.000
CONSTRUCTION EXITS (REMOVE)
SY 2,808.000 $7.000 $1.000 $10.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,396.000 $2.500 $2.000 $2.500 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,396.000 $0.600 $0.500 $0.450 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 11,076.000 $4.000 $8.000 $3.500 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 11,076.000 $0.600 $0.500 $0.500 $1.000
CONSTRUCTING DETOURS
SY 113,736.000 $25.000 $22.000 $15.000 $19.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 11,040.000 $15.000 $40.000 $17.500 $16.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,276.000 $32.000 $35.000 $9.500 $22.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 360.000 $32.000 $35.000 $10.000 $30.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 43,592.000 $5.000 $5.000 $5.200 $4.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 11,040.000 $2.000 $5.000 $6.200 $5.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,276.000 $6.500 $5.000 $8.000 $12.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 360.000 $5.500 $5.000 $8.000 $20.000
DRIVEWAYS (CONC)
SY 648.000 $46.000 $50.000 $43.000 $50.000
DRIVEWAYS (ACP)
SY 9,373.000 $26.000 $35.000 $26.000 $33.000
TURNOUTS (ACP)
SY 7,265.000 $30.000 $40.000 $48.000 $36.000
RUMBLE STRIPS (CENTERLINE)
LF 46,042.000 $0.150 $0.220 $0.250 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $26.000 $31.000 $24.000 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,450.000 $1,800.000 $1,725.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $8.900 $1.150 $3.000 $10.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $190.000 $110.000 $250.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,910.000 $2,400.000 $2,750.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $1,010.000 $110.000 $150.000 $300.000
CRASH CUSH ATTEN (INSTL)
EA 40.000 $14,500.000 $11,000.000 $13,750.000 $8,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 90.000 $1,300.000 $750.000 $2,950.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 41.000 $792.000 $250.000 $750.000 $550.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $8,000.000 $11,000.000 $13,750.000 $15,000.000
CHAIN LINK FENCE (INSTALL) (6')
LF 8.000 $17.000 $300.000 $250.000 $100.000
CHAIN LINK FENCE (REMOVE)
LF 8.000 $13.000 $100.000 $57.000 $10.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 59.000 $200.000 $95.000 $175.000 $180.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 2.000 $1,650.000 $640.000 $850.000 $610.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 4.000 $3,310.000 $4,000.000 $3,200.000 $3,750.000
CONDT (PVC) (SCH 40) (2")
LF 936.000 $6.000 $12.000 $7.000 $12.000
CONDT (PVC) (SCH 40) (4")
LF 16.000 $18.000 $54.000 $23.000 $52.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 270.000 $20.000 $33.000 $25.000 $32.000
ELEC CONDR (NO.8) BARE
LF 1,224.000 $1.250 $1.700 $1.500 $1.650
ELEC CONDR (NO.8) INSULATED
LF 2,380.000 $1.250 $1.700 $1.500 $1.650
ELEC CONDR (NO.6) INSULATED
LF 36.000 $2.400 $3.250 $5.000 $3.200
TRAY CABLE (4 CONDR) (12 AWG)
LF 786.000 $2.000 $3.700 $2.300 $3.600
GROUND BOX TY A (122311)W/APRON
EA 4.000 $725.000 $1,150.000 $770.000 $1,100.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 500.000 $3.000 $5.200 $2.500 $5.000
ELC SRV TY T 120/240 000(NS)GS(T)TS(O)
EA 1.000 $1,250.000 $2,990.000 $2,850.000 $4,000.000
ALUMINUM SIGNS (TY A)
SF 668.500 $22.000 $12.000 $18.000 $18.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 157.000 $541.000 $400.000 $450.000 $450.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 25.000 $728.000 $535.000 $650.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 19.000 $820.000 $580.000 $1,125.000 $1,125.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $620.000 $150.000 $250.000 $250.000
REMOVE SM RD SN SUP&AM
