Items: 73

County: WILBARGER
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0043-07-119
DBE Goal: N/A
Project: F 2021(700)
Guaranty: N/A
Time: 136 WORKING DAYS
Engineer's Estimate: $3,920,528.40
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$3,920,528.40
$5,165,943.81
Over/Under Est: 31.77% $1,245,415.41
$5,336,471.85
Over/Under Est: 36.12% $1,415,943.45
Amt Left: 3.3% $170,528.04
$5,379,101.71
Over/Under Est: 37.2% $1,458,573.31
Amt Left: 4.13% $213,157.90
Delta: -0.80% -$42,629.86

Bid Items & Bid Tabulations

73 Total 0 of 73
WILBARGER  |  US 287  |  WICHITA FALLS  |  0043-07-119  |  07/02/2021  |  $3,920,528.40  |  F 2021(700)  |  HAZARD ELIM & SAFETY  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
A. L. HELMCAMP, INC.
GILVIN-TERRILL, LTD.
REMOVING CONC (RIPRAP)
SY 16.000 $50.000 $20.500 $25.000 $145.000
REMOVING CONCRETE(MOW STRIP)
LF 500.000 $8.000 $8.150 $9.000 $12.000
REMOVING STAB BASE AND ASPH PAV (13")
SY 2,823.000 $14.000 $14.500 $23.000 $19.000
EXCAVATION (ROADWAY)
CY 10,461.000 $17.000 $15.500 $26.000 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 5,263.000 $25.000 $34.500 $31.000 $15.000
BLOCK SODDING
SY 648.000 $6.300 $5.400 $5.500 $5.250
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 31,489.000 $0.150 $0.140 $0.150 $0.140
DRILL SEEDING (TEMP) (WARM)
SY 15,745.000 $0.100 $0.220 $0.220 $0.210
DRILL SEEDING (TEMP) (COOL)
SY 15,745.000 $0.100 $0.220 $0.220 $0.210
VEGETATIVE WATERING
MG 269.000 $35.000 $29.500 $20.000 $45.000
CEMENT
TON 384.000 $175.000 $185.000 $195.000 $210.000
CEMENT TREAT (SUBGRADE) (8")
SY 35,552.000 $3.300 $4.750 $4.000 $5.000
PRIME COAT (MC-30)
GAL 8,901.000 $4.250 $4.300 $6.000 $6.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 2,731.000 $5.000 $4.550 $4.500 $6.000
PFC (ASPHALT) PG76-22
TON 208.000 $700.000 $155.000 $850.000 $165.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 2,980.000 $80.000 $155.000 $91.000 $165.000
PLANE ASPH CONC PAV (1.5")
SY 11,989.000 $3.000 $5.250 $10.000 $7.000
TEMPORARY SPL SHORING
SF 201.000 $60.000 $62.000 $65.000 $65.000
CL A CONC (COLLAR)
EA 6.000 $1,100.000 $830.000 $845.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $600.000 $545.000 $560.000 $1,009.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 16.000 $550.000 $425.000 $430.000 $700.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 18.000 $750.000 $630.000 $640.000 $1,000.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 16.000 $850.000 $715.000 $725.000 $1,100.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 43.000 $750.000 $790.000 $800.000 $1,200.000
RC PIPE (CL III)(42 IN)
LF 54.000 $300.000 $290.000 $300.000 $275.000
RC PIPE (CL III)(54 IN)
LF 32.000 $325.000 $465.000 $480.000 $450.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $18,000.000 $21,500.000 $22,000.000 $26,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $6,250.000 $6,200.000 $6,500.000 $11,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $5,250.000 $7,300.000 $7,500.000 $15,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $7,250.000 $8,500.000 $8,600.000 $16,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $4,000.000 $4,500.000 $4,600.000 $6,000.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 3.000 $4,000.000 $10,500.000 $11,000.000 $6,500.000
SET (TY II) (54 IN) (RCP) (4: 1) (C)
EA 2.000 $10,000.000 $24,000.000 $25,000.000 $19,000.000
REMOV & RE - LAY PIPE (36 IN)
LF 6.000 $175.000 $46.500 $47.000 $400.000
REMOV STR (SET)
EA 12.000 $325.000 $180.000 $185.000 $200.000
REMOV STR (WINGWALL)
EA 2.000 $1,100.000 $780.000 $800.000 $1,150.000
REMOV STR (PIPE)
LF 64.000 $25.000 $8.300 $9.000 $40.000
MOBILIZATION
LS 1.000 $349,136.000 $440,000.000 $300,000.000 $530,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $28,500.000 $9,000.000 $13,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 576.000 $28.000 $36.000 $35.000 $39.000
ROCK FILTER DAMS (REMOVE)
LF 576.000 $10.000 $12.500 $10.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,700.000 $3.000 $3.600 $3.700 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,700.000 $1.000 $1.050 $1.100 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,700.000 $4.000 $3.750 $4.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,700.000 $0.850 $0.820 $0.800 $2.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 6,985.000 $11.000 $16.000 $105.000 $12.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $27.500 $29.000 $29.000 $32.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,600.000 $1,100.000 $1,100.000 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $3.250 $4.150 $4.500 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $250.000 $310.000 $320.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,100.000 $2,900.000 $3,000.000 $3,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $310.000 $320.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 97.000 $625.000 $710.000 $610.000 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 34.000 $800.000 $1,000.000 $820.000 $1,125.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $550.000 $650.000 $450.000 $700.000
REMOVE SM RD SN SUP&AM
EA 96.000 $75.000 $105.000 $85.000 $100.000
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
EA 24.000 $90.000 $81.000 $116.000 $115.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 50.000 $25.000 $26.000 $22.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $30.000 $35.000 $36.000 $27.250
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 5.000 $100.000 $81.000 $116.000 $140.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,282.000 $1.000 $1.050 $0.600 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 22,200.000 $0.850 $0.930 $0.800 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 26,795.000 $0.400 $0.430 $0.400 $0.380
PREFAB PAV MRK TY C (W) (ARROW)
EA 48.000 $205.000 $260.000 $260.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 24.000 $350.000 $285.000 $370.000 $350.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 154.000 $40.000 $31.000 $45.000 $40.000
REFL PAV MRKR TY II-A-A
EA 72.000 $4.150 $3.100 $5.500 $5.000
REFL PAV MRKR TY II-C-R
EA 2,280.000 $3.250 $3.500 $3.500 $3.250
D-GR HMA TY-B PG70-22
TON 21,734.000 $85.000 $115.000 $105.000 $127.000
BONDING COURSE
GAL 6,964.000 $3.500 $2.850 $2.500 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 136.000 $85.000 $88.000 $200.000 $250.000
TMA (STATIONARY)
DAY 170.000 $200.000 $180.000 $220.000 $150.000
TMA (MOBILE OPERATION)
DAY 85.000 $500.000 $780.000 $40.000 $100.000
Totals: $3,920,528.400 $5,165,943.810 $5,336,471.850 $5,379,101.710