WILBARGER FM 925 (0832-02-029)

Items: 54

County: WILBARGER
Length: N/A
Highway: FM 925
District: WICHITA FALLS
Control Number: 0832-02-029
DBE Goal: N/A
Project: BR 2022(945)
Guaranty: N/A
Time: 132 WORKING DAYS
Engineer's Estimate: $983,954.82
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$983,954.82
Over/Under Est: 29.8% $293,263.68
$1,317,632.50
Over/Under Est: 33.91% $333,677.68
Amt Left: 3.16% $40,414.00
Over/Under Est: 64.27% $632,373.68
Amt Left: 26.55% $339,110.00
Delta: -22.67% -$298,696.00

Bid Items & Bid Tabulations

54 Total 0 of 54
WILBARGER  |  FM 925  |  WICHITA FALLS  |  0832-02-029  |  08/03/2022  |  $983,954.82  |  BR 2022(945)  |  BRIDGE REPL  |  132 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
EARTH BUILDERS, L.P.
HODGES AND SON CONSTRUCTION COMPANY, INC.
REMOVING CONC (MISC)
CY 69.000 $100.000 $100.000 $50.000 $100.000
EXCAVATION (ROADWAY)
CY 159.000 $19.950 $15.000 $25.000 $50.000
EXCAVATION (CHANNEL)
CY 750.000 $13.330 $35.000 $25.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,183.000 $20.320 $40.000 $30.000 $40.000
BLOCK SODDING
SY 1,689.000 $4.840 $6.000 $6.500 $10.000
BROADCAST SEED (TEMP) (WARM)
SY 845.000 $0.150 $1.250 $1.100 $5.000
BROADCAST SEED (TEMP) (COOL)
SY 845.000 $0.150 $1.250 $1.100 $5.000
VEGETATIVE WATERING
MG 28.500 $200.000 $25.000 $120.000 $1.000
PROOF ROLLING
HR 4.000 $300.000 $70.000 $100.000 $80.000
CEMENT
TON 9.000 $509.190 $165.000 $400.000 $300.000
CEMENT TREAT (SUBGRADE) (8")
SY 810.000 $7.530 $20.000 $15.000 $30.000
PRIME COAT (MC-30)
GAL 177.000 $14.190 $5.000 $20.000 $20.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 256.000 $2.140 $250.000 $25.000 $40.000
CEM STABIL BKFL
CY 94.000 $82.330 $250.000 $320.000 $300.000
DRILL SHAFT (36 IN)
LF 150.000 $244.900 $250.000 $450.000 $300.000
CL C CONC (ABUT)(HPC)
CY 33.800 $969.180 $1,100.000 $2,000.000 $2,000.000
REINF CONC SLAB (HPC)
SF 1,800.000 $22.240 $45.000 $42.000 $30.000
APPROACH SLAB (HPC)
CY 45.000 $523.080 $700.000 $800.000 $1,000.000
PRESTR CONC GIRDER (TX28)
LF 238.000 $165.000 $165.000 $280.000 $410.000
RIPRAP (CONC)(5 IN)
CY 33.000 $762.000 $500.000 $550.000 $600.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 863.000 $103.310 $160.000 $175.000 $225.000
RIPRAP (MOW STRIP)(4 IN)
CY 52.000 $611.490 $480.000 $550.000 $600.000
RAIL (TY T552)(HPC)
LF 272.700 $50.430 $145.000 $200.000 $250.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 56.000 $121.120 $225.000 $200.000 $180.000
CONC BOX CULV (10 FT X 4 FT)
LF 162.500 $1,000.000 $1,250.000 $900.000 $1,200.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $24,000.000 $15,000.000 $22,000.000 $16,000.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $20,000.000 $20,000.000 $25,000.000 $18,000.000
REMOV STR (BOX CULVERT)
EA 1.000 $10,000.000 $12,000.000 $18,000.000 $50,000.000
REMOV STR (WINGWALL)
EA 2.000 $3,500.000 $1,800.000 $3,500.000 $10,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $16,600.000 $40,000.000 $25,000.000 $50,000.000
REMOV STR (SMALL FENCE)
LF 320.000 $3.280 $3.000 $5.000 $5.000
MOBILIZATION
LS 1.000 $89,370.630 $125,000.000 $140,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $4,500.000 $2,200.000 $17,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 337.000 $32.290 $32.000 $50.000 $5.000
ROCK FILTER DAMS (REMOVE)
LF 337.000 $11.610 $11.000 $21.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,280.000 $2.500 $3.000 $4.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,280.000 $0.790 $1.500 $1.250 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 252.000 $3.590 $3.000 $7.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 252.000 $0.890 $1.500 $1.000 $5.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $27.880 $25.000 $30.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,227.300 $1,800.000 $2,200.000 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,216.650 $2,800.000 $3,400.000 $3,200.000
WIRE FENCE (TY C)
LF 400.000 $17.230 $18.000 $22.000 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $922.000 $180.000 $800.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 3.000 $90.330 $140.000 $150.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $28.320 $7.000 $22.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $30.730 $25.000 $32.000 $50.000
PREFAB PAV MRK TY C (Y) (4") (BRK)
LF 445.000 $10.000 $2.000 $12.000 $10.000
PREFAB PAV MRK TY C (Y) (4") (SLD)
LF 90.000 $10.000 $2.000 $12.000 $20.000
TACK COAT
GAL 109.000 $200.000 $5.000 $20.000 $10.000
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
TON 179.000 $210.000 $250.000 $270.000 $225.000
D-GR HMA TY-B PG70-22 (EXEMPT)
TON 156.000 $9.360 $225.000 $270.000 $250.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 4.000 $300.000 $350.000 $250.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 56.000 $65.850 $75.000 $100.000 $125.000
Totals: $983,954.825 $1,277,218.500 $1,317,632.500 $1,616,328.500