|
|
REMOVING CONC (RIPRAP)
|
SY
|
16.000
|
$50.000
|
$20.500
|
$25.000
|
$145.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
500.000
|
$8.000
|
$8.150
|
$9.000
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (13")
|
SY
|
2,823.000
|
$14.000
|
$14.500
|
$23.000
|
$19.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,461.000
|
$17.000
|
$15.500
|
$26.000
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
5,263.000
|
$25.000
|
$34.500
|
$31.000
|
$15.000
|
|
|
BLOCK SODDING
|
SY
|
648.000
|
$6.300
|
$5.400
|
$5.500
|
$5.250
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
31,489.000
|
$0.150
|
$0.140
|
$0.150
|
$0.140
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
15,745.000
|
$0.100
|
$0.220
|
$0.220
|
$0.210
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
15,745.000
|
$0.100
|
$0.220
|
$0.220
|
$0.210
|
|
|
VEGETATIVE WATERING
|
MG
|
269.000
|
$35.000
|
$29.500
|
$20.000
|
$45.000
|
|
|
CEMENT
|
TON
|
384.000
|
$175.000
|
$185.000
|
$195.000
|
$210.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
35,552.000
|
$3.300
|
$4.750
|
$4.000
|
$5.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
8,901.000
|
$4.250
|
$4.300
|
$6.000
|
$6.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
2,731.000
|
$5.000
|
$4.550
|
$4.500
|
$6.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
208.000
|
$700.000
|
$155.000
|
$850.000
|
$165.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
2,980.000
|
$80.000
|
$155.000
|
$91.000
|
$165.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
11,989.000
|
$3.000
|
$5.250
|
$10.000
|
$7.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
201.000
|
$60.000
|
$62.000
|
$65.000
|
$65.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
6.000
|
$1,100.000
|
$830.000
|
$845.000
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
24.000
|
$600.000
|
$545.000
|
$560.000
|
$1,009.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
16.000
|
$550.000
|
$425.000
|
$430.000
|
$700.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
18.000
|
$750.000
|
$630.000
|
$640.000
|
$1,000.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
16.000
|
$850.000
|
$715.000
|
$725.000
|
$1,100.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
43.000
|
$750.000
|
$790.000
|
$800.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
54.000
|
$300.000
|
$290.000
|
$300.000
|
$275.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
32.000
|
$325.000
|
$465.000
|
$480.000
|
$450.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$18,000.000
|
$21,500.000
|
$22,000.000
|
$26,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$6,250.000
|
$6,200.000
|
$6,500.000
|
$11,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$5,250.000
|
$7,300.000
|
$7,500.000
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$7,250.000
|
$8,500.000
|
$8,600.000
|
$16,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,000.000
|
$4,500.000
|
$4,600.000
|
$6,000.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$4,000.000
|
$10,500.000
|
$11,000.000
|
$6,500.000
|
|
|
SET (TY II) (54 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$10,000.000
|
$24,000.000
|
$25,000.000
|
$19,000.000
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
6.000
|
$175.000
|
$46.500
|
$47.000
|
$400.000
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$325.000
|
$180.000
|
$185.000
|
$200.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,100.000
|
$780.000
|
$800.000
|
$1,150.000
|
|
|
REMOV STR (PIPE)
|
LF
|
64.000
|
$25.000
|
$8.300
|
$9.000
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$349,136.000
|
$440,000.000
|
$300,000.000
|
$530,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$10,000.000
|
$28,500.000
|
$9,000.000
|
$13,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
576.000
|
$28.000
|
$36.000
|
$35.000
|
$39.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
576.000
|
$10.000
|
$12.500
|
$10.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,700.000
|
$3.000
|
$3.600
|
$3.700
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,700.000
|
$1.000
|
$1.050
|
$1.100
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,700.000
|
$4.000
|
$3.750
|
$4.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,700.000
|
$0.850
|
$0.820
|
$0.800
|
$2.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
6,985.000
|
$11.000
|
$16.000
|
$105.000
|
$12.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$27.500
|
$29.000
|
$29.000
|
$32.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,600.000
|
$1,100.000
|
$1,100.000
|
$1,900.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.250
|
$4.150
|
$4.500
|
$3.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$250.000
|
$310.000
|
$320.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,100.000
|
$2,900.000
|
$3,000.000
|
$3,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$350.000
|
$310.000
|
$320.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
97.000
|
$625.000
|
$710.000
|
$610.000
|
$875.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
34.000
|
$800.000
|
$1,000.000
|
$820.000
|
$1,125.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$550.000
|
$650.000
|
$450.000
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
96.000
|
$75.000
|
$105.000
|
$85.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
|
EA
|
24.000
|
$90.000
|
$81.000
|
$116.000
|
$115.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
50.000
|
$25.000
|
$26.000
|
$22.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
5.000
|
$30.000
|
$35.000
|
$36.000
|
$27.250
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
5.000
|
$100.000
|
$81.000
|
$116.000
|
$140.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,282.000
|
$1.000
|
$1.050
|
$0.600
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
22,200.000
|
$0.850
|
$0.930
|
$0.800
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
26,795.000
|
$0.400
|
$0.430
|
$0.400
|
$0.380
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
48.000
|
$205.000
|
$260.000
|
$260.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
24.000
|
$350.000
|
$285.000
|
$370.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
154.000
|
$40.000
|
$31.000
|
$45.000
|
$40.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
72.000
|
$4.150
|
$3.100
|
$5.500
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,280.000
|
$3.250
|
$3.500
|
$3.500
|
$3.250
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
21,734.000
|
$85.000
|
$115.000
|
$105.000
|
$127.000
|
|
|
BONDING COURSE
|
GAL
|
6,964.000
|
$3.500
|
$2.850
|
$2.500
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
136.000
|
$85.000
|
$88.000
|
$200.000
|
$250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
170.000
|
$200.000
|
$180.000
|
$220.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
85.000
|
$500.000
|
$780.000
|
$40.000
|
$100.000
|
|
Totals: |
$3,920,528.400
|
$5,165,943.810
|
$5,336,471.850
|
$5,379,101.710
|