EA 161.000 $110.000 $22.500 $55.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 8.000 $50.000 $123.000 $60.000 $60.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 60.000 $86.000 $75.000 $60.000 $60.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 16.000 $15.000 $11.500 $15.000 $15.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 4,277.000 $2.500 $2.350 $3.000 $2.900
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 338,366.000 $0.600 $0.530 $0.500 $0.550
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 52.000 $7.000 $8.300 $12.000 $8.800
WK ZN PAV MRK REMOV (W)(ARROW)
EA 4.000 $81.000 $360.000 $200.000 $160.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 1.000 $220.000 $360.000 $300.000 $220.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 336,578.000 $0.600 $0.530 $0.450 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,235.000 $0.560 $0.550 $1.000 $1.080
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 26,798.000 $0.500 $0.550 $1.000 $1.020
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 7,248.000 $1.000 $1.050 $0.650 $1.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 23,862.000 $1.900 $0.620 $0.700 $0.900
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 116.000 $3.000 $2.600 $2.000 $4.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 200.000 $7.000 $6.200 $4.000 $8.800
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 9,012.000 $3.000 $3.100 $2.000 $3.800
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 14,520.000 $0.730 $0.350 $0.320 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 11,380.000 $0.470 $0.320 $0.320 $0.380
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 265,590.000 $0.530 $0.330 $0.320 $0.320
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 274,160.000 $0.500 $0.370 $0.700 $0.580
PREFAB PAV MRK TY B (W)(ARROW)
EA 70.000 $220.000 $210.000 $600.000 $280.000
PREFAB PAV MRK TY B (W)(WORD)
EA 58.000 $625.000 $235.000 $650.000 $295.000
PREFAB PAV MRK TY B (W)(SYMBOL)
EA 32.000 $600.000 $440.000 $900.000 $420.000
REFL PAV MRKR TY I-C
EA 1,892.000 $5.500 $3.100 $3.000 $2.800
REFL PAV MRKR TY II-A-A
EA 7,484.000 $3.500 $3.100 $2.900 $2.800
ELIM EXT PAV MRK & MRKS (4")
LF 83,837.000 $0.650 $0.360 $0.400 $0.600
ELIM EXT PAV MRK & MRKS (8")
LF 993.000 $0.900 $0.670 $0.800 $0.900
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $1,250.000 $12,600.000 $1,850.000 $12,000.000
REMOVING TRAFFIC SIGNALS
EA 3.000 $5,300.000 $1,730.000 $2,200.000 $1,650.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $205.000 $310.000 $235.000 $300.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $205.000 $310.000 $235.000 $300.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 445.000 $2.000 $3.500 $2.200 $3.400
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 2.000 $4,000.000 $4,600.000 $4,470.000 $4,400.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 2.000 $4,800.000 $6,200.000 $6,320.000 $6,000.000
POTHOLE REPAIR (STANDARD)
SY 100.000 $42.000 $85.000 $179.000 $100.000
TRANSPLANT PLANT MATERIAL (TYPE I)
EA 48.000 $1,000.000 $900.000 $950.000 $695.000
PRSSR IRRIG PVC PIPE (18")
LF 216.000 $29.000 $28.000 $34.000 $11.000
PRSSR IRRIG PVC PIPE (24")
LF 408.000 $40.000 $45.000 $42.500 $9.000
PRSSR IRRIGATION PVC PIPE (15")
LF 216.000 $19.000 $23.000 $29.000 $11.000
RC LOW HEAD PRSSR PIPE (CL III)(24")
LF 70.000 $90.000 $63.000 $55.000 $25.000
RC LOW HEAD PRSSR PIPE (CL III)(30")
LF 104.000 $100.000 $70.000 $67.000 $21.000
RC LOW HEAD PRSSR PIPE (CL III)(42")
LF 92.000 $143.000 $117.000 $111.000 $100.000
BIRD EXCLUSION METHOD
SF 7,000.000 $2.000 $2.000 $2.850 $2.850
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $16.000 $175.000 $200.000 $200.000
TMA (STATIONARY)
EA 2.000 $13,257.000 $5,000.000 $2,500.000 $400.000
TMA (MOBILE OPERATION)
DAY 40.000 $189.000 $250.000 $100.000 $55.000
Totals: $22,069,390.530 $20,899,927.850 $22,574,349.980 $22,879,489.